Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Client information
-
Initial COC #
-
COC number:
-
Physical address:
-
Name of building:
-
Suburb / Township:
-
District / Town / City:
Type of installation?
-
a) electrical installation regulations 9(2) (a) (new electrical installation); or
-
b) electrical installation regulations 9(2) (b) (existing electrical installation); or
-
c) electrical installation regulations 9(2) (c) (new part to existing installation)
TEST REPORT (To SANS 10142-1)
SECTION 1 - LOCATION
-
Physical address:
-
Name of building:
SECTION2 - INSTALLATION
-
Type of electricity supply system:
Characteristics of supply:
-
Voltage:
-
Voltage?
-
Number of phases:
-
Phase rotation:
-
Frequency:
-
Frequency?
Main switch type:
-
Type?
- Switch disconnector (on-load isolator)
- Fuse switch
- Circuit-breaker
- Earth leakage circuit-breaker
- Earth leakage switch disconnector
-
Number of poles?
-
Current rating (A)?
-
Short-circuit/withstand rating (kA)?
-
Rated earth leakage tripping current?
-
mA?
-
Is surge protection installed? (see 6.7.6 and annex I)
-
Is lightning protection installed? (see 6.7.7 and annex I)
-
Is alternative power supply installed? (See 7.12.)
-
Is any part of the installation a specialized electrical installation?
-
Is any part of the installation at a voltage above 1 kV?
SECTION 3 - DESCRIPTION OF INSTALLATION COVERED BY THIS REPORT
-
Describe installation
SECTION 4 - INSPECTION AND TESTS
-
Conductors are of the correct rating and current-carrying capacity for the protective devices and connected load
-
Components have been correctly selected and installed
-
Disconnecting devise are correctly located and all Switchgear switches the phase conductors
-
Circuits, fuses, switches, terminals, earth leakage units, circuit-breakers, distribution boards are correctly and permanently marked or labeled
Test Results
-
Continuity of bonding - Compliant?
-
Resistance of earth continuity conductor at all points of consumption - Compliant?
-
Earth loop impedance test at Main or Local Switch (Ohm)
-
Neutral loop impedance test at Main or Local Switch (Ohm)
-
Prospective Short Circuit Current at Main or Local switch (PSCC) (kA)
-
Elevated voltage between incoming neutral and external earth (ground) (V)
-
Insulation resistance (M ohm)
-
Voltage at distribution board with NO load for each phase to neutral (V)
-
Red phase (V)
-
White phase (V)
-
Blue phase (V)
-
Voltage at distribution board with load for each phase to neutral (V)
-
Red phase (V)
-
White phase (V)
-
Blue phase (V)
-
Value of operation of earth leakage units
-
mA?
-
Operation of earth leakage test button
-
Polarity of point of consumption
-
Phase rotation is consistent at points of all consumption for three phase systems
-
All switching devices make and break circuits
-
Comments:
-
Comments on part of the installation NOT covered by this report:
ADDITIONAL TEST REPORT for SSEG
SECTION 2 – INSTALLATION
-
Name of inverter?
-
S/N of inverter?
Type of SSEG installed:
-
Total Size of SSEG: (kVA)
-
Number of Phases:
-
Voltage of Grid supply:
-
Output Voltage Of SSEG:
-
DC Voltage Rating:
-
Voltage:
-
Number of phases:
-
Phase rotation
-
Frequency:
-
Hz:
-
Point of Control for alternative supply:
- Switch disconnector (on-load isolator)
- Fuse switch
- Circuit-breaker
- Earth leakage circuit-breaker
- Earth leakage switch disconnector
-
Number of poles:
-
Current rating: (A)
-
Short-circuit/withstand rating: (kA)
-
Lightning Risk assessment completed?
-
Anti Islanding operation and set correctly?
-
Earth continuity conductors connected to main earth?
-
Electrical installation CoC and Test report attached?
-
Single Line Diagram (schematic drawing) attached?
-
Accessible disconnector/ DGSL installed for supplier?
SECTION 3 - DESCRIPTION OF INSTALLATION COVERED BY THIS REPORT
Number of circuits or points (Number of)
-
Number of panels/modules?
-
Number of panels/modules in series?
-
Number of parallel strings?
-
Storage units installed?
-
Storage units in parallel?
-
Storage units in series?
-
DC Combiner box?
Safety Devices (Number of and rating)
-
AC Disconnectors
-
RCD Protection
-
DGSL/ Disconnect device
-
DC Overcurrent devices
-
DC Disconnectors
-
Other
Documents (reference/ attachment numbers):
-
Single Line diagram number
-
Additional documentation
SECTION 4 - INSPECTION AND TESTS (new and existing installations)
-
Equipment has been correctly sized and installed in accordance with manufacturer’s instructions.
-
Supplier bylaws and requirements adhered to
-
Disconnecting devices for equipment and safety purposes installed in accordance with the requirements
-
Labelling as per the requirements laid out in the standards
Test Results
-
Continuity of bonding (PV panels, conductive frames ETC.)
-
Resistance of earth continuity conductor at all points of consumption.
-
Open Circuit Voltage of Storage System (V)
-
Charging voltage of storage system (V)
-
Neutral loop impedance test: at main or local switch to SSEG (Ohm)
-
Prospective short-circuit current at main or local switch (PSCC) to SSEG (kA)
-
Elevated voltage between incoming neutral and external earth (ground) (V)
-
Insulation resistance of AC conductors (M Ohm)
-
Insulation resistance of DC conductors
-
Voltage at distribution board (alternative supply) with NO load for each phase to neutral
-
Red Phase (V)
-
White Phase (V)
-
Blue Phase (V)
-
Voltage at distribution board (alternative supply) with load (as calculated for full load) for each phase to neutral
-
Red Phase (V)
-
White Phase (V)
-
Blue Phase (V)
-
Open Circuit voltage of PV strings (V)
-
On-Load voltage of PV Strings (V)
-
Prospective short-circuit current (PSCC) of Battery banks (kA)
-
Polarity of DC Cables
-
All switching devices, make-and-break circuits
-
Grid connect/disconnect requirements are complied with. Does point of source isolation operate as required as per 5.3.4
Comments:
-
Comments on parts of the installation covered by this report
-
Comments on parts of the installation NOT covered by this report