Title Page
-
Conducted on
-
Prepared by
-
Location
-
Turbine Number
-
Start Time
-
Stop Time
Trip Circuit
-
8.23.1 CHECKING THE OPERATION OF THE SMOKE DETECTOR (every 2 years)
-
8.18.10 CHECKING THE SWITCHGEAR TRIP THROUGH LEAK TO NEUTRAL RELAY
-
8.18.11 CHECKING THE ELECTRIC ARC DETECTOR RELAY’S OPERATION
-
8.18.7 CHECKING THE OPERATION OF THE SWITCHGEAR TRIP BUTTON (A60) IN TOP
-
8.18.8 CHECKING THE OPERATION OF TRANSFORMER FUSES’ MICROSWITCH (Every 2 years)
-
CHECKING OPERATION OF TRANSFORMER ACCESS DOORS’ TRIP SWITCH
Transformer Inspections
-
8.13.13b VISUAL INSPECTION OF THE LTK AIR HEATERS’ FASTENING ELEMENTS (IF APPLICABLE)
-
8.13.6b VISUAL INSPECTION BOLTED JOINTS BETWEEN NACELLE ROOF PROFILES(Transf. Area)
-
8.15.2 VISUAL INSPECTION OF THE TRANSFORMER GROUND CABLE
-
8.18.1 VISUAL INSPECTION OF THE TRANSFORMER NEUTRAL CABLE (LOW VOLTAGE SIDE)
-
8.18.2 VISUAL INSPECTION OF THE TRANSFORMER’S FASTENERS
-
8.17.1b VISUAL INSPECTION OF THE FRAME
-
8.18.9 VISUAL INSPECTION OF THE TRANSFORMER’S AUTOMATIC VALVES
-
8.13.2b VISUAL INSPECTION OF THE NACELLE’S FIBER COVER
-
8.13.3b VISUAL INSPECTION OF THE NACELLE’S ACOUSTIC INSULATION (In Transformer Area)
-
8.13.8b VISUAL INSPECTION OF BOLTED JOINT BETWEEN HANDRAIL AND NACELLE ROOF
-
8.18.3 VISUAL INSPECTION OF THE TRANSFORMER’S CABLES, TERMINALS AND LV FUSES
-
8.18.4 VISUAL INSPECTION OF THE TRANSFORMER’S TERMINALS AND HV DELTA CONNECTION
-
8.18.15 TRANSFORMER CLEANING AND FINAL CHECKS
-
INSPECT W PHASE BRACKET FOR CRACKS
-
INSPECT BUS WORK FOR LOOSE CONNECTIONS
-
INSPECT ROUTING OF ALL CABLES
-
FUNCTION CHECK TRANSFORMER FANS
-
INSPECT TRANSFORMER PT100's
-
Completion Date and Time
-
Technician 1 Completion signature
-
Technician 2 Completion signature