Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Solar Panels

  • All brackets installed and secured?

  • All panels installed and secured?

  • Earth cable installed?

  • All panels/brackets bonded to each other?

  • All PV cables in trunking/conduits?

  • Any shading on the panels?

Solar Panels Tests

  • How many panels installed:

  • How many strings installed:

  • How many panels per string:

  • Make of panels and wattage:

Panel voltage - Open circuit voltages

  • List all strings open voltages:

Panel voltages - Under load voltages

  • List all strings under load voltages:

Batteries

  • Make, model number and size:

  • Qty:

  • Charge voltage:

  • Float voltage:

  • Serial numbers:

Inverter

  • Make, model number and size:

  • Qty:

  • Serial numbers:

  • Inverter Grid voltage: (V)

  • Inverter Load Voltage: (V)

  • N/E bond installed?

  • Earth/Neutral voltage on load - Grid off:

  • Photos of settings:

Installations Photos

  • Inverters

  • Batteries

  • Solar panels

  • AC combiner box

  • DC combiner box

  • Battery fuses

  • Distribution boards

Documents

  • Single line drawing

  • Wiring diagrams

  • Roof layout

  • Standard Operating Procedures

  • Sunsynk Monitoring Platform

  • COC

Approvals

  • Name:

  • Date:

  • Signature:

  • Installation approved:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.