Title Page

  • COMPANY NAME

  • Tech name

  • Conducted on

  • Node Site ID

  • Location
  • INSTRUCTIONS

    1. Answer "Yes," "No," or "N/A" on the questions below.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Action click on the paperclip icon then "Add Action," provide a description, assign to a member, set priority, and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link.

FTTN

  • SITE ADDRESS VALIDATION • Is the site address correct?

  • Complete the Task

  • On the work order, write the correct address against the task order

  • • Is the access information correct?

  • Complete the Task

  • On the work order, write the correct site access information against the task

On siting Change Request

  • NODE OBSTRUCTIONS • Are there obstructions?

  • Complete the Task

  • Make a note of the obstruction against the task on the work order and attach a photo of the obstruction

  • PHYSICAL NODE CABINET CONDITION • Are there signs of damage or graffiti

  • Complete the Task

  • Make a note of the damage/ graffiti against the task on the work order and attach a photo of the damage/graffiti

  • PLINTH INTEGRITY • Concrete plinth shows signs of cracking or erosion

  • Complete the Task

  • Make a note of the damage against the task on the work order and attach a photo of the damage

  • DOOR ALIGNMENT AND OPERATION • Is there evidence of tampering?

  • Complete the Task

  • Make a note of your findings against the task on the work order

  • • Is there evidence of the door, hinge or lock not operating correctly?

  • Complete the Task

  • Make a note of your findings against the task on the work order

  • GALAXY LOCKS • Does the lock need replacing?

  • Complete the Task

  • Make a note of your findings against the task on the work order

  • NODE PEST CONTROL • Is there evidence of spiders, rodents, snakes, ants etc?

  • Complete the Task

  • Make a note of your findings against the task on the work order and attach a photo, seal entry point if possible and make note of entry point

  • NODE DOOR SEAL INTEGRITY • Are the cabinet seals clean?

  • Complete the Task

  • Clean seals if possible otherwise make a note against the task on the work order and attach a photo

  • INTERNAL COMPARTMENTS • Is there dust, dirt or moisture in the cabinet?

  • Complete the Task

  • Clean cabinet if possible otherwise make a note against the task on the work order and attach a photo

  • DOOR MESH • Is there rust evident on the mesh?

  • Complete the Task

  • Make a note against the task on the work order and attach a photo.

  • AIR ENTRY AND EXIT • Are the air vents clean and unobstructed?

  • Complete the Task

  • Clear the obstruction and reassess otherwise make a note against the task on the work order and attach a photo

  • • Are the copper fins and HEX clear?

  • Complete the Task

  • Make a note against the task on the work order and attach a photo

  • FAN UNITS • Are the fans working correctly?

  • Complete the Task

  • Make a note against the task on the work order and attach a photo

  • • Is any bearing or fan making an abnormal noise?

  • Complete the Task

  • Make a note against the task on the work order and attach a photo

  • CIRCUIT BREAKERS • Are blanking panels installed?

  • Complete the Task

  • Make a note against the task on the work order

  • RECTIFIER UNITS • Is the air intake free of obstructions and dust?

  • Complete the Task

  • Clean and reassess otherwise make a note against the task on the work order and attach a photo

  • • Is any bearing or fan making an abnormal noise?

  • Complete the Task

  • Make a note against the task on the work order

  • ISAM INSPECTION • Is dust or moisture visible?

  • Complete the Task

  • Remove dust and moisture and reassess otherwise make a note against the task on the work order and attach a photo

  • • Is any bearing or fan making an abnormal noise?

  • Complete the Task

  • Make a note against the task on the work order

  • FILTER INSPECTION • Is the filter clean?

  • Complete the Task

  • Clean the filter and reassess otherwise Make a note against the task on the work order and attach a photo

  • CAPPED FIBRE PORTS • Are the fibre ports fitted with caps?

  • Complete the Task

  • BLANKING PANELS • Do all unused slots have filler cards?

  • Complete the Task

  • BATTERY COMPARTMENT • Are the battery terminals corroded?

  • Complete the Task

  • Make a note against the task on the work order

  • • Are the battery cables intact?

  • Complete the Task

  • Make a note against the task on the work order

  • • Do the batteries have abnormalities?

  • Complete the Task

  • Make a note against the task on the work order

  • BATTERY CELL VOLTAGE • Are the individual cell voltages of the batteries around 13v per cell?

  • Write the voltages of each battery cell against the task on the work order

  • BATTERY VOLTAGE • Is the battery voltage within the range of -40.5 volts to -60 volt?

  • Against the task on the work order write the Battery Voltage reading from the controller unit

  • BATTERY CURRENT • Is the rectifier current within the range of -100Amp to 100Amp?

  • Write the Battery Current reading from the controller unit, against the task on the work order

  • INCOMING DUCTS • Are the glands sealed?

  • Complete the Task

  • CCF OVP • Are the OVP modules filled and not blown?

  • Complete the Task

  • Make a note against the task on the work order and attach a photo

  • Make a note against the task on the work order and attach a photo

  • • Can the OVP modules be pushed fully in?

  • Complete the Task

  • Make a note against the task on the work order and attach a photo

  • CCF SPLITTERS • Are the splitters firmly plugged in?

  • Complete the Task

  • Make a note against the task on the work order and attach a photo

  • EARTH CABLING • Are the earth link connections secure?

  • Complete the Task

  • Make a note against the task on the work order and attach a photo

  • INCOMING AC MAINS • Are the AC Mains terminal block and incoming AC mains cables secure and free from damage?

  • Complete the Task

  • Make a note against the task on the work order and attach a photo

  • AC MAINS CHANGEOVER • Is the AC mains generator changeover switch secure and free from damage?

  • Complete the Task

  • Make a note against the task on the work order and attach a photo

  • GENERATOR PLUG / SOCKET • Is the generator plug (Alcatel/Nokia) or socket (Commscope) free from damage and serviceable?

  • Complete the Task

  • Make a note against the task on the work order and attach a photo

On Completion

  • CLOSE NODE CABINET • On completion of the work order tasks close and lock the cabinet door and take final picture.

  • PAUSE CRQ • Notify the FTTN NOC to advise them to pause the CRQ

  • RETURN KEY • Return any keys to the person who gave them to you.

Additional Comments

Sign off

  • INSPECTORS NAME AND SIGNATURE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.