Title Page
-
COMPANY NAME
-
Tech name
-
Conducted on
-
Node Site ID
-
Location
-
INSTRUCTIONS
1. Answer "Yes," "No," or "N/A" on the questions below.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Action click on the paperclip icon then "Add Action," provide a description, assign to a member, set priority, and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link.
FTTN
-
SITE ADDRESS VALIDATION • Is the site address correct?
-
Complete the Task
-
On the work order, write the correct address against the task order
-
• Is the access information correct?
-
Complete the Task
-
On the work order, write the correct site access information against the task
On siting Change Request
-
NODE OBSTRUCTIONS • Are there obstructions?
-
Complete the Task
-
Make a note of the obstruction against the task on the work order and attach a photo of the obstruction
-
PHYSICAL NODE CABINET CONDITION • Are there signs of damage or graffiti
-
Complete the Task
-
Make a note of the damage/ graffiti against the task on the work order and attach a photo of the damage/graffiti
-
PLINTH INTEGRITY • Concrete plinth shows signs of cracking or erosion
-
Complete the Task
-
Make a note of the damage against the task on the work order and attach a photo of the damage
-
DOOR ALIGNMENT AND OPERATION • Is there evidence of tampering?
-
Complete the Task
-
Make a note of your findings against the task on the work order
-
• Is there evidence of the door, hinge or lock not operating correctly?
-
Complete the Task
-
Make a note of your findings against the task on the work order
-
GALAXY LOCKS • Does the lock need replacing?
-
Complete the Task
-
Make a note of your findings against the task on the work order
-
NODE PEST CONTROL • Is there evidence of spiders, rodents, snakes, ants etc?
-
Complete the Task
-
Make a note of your findings against the task on the work order and attach a photo, seal entry point if possible and make note of entry point
-
NODE DOOR SEAL INTEGRITY • Are the cabinet seals clean?
-
Complete the Task
-
Clean seals if possible otherwise make a note against the task on the work order and attach a photo
-
INTERNAL COMPARTMENTS • Is there dust, dirt or moisture in the cabinet?
-
Complete the Task
-
Clean cabinet if possible otherwise make a note against the task on the work order and attach a photo
-
DOOR MESH • Is there rust evident on the mesh?
-
Complete the Task
-
Make a note against the task on the work order and attach a photo.
-
AIR ENTRY AND EXIT • Are the air vents clean and unobstructed?
-
Complete the Task
-
Clear the obstruction and reassess otherwise make a note against the task on the work order and attach a photo
-
• Are the copper fins and HEX clear?
-
Complete the Task
-
Make a note against the task on the work order and attach a photo
-
FAN UNITS • Are the fans working correctly?
-
Complete the Task
-
Make a note against the task on the work order and attach a photo
-
• Is any bearing or fan making an abnormal noise?
-
Complete the Task
-
Make a note against the task on the work order and attach a photo
-
CIRCUIT BREAKERS • Are blanking panels installed?
-
Complete the Task
-
Make a note against the task on the work order
-
RECTIFIER UNITS • Is the air intake free of obstructions and dust?
-
Complete the Task
-
Clean and reassess otherwise make a note against the task on the work order and attach a photo
-
• Is any bearing or fan making an abnormal noise?
-
Complete the Task
-
Make a note against the task on the work order
-
ISAM INSPECTION • Is dust or moisture visible?
-
Complete the Task
-
Remove dust and moisture and reassess otherwise make a note against the task on the work order and attach a photo
-
• Is any bearing or fan making an abnormal noise?
-
Complete the Task
-
Make a note against the task on the work order
-
FILTER INSPECTION • Is the filter clean?
-
Complete the Task
-
Clean the filter and reassess otherwise Make a note against the task on the work order and attach a photo
-
CAPPED FIBRE PORTS • Are the fibre ports fitted with caps?
-
Complete the Task
-
BLANKING PANELS • Do all unused slots have filler cards?
-
Complete the Task
-
BATTERY COMPARTMENT • Are the battery terminals corroded?
-
Complete the Task
-
Make a note against the task on the work order
-
• Are the battery cables intact?
-
Complete the Task
-
Make a note against the task on the work order
-
• Do the batteries have abnormalities?
-
Complete the Task
-
Make a note against the task on the work order
-
BATTERY CELL VOLTAGE • Are the individual cell voltages of the batteries around 13v per cell?
-
Write the voltages of each battery cell against the task on the work order
-
BATTERY VOLTAGE • Is the battery voltage within the range of -40.5 volts to -60 volt?
-
Against the task on the work order write the Battery Voltage reading from the controller unit
-
BATTERY CURRENT • Is the rectifier current within the range of -100Amp to 100Amp?
-
Write the Battery Current reading from the controller unit, against the task on the work order
-
INCOMING DUCTS • Are the glands sealed?
-
Complete the Task
-
CCF OVP • Are the OVP modules filled and not blown?
-
Complete the Task
-
Make a note against the task on the work order and attach a photo
-
Make a note against the task on the work order and attach a photo
-
• Can the OVP modules be pushed fully in?
-
Complete the Task
-
Make a note against the task on the work order and attach a photo
-
CCF SPLITTERS • Are the splitters firmly plugged in?
-
Complete the Task
-
Make a note against the task on the work order and attach a photo
-
EARTH CABLING • Are the earth link connections secure?
-
Complete the Task
-
Make a note against the task on the work order and attach a photo
-
INCOMING AC MAINS • Are the AC Mains terminal block and incoming AC mains cables secure and free from damage?
-
Complete the Task
-
Make a note against the task on the work order and attach a photo
-
AC MAINS CHANGEOVER • Is the AC mains generator changeover switch secure and free from damage?
-
Complete the Task
-
Make a note against the task on the work order and attach a photo
-
GENERATOR PLUG / SOCKET • Is the generator plug (Alcatel/Nokia) or socket (Commscope) free from damage and serviceable?
-
Complete the Task
-
Make a note against the task on the work order and attach a photo
On Completion
-
CLOSE NODE CABINET • On completion of the work order tasks close and lock the cabinet door and take final picture.
-
PAUSE CRQ • Notify the FTTN NOC to advise them to pause the CRQ
-
RETURN KEY • Return any keys to the person who gave them to you.
Additional Comments
Sign off
-
INSPECTORS NAME AND SIGNATURE