Title Page

  • Conducted on

  • Prepared by

  • Location

12 Month Annual Maintenance

  • Date & Time Offline Day 1

  • Date & Time Offline Day 2

  • Date & Time Offline Day 3

Base

  • 8.2.1 Auditory inspections of blades aerodynamic noise

  • 8.2.2 Auditory inspections of blades mechanical noise

  • 8.2.3 Visual inspection of the blades

  • 8.14.2 Visual inspection of the safety signs in the tower and nacelle

  • 8.14.1 Checking the last inspection date of the lifeline

  • 8.14.8 Visual inspection of foundation pedestal

  • 8.14.9 Visual gaps between foundation section and pedestal

  • 8.14.11 Visual inspections of tower access door hinges

  • 8.14.15 Visual inspection of welding of tower access door frame

  • 8.26.5a Replacement of Fan filters in electrical ground cabinet

Elevator

  • 8.24.11 Visual inspection of elevators safety sign's

  • 8.24.13 Inspection of elevators emergency buttons

  • 8.24.1 Checking operation of elevators blockstop device

  • 8.24.2 Checking the lower end stop lever's operation

  • 8.24.3 Checking the upper end stop lever's operation

  • 8.24.14 Visual of anchoring points inside elevator cabin

  • 8.24.10 Visual inspection of bolted joints of elevator support beam

  • 8.24.9 Visual inspection of elevator support beam

  • 8.24.3 Load limiter operation check

  • 8.24.12 Check load limiter operation

  • 8.24.15 Elevator motor brake inspection

  • 8.24.4 Visual inspection of the drive cable glides

  • 8.24.5 Visual inspection of guide cables

  • 8.24.6 Visual inspection of hoisting cables

  • 8.24.7 Visual inspection of safety cable

  • 8.24.8 Visual inspection of beam joint shackles

Tower

  • 8.14.4 Visual Inspection of bolted joints between tower sections

  • 8.14.5 Visual inspection of flange ring welding of tower section joints

  • 8.15.1 Inspection of ground cable between tower sections

  • 8.12.19 Visual inspection of power cables lower loop

  • 8.19.2 Inspection of emergency lights in the tower

Chain Hoist

  • 8.21.16 Visual inspection of bridge crane frame

  • 8.21.17 Visual inspection of bridge crane trolly's welded structure

  • 8.21.9 Visual inspection of the hoist's emergency button

  • 8.21.10 Visual inspection of the hoist's safety hook and tab

  • 8.21.11 Visual inspection of the hoist's chain guide elements

  • 8.21.12 Visual inspection of hoist's safety anchor

  • 8.21.13 Checking for the presence of the hoist's brake safety seal

  • 8.21.8 Visual inspection of the hoist's chain end mechanical stop

  • 8.21.15 Visual inspection of hoist's chain bag and support

  • 8.21.1 Brake operation check

  • 8.21.2 Visual inspection and chain lubrication

Hub/nose cone/pitch system

  • 8.3.5 Visual inspection of bolted joint of pin support and blade bearing

  • 8.4.27 Visual inspection of the bolts of the pitch system's ball joint housing

  • 8.4.21 Visual inspection of the bolted joints of the pitch cylinder support parts to hub

  • 8.4.22 Visual inspection of bolted joints of pitch block protection supports

  • 8.3.7a Visual inspection of nut fastening blade bearing plate pin's end (every 4 years)

  • 8.2.6a Visual inspection of the blade root

  • 8.2.10 Inspection of the lighting protection system

  • 8.1.1 Visual inspection of the cone support structure

  • 8.1.2 Visual inspection of the cone's fiber panels

  • 8.1.3 Visual inspection of the machined hub

  • 8.1.4 Visual inspection of bolted joints between support structure and cone

  • 8.1.5 Visual inspection of bolted joints between support structure and hub

  • 8.2.4 Visual inspection of the blade dust seals.

  • 8.3.7b Visual inspection of nut fastening blade bearing plate pin's end (every 4 years)

  • 8.2.6b Visual inspection of the blade root

  • 8.3.4 Visual inspection of the bolted joint between blade bearing and hub

  • 8.3.1a Visual inspection of the blade bearings' outside retainers

  • 8.3.3 Visual inspection for leaks in the blade bearings' lubricators

  • 8.3.2 Lubrication of the blade bearings

  • 8.11.7 Visual inspection of nacelle and rotor hydraulic circuit hoses

  • 8.4.23 Check the operation of the emergency solenoid valves

  • 8.11.12 Visual inspection for leaks in the rotor

  • 8.4.25 Visual inspection of bolted joints of leak tank with support

  • 8.4.26 Visual inspection of bolted joints of leak tank support and hub

  • 8.2.5 Visual inspection of bolted joint between blade and blade bearing

  • 8.3.1b Visual inspection of the blade bearings' outside retainers

  • 8.26.35 Check the bolts of the supports of the hub electrical cabinets

Main Shaft

  • 8.5.3 Visual inspection for grease leaks in the main shaft's bearings

  • 8.5.2 Cleaning of the main shaft's grease collection trays

  • 8.5.7 Visual inspection of the main shaft's body

  • 8.5.1 Lubricating the main shaft's bearings

  • 8.5.6 Lubrication of the rotor's lock bolts

Gear Box

  • 8.6.3 Gearbox oil sample collection

  • 8.6.9 Checking and adjusting the gearbox pressure switch's setting

  • 8.7.1 Auditory inspection of the gearbox

  • 8.6.4 Inspection and replacement of the gearbox air filter

  • 8.6.6 Replacement of the gearbox on-line filter

  • 8.6.2 Checking for absence of metal particles in gearbox magnetic rod

Yaw System

  • 8.12.3 Indirect measurement of wear on the yaw system's radial PETPS

  • 8.12.8 Visual inspection of the yaw system's turn-counter

  • 8.12.2 Lubrication of the yaw system's ring gear

  • 8.12.29 Visual inspection of the yaw system's ring gear covers

  • 8.12.15 Inspection for leaks in the system's hydraulic circuit

  • 8.12.5 Visual inspection of yaw system's PETP wear dust

  • 8.12.1 Lubrication of the yaw system's slide elements

  • 8.12.4 Auditory inspection of the yaw system

  • 8.12.9 Visual inspection of bolted joints in the gear motors

  • 8.12.7 Inspection for oil leaks in gears

  • 8.12.7 Inspection of the oil level in gears

  • 8.12.13 Inspection of bolted joint between yaw system clamps (and spacer) & frame

  • 8.12.12 Visual inspection of bolted joint between yaw base and tower

  • 8.12.26 Adjustment of the mechanical stacks in passive wells

Generator

  • 8.10.1 Lubricating the Generators bearings

  • 8.10.6 Visual inspection of bolted joints between generator and frame

  • 8.10.4 Checking for wear of phase brushes (Please note if brushes were replaced)

  • 8.10.5 Checking for wear of ground brushes (Please note if brushes were replaced)

  • 8.10.2 Cleaning the slip ring body

  • 8.10.7 Visual inspection of the stator's terminal box

High Speed Shaft

  • VISUAL INSPECATION OF THE HIGH SPEED SHAFT COUPLING

  • VISUAL INSPECATION OF THE HIGH SPEED SHAFT COUPLING

  • VISUAL INSPECATION OF THE HIGH SPEED SHAFT COUPLING

  • VISUAL INSPECATION OF THE HIGH SPEED SHAFT COUPLING

  • VISUAL INSPECATION OF THE HIGH SPEED SHAFT COUPLING

  • INSPECTION FOR LEAKS & BLEEDING THE MECH. BRAKE SYSTEM’S HYDRAULIC CIRCUIT

  • INSPECTION FOR LEAKS & BLEEDING THE MECH. BRAKE SYSTEM’S HYDRAULIC CIRCUIT

  • INSPECTION FOR LEAKS & BLEEDING THE MECH. BRAKE SYSTEM’S HYDRAULIC CIRCUIT

  • INSPECTION FOR LEAKS & BLEEDING THE MECH. BRAKE SYSTEM’S HYDRAULIC CIRCUIT

  • INSPECTION FOR LEAKS & BLEEDING THE MECH. BRAKE SYSTEM’S HYDRAULIC CIRCUIT

  • INSPECTION OF THE BRAKE PADS

  • INSPECTION OF THE BRAKE PADS

  • INSPECTION OF THE BRAKE PADS

  • INSPECTION OF THE BRAKE PADS

  • INSPECTION OF THE BRAKE PADS

Sensor Checks

  • CHECK THE OPERATION OF TOP NON-EMERGENCY KR910 RELAY

  • CHECK THE OPERATION OF TOP NON-EMERGENCY KR910 RELAY

  • CHECK THE OPERATION OF TOP NON-EMERGENCY KR910 RELAY

  • CHECK THE OPERATION OF TOP NON-EMERGENCY KR910 RELAY

  • CHECK THE OPERATION OF TOP NON-EMERGENCY KR910 RELAY

  • 8.16.1a

INSPECTION OF THE WIND TURBINE’S EMERGENCY BUTTONS

INSPECTION OF THE WIND TURBINE’S EMERGENCY BUTTONS

INSPECTION OF THE WIND TURBINE’S EMERGENCY BUTTONS

INSPECTION OF THE WIND TURBINE’S EMERGENCY BUTTONS

INSPECTION OF THE WIND TURBINE’S EMERGENCY BUTTONS

  • INSPECTION OF THE BEACON SYSTEM’S UPS (IF APPLICABLE, Every 2 Years)

  • INSPECTION OF THE BEACON SYSTEM’S UPS (IF APPLICABLE, Every 2 Years)

  • INSPECTION OF THE BEACON SYSTEM’S UPS (IF APPLICABLE, Every 2 Years)

  • INSPECTION OF THE BEACON SYSTEM’S UPS (IF APPLICABLE, Every 2 Years)

  • INSPECTION OF THE BEACON SYSTEM’S UPS (IF APPLICABLE, Every 2 Years)

INSPECTION OF THE BEACON SYSTEM

INSPECTION OF THE BEACON SYSTEM

INSPECTION OF THE BEACON SYSTEM

INSPECTION OF THE BEACON SYSTEM

INSPECTION OF THE BEACON SYSTEM

  • 8.16.1b

INSPECTION OF THE WIND TURBINE’S EMERGENCY BUTTONS

INSPECTION OF THE WIND TURBINE’S EMERGENCY BUTTONS

INSPECTION OF THE WIND TURBINE’S EMERGENCY BUTTONS

INSPECTION OF THE WIND TURBINE’S EMERGENCY BUTTONS

INSPECTION OF THE WIND TURBINE’S EMERGENCY BUTTONS

  • CHECKING THE OGS RELAY’S OPERATION

  • CHECKING THE OGS RELAY’S OPERATION

  • CHECKING THE OGS RELAY’S OPERATION

  • CHECKING THE OGS RELAY’S OPERATION

  • CHECKING THE OGS RELAY’S OPERATION

  • CHECKING THE NRG SYSTEM (Every 2 years)

  • CHECKING THE NRG SYSTEM (Every 2 years)

  • CHECKING THE NRG SYSTEM (Every 2 years)

  • CHECKING THE NRG SYSTEM (Every 2 years)

  • CHECKING THE NRG SYSTEM (Every 2 years)

Top Cabinet

  • 8.26.5b

REPLACEMENT OF FAN AIR FILTERS IN ELECTRICAL CABINETS

  • REPLACEMENT OF FAN AIR FILTERS IN ELECTRICAL CABINETS (In Ground)

  • REPLACEMENT OF FAN AIR FILTERS IN ELECTRICAL CABINETS (In Ground)

  • REPLACEMENT OF FAN AIR FILTERS IN ELECTRICAL CABINETS (In Ground)

  • REPLACEMENT OF FAN AIR FILTERS IN ELECTRICAL CABINETS (In Ground)

  • REPLACEMENT OF THE CONVERTER’S AIR FILTERS (DTC ONLY)

  • REPLACEMENT OF THE CONVERTER’S AIR FILTERS (DTC ONLY)

  • REPLACEMENT OF THE CONVERTER’S AIR FILTERS (DTC ONLY)

  • REPLACEMENT OF THE CONVERTER’S AIR FILTERS (DTC ONLY)

  • REPLACEMENT OF THE CONVERTER’S AIR FILTERS (DTC ONLY)

  • SMP

VISUAL INSPECTION OF THE SMP ACCELERATORS

VISUAL INSPECTION OF THE SMP ACCELERATORS

VISUAL INSPECTION OF THE SMP ACCELERATORS

VISUAL INSPECTION OF THE SMP ACCELERATORS

VISUAL INSPECTION OF THE SMP ACCELERATORS

INSPECTION OF SMP GROUND CONNECTIONS

INSPECTION OF SMP GROUND CONNECTIONS

INSPECTION OF SMP GROUND CONNECTIONS

INSPECTION OF SMP GROUND CONNECTIONS

INSPECTION OF SMP GROUND CONNECTIONS

VISUAL INSPECTION OF SMP OPERATION

VISUAL INSPECTION OF SMP OPERATION

VISUAL INSPECTION OF SMP OPERATION

VISUAL INSPECTION OF SMP OPERATION

VISUAL INSPECTION OF SMP OPERATION

Nacelle/Bolt Checks

  • CHECKING LAST DATE OF INSPECTION OF THE NACELLE EMERGENCY DESCENT DEVICE

  • CHECKING LAST DATE OF INSPECTION OF THE NACELLE EMERGENCY DESCENT DEVICE

  • CHECKING LAST DATE OF INSPECTION OF THE NACELLE EMERGENCY DESCENT DEVICE

  • CHECKING LAST DATE OF INSPECTION OF THE NACELLE EMERGENCY DESCENT DEVICE

  • CHECKING LAST DATE OF INSPECTION OF THE NACELLE EMERGENCY DESCENT DEVICE

  • VISUAL INSPECTION OF THE BOLTED JOINT BETWEEN THE HUB AND THE MAIN SHAFT

  • VISUAL INSPECTION OF THE BOLTED JOINT BETWEEN THE HUB AND THE MAIN SHAFT

  • VISUAL INSPECTION OF THE BOLTED JOINT BETWEEN THE HUB AND THE MAIN SHAFT

  • VISUAL INSPECTION OF THE BOLTED JOINT BETWEEN THE HUB AND THE MAIN SHAFT

  • VISUAL INSPECTION OF THE BOLTED JOINT BETWEEN THE HUB AND THE MAIN SHAFT

  • VISUAL INSPECTION OF BOLTED JOINT OF MAIN BEARING HOUSINGS AND FRAME

  • VISUAL INSPECTION OF BOLTED JOINT OF MAIN BEARING HOUSINGS AND FRAME

  • VISUAL INSPECTION OF BOLTED JOINT OF MAIN BEARING HOUSINGS AND FRAME

  • VISUAL INSPECTION OF BOLTED JOINT OF MAIN BEARING HOUSINGS AND FRAME

  • VISUAL INSPECTION OF BOLTED JOINT OF MAIN BEARING HOUSINGS AND FRAME

  • 8.13.2a

VISUAL INSPECTION OF THE NACELLE’S FIBER COVER

VISUAL INSPECTION OF THE NACELLE’S FIBER COVER

VISUAL INSPECTION OF THE NACELLE’S FIBER COVER

VISUAL INSPECTION OF THE NACELLE’S FIBER COVER

VISUAL INSPECTION OF THE NACELLE’S FIBER COVER

VISUAL INSPECTION OF THE NACELLE’S ACOUSTIC INSULATION

VISUAL INSPECTION OF THE NACELLE’S ACOUSTIC INSULATION (In Transformer Area)

VISUAL INSPECTION OF THE NACELLE’S ACOUSTIC INSULATION (In Transformer Area)

VISUAL INSPECTION OF THE NACELLE’S ACOUSTIC INSULATION (In Transformer Area)

VISUAL INSPECTION OF THE NACELLE’S ACOUSTIC INSULATION (In Transformer Area)

  • 8.13.6a

  • VISUAL INSPECTION BOLTED JOINTS BETWEEN NACELLE ROOF PROFILES

  • VISUAL INSPECTION BOLTED JOINTS BETWEEN NACELLE ROOF PROFILES(Transf. Area)

  • VISUAL INSPECTION BOLTED JOINTS BETWEEN NACELLE ROOF PROFILES(Transf. Area)

  • VISUAL INSPECTION BOLTED JOINTS BETWEEN NACELLE ROOF PROFILES(Transf. Area)

  • VISUAL INSPECTION BOLTED JOINTS BETWEEN NACELLE ROOF PROFILES(Transf. Area)

VISUAL INSPECTION OF THE DESCENT DEVICE'S SAFETY EYEBOLT

VISUAL INSPECTION OF THE DESCENT DEVICE'S SAFETY EYEBOLT

VISUAL INSPECTION OF THE DESCENT DEVICE'S SAFETY EYEBOLT

VISUAL INSPECTION OF THE DESCENT DEVICE'S SAFETY EYEBOLT

VISUAL INSPECTION OF THE DESCENT DEVICE'S SAFETY EYEBOLT

  • VISUAL INSPECTION OF BOLTED JOINTS BETWEEN FRONT AND REAR FRAMES

  • VISUAL INSPECTION OF BOLTED JOINTS BETWEEN FRONT AND REAR FRAMES

  • VISUAL INSPECTION OF BOLTED JOINTS BETWEEN FRONT AND REAR FRAMES

  • VISUAL INSPECTION OF BOLTED JOINTS BETWEEN FRONT AND REAR FRAMES

  • VISUAL INSPECTION OF BOLTED JOINTS BETWEEN FRONT AND REAR FRAMES

  • 8.17.1a

VISUAL INSPECTION OF THE FRAME

VISUAL INSPECTION OF THE FRAME

VISUAL INSPECTION OF THE FRAME

VISUAL INSPECTION OF THE FRAME

VISUAL INSPECTION OF THE FRAME

  • Hydraulic

  • CHECKING THE YAW BRAKE’S PRESSURE IN RETENTION MODE

  • CHECKING THE YAW BRAKE’S PRESSURE IN RETENTION MODE

  • CHECKING THE YAW BRAKE’S PRESSURE IN RETENTION MODE

  • CHECKING THE YAW BRAKE’S PRESSURE IN RETENTION MODE

  • CHECKING THE YAW BRAKE’S PRESSURE IN RETENTION MODE

  • CHECKING AND ADJUSTING THE YAW BRAKE REDUCTION VALVE’S SETTING

  • CHECKING AND ADJUSTING THE YAW BRAKE REDUCTION VALVE’S SETTING

  • CHECKING AND ADJUSTING THE YAW BRAKE REDUCTION VALVE’S SETTING

  • CHECKING AND ADJUSTING THE YAW BRAKE REDUCTION VALVE’S SETTING

  • CHECKING AND ADJUSTING THE YAW BRAKE REDUCTION VALVE’S SETTING

  • 8.11.6a

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 74)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 74)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 74)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 74)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 74)

8.11.6b

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 79)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 79)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 79)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 79)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 79)

  • 8.11.6c

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87A)

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87A)

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87A)

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87A)

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87A)

  • 8.11.6d

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 93A)

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 93A)

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 93A)

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 93A)

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 93A)

  • 8.11.6e

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94A)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94A)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94A)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94A)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94A)

  • 8.11.6f

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87B)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87B)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87B)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87B)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87B)

  • 8.11.6g

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 93B)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 93B)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 93B)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 93B)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 93B)

  • 8.11.6h

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94B)

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94B)

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94B)

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94B)

CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94B)

  • 8.11.6i

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87C)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87C)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87C)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87C)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 87C)

  • 8.11.6j

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos.93C)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos.93C)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos.93C)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos.93C)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos.93C)

  • 8.11.6k

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94C)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94C)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94C)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94C)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 94C)

  • 8.11.6m

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 24)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 24)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 24)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 24)

  • CHECKING AND ADJUSTING PITCH ACCUM. PRECHARGE PRESSURE (Pos. 24)

CHECKING & ADJUSTING YAW BRAKE ACCUMULATOR’S PRECHARGE PRESS(Pos. 107)

CHECKING & ADJUSTING YAW BRAKE ACCUMULATOR’S PRECHARGE PRESS(Pos. 107)

CHECKING & ADJUSTING YAW BRAKE ACCUMULATOR’S PRECHARGE PRESS(Pos. 107)

CHECKING & ADJUSTING YAW BRAKE ACCUMULATOR’S PRECHARGE PRESS(Pos. 107)

CHECKING & ADJUSTING YAW BRAKE ACCUMULATOR’S PRECHARGE PRESS(Pos. 107)

  • CHECKING & ADJUSTING MECH. BRAKE ACCUMULATOR’S PRECHARGE PRESS (Pos. 30)

  • CHECKING & ADJUSTING MECH. BRAKE ACCUMULATOR’S PRECHARGE PRESS (Pos. 30)

  • CHECKING & ADJUSTING MECH. BRAKE ACCUMULATOR’S PRECHARGE PRESS (Pos. 30)

  • CHECKING & ADJUSTING MECH. BRAKE ACCUMULATOR’S PRECHARGE PRESS (Pos. 30)

  • CHECKING & ADJUSTING MECH. BRAKE ACCUMULATOR’S PRECHARGE PRESS (Pos. 30)

  • 8.11.15a

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • 8.11.15b

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • 8.11.15c

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • INSPECTING & ADJUSTING PRESSURE SWITCH SETTINGS OF THE PITCH BLOCKS (Pos. 91)

  • HUB PRESSURE FILTER REPLACEMENT

  • HUB PRESSURE FILTER REPLACEMENT

  • HUB PRESSURE FILTER REPLACEMENT

  • HUB PRESSURE FILTER REPLACEMENT

  • HUB PRESSURE FILTER REPLACEMENT

  • DRAIN THE HUB’S LEAK TANK

  • DRAIN THE HUB’S LEAK TANK

  • DRAIN THE HUB’S LEAK TANK

  • DRAIN THE HUB’S LEAK TANK

  • DRAIN THE HUB’S LEAK TANK

  • REPLACEMENT OF THE HYDRAULIC UNIT’S PRESSURE FILTER

  • REPLACEMENT OF THE HYDRAULIC UNIT’S PRESSURE FILTER

  • REPLACEMENT OF THE HYDRAULIC UNIT’S PRESSURE FILTER

  • REPLACEMENT OF THE HYDRAULIC UNIT’S PRESSURE FILTER

  • REPLACEMENT OF THE HYDRAULIC UNIT’S PRESSURE FILTER

  • INSPECTION OF THE OIL LEVEL IN THE HYDRAULIC UNIT

  • INSPECTION OF THE OIL LEVEL IN THE HYDRAULIC UNIT

  • INSPECTION OF THE OIL LEVEL IN THE HYDRAULIC UNIT

  • INSPECTION OF THE OIL LEVEL IN THE HYDRAULIC UNIT

  • INSPECTION OF THE OIL LEVEL IN THE HYDRAULIC UNIT

  • INSPECTION FOR LEAKS IN THE HYDRAULIC UNIT

  • INSPECTION FOR LEAKS IN THE HYDRAULIC UNIT

  • INSPECTION FOR LEAKS IN THE HYDRAULIC UNIT

  • INSPECTION FOR LEAKS IN THE HYDRAULIC UNIT

  • INSPECTION FOR LEAKS IN THE HYDRAULIC UNIT

VISUAL INSPECTION AND CLEANING OF HYDRAULIC UNIT EXCHANGER (IF APPLICABLE)

VISUAL INSPECTION AND CLEANING OF HYDRAULIC UNIT EXCHANGER (IF APPLICABLE)

VISUAL INSPECTION AND CLEANING OF HYDRAULIC UNIT EXCHANGER (IF APPLICABLE)

VISUAL INSPECTION AND CLEANING OF HYDRAULIC UNIT EXCHANGER (IF APPLICABLE)

VISUAL INSPECTION AND CLEANING OF HYDRAULIC UNIT EXCHANGER (IF APPLICABLE)

  • INSPECTION AND REPLACEMENT OF THE HYDRAULIC UNIT’S AIR FILTER

  • INSPECTION AND REPLACEMENT OF THE HYDRAULIC UNIT’S AIR FILTER

  • INSPECTION AND REPLACEMENT OF THE HYDRAULIC UNIT’S AIR FILTER

  • INSPECTION AND REPLACEMENT OF THE HYDRAULIC UNIT’S AIR FILTER

  • INSPECTION AND REPLACEMENT OF THE HYDRAULIC UNIT’S AIR FILTER

  • INSPECTION AND ADJUSTMENT OF THE HYDRAULIC UNIT’S SAFETY VALVE (POS. 25)

  • INSPECTION AND ADJUSTMENT OF THE HYDRAULIC UNIT’S SAFETY VALVE (POS. 25)

  • INSPECTION AND ADJUSTMENT OF THE HYDRAULIC UNIT’S SAFETY VALVE (POS. 25)

  • INSPECTION AND ADJUSTMENT OF THE HYDRAULIC UNIT’S SAFETY VALVE (POS. 25)

  • INSPECTION AND ADJUSTMENT OF THE HYDRAULIC UNIT’S SAFETY VALVE (POS. 25)

  • CHECKING & ADJUSTING THE MECHANICAL BRAKE’S PRESSURE SWITCH SETTING (Pos. 31)

  • CHECKING & ADJUSTING THE MECHANICAL BRAKE’S PRESSURE SWITCH SETTING (Pos. 31)

  • CHECKING & ADJUSTING THE MECHANICAL BRAKE’S PRESSURE SWITCH SETTING (Pos. 31)

  • CHECKING & ADJUSTING THE MECHANICAL BRAKE’S PRESSURE SWITCH SETTING (Pos. 31)

  • CHECKING & ADJUSTING THE MECHANICAL BRAKE’S PRESSURE SWITCH SETTING (Pos. 31)

  • CHECKING AND ADJUSTING THE MECHANICAL BRAKE’S SAFETY VALVE (Pos. 33) SETTING

  • CHECKING AND ADJUSTING THE MECHANICAL BRAKE’S SAFETY VALVE (Pos. 33) SETTING

  • CHECKING AND ADJUSTING THE MECHANICAL BRAKE’S SAFETY VALVE (Pos. 33) SETTING

  • CHECKING AND ADJUSTING THE MECHANICAL BRAKE’S SAFETY VALVE (Pos. 33) SETTING

  • CHECKING AND ADJUSTING THE MECHANICAL BRAKE’S SAFETY VALVE (Pos. 33) SETTING

  • INSPECTION FOR HYDRAULIC OIL LEAKS IN THE ROTARY JOINT

  • INSPECTION FOR HYDRAULIC OIL LEAKS IN THE ROTARY JOINT

  • INSPECTION FOR HYDRAULIC OIL LEAKS IN THE ROTARY JOINT

  • INSPECTION FOR HYDRAULIC OIL LEAKS IN THE ROTARY JOINT

  • INSPECTION FOR HYDRAULIC OIL LEAKS IN THE ROTARY JOINT

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.