Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Client information

  • Initial COC #

  • COC number:

  • Physical address:
  • Name of building:

  • Suburb / Township:

  • District / Town / City:

Type of installation?

  • a) electrical installation regulations 9(2) (a) (new electrical installation); or

  • b) electrical installation regulations 9(2) (b) (existing electrical installation); or

  • c) electrical installation regulations 9(2) (c) (new part to existing installation)

TEST REPORT (To SANS 10142-1)

SECTION 1 - LOCATION

  • Physical address:
  • Name of building:

SECTION2 - INSTALLATION

  • Type of electricity supply system:

Characteristics of supply:

  • Voltage:

  • Voltage?

  • Number of phases:

  • Phase rotation:

  • Frequency:

  • Frequency?

Main switch type:

  • Type?

  • Number of poles?

  • Current rating (A)?

  • Short-circuit/withstand rating (kA)?

  • Rated earth leakage tripping current?

  • mA?

  • Is surge protection installed? (see 6.7.6 and annex I)

  • Is lightning protection installed? (see 6.7.7 and annex I)

  • Is alternative power supply installed? (See 7.12.)

  • Is any part of the installation a specialized electrical installation?

  • Is any part of the installation at a voltage above 1 kV?

SECTION 3 - DESCRIPTION OF INSTALLATION COVERED BY THIS REPORT

  • Describe installation

SECTION 4 - INSPECTION AND TESTS

  • Conductors are of the correct rating and current-carrying capacity for the protective devices and connected load

  • Components have been correctly selected and installed

  • Disconnecting devise are correctly located and all Switchgear switches the phase conductors

  • Circuits, fuses, switches, terminals, earth leakage units, circuit-breakers, distribution boards are correctly and permanently marked or labeled

Test Results

  • Continuity of bonding - Compliant?

  • Resistance of earth continuity conductor at all points of consumption - Compliant?

  • Earth loop impedance test at Main or Local Switch (Ohm)

  • Neutral loop impedance test at Main or Local Switch (Ohm)

  • Prospective Short Circuit Current at Main or Local switch (PSCC) (kA)

  • Elevated voltage between incoming neutral and external earth (ground) (V)

  • Insulation resistance (M ohm)

  • Voltage at distribution board with NO load for each phase to neutral (V)

  • Red phase (V)

  • White phase (V)

  • Blue phase (V)

  • Voltage at distribution board with load for each phase to neutral (V)

  • Red phase (V)

  • White phase (V)

  • Blue phase (V)

  • Value of operation of earth leakage units

  • mA?

  • Operation of earth leakage test button

  • Polarity of point of consumption

  • Phase rotation is consistent at points of all consumption for three phase systems

  • All switching devices make and break circuits

  • Comments:

  • Comments on part of the installation NOT covered by this report:

ADDITIONAL TEST REPORT for SSEG

SECTION 2 – INSTALLATION

  • Name of inverter?

  • S/N of inverter?

Type of SSEG installed:

  • Total Size of SSEG: (kVA)

  • Number of Phases:

  • Voltage of Grid supply:

  • Output Voltage Of SSEG:

  • DC Voltage Rating:

  • Voltage:

  • Number of phases:

  • Phase rotation

  • Frequency:

  • Hz:

  • Point of Control for alternative supply:

  • Number of poles:

  • Current rating: (A)

  • Short-circuit/withstand rating: (kA)

  • Lightning Risk assessment completed?

  • Anti Islanding operation and set correctly?

  • Earth continuity conductors connected to main earth?

  • Electrical installation CoC and Test report attached?

  • Single Line Diagram (schematic drawing) attached?

  • Accessible disconnector/ DGSL installed for supplier?

SECTION 3 - DESCRIPTION OF INSTALLATION COVERED BY THIS REPORT

Number of circuits or points (Number of)

  • Number of panels/modules?

  • Number of panels/modules in series?

  • Number of parallel strings?

  • Storage units installed?

  • Storage units in parallel?

  • Storage units in series?

  • DC Combiner box?

Safety Devices (Number of and rating)

  • AC Disconnectors

  • RCD Protection

  • DGSL/ Disconnect device

  • DC Overcurrent devices

  • DC Disconnectors

  • Other

Documents (reference/ attachment numbers):

  • Single Line diagram number

  • Additional documentation

SECTION 4 - INSPECTION AND TESTS (new and existing installations)

  • Equipment has been correctly sized and installed in accordance with manufacturer’s instructions.

  • Supplier bylaws and requirements adhered to

  • Disconnecting devices for equipment and safety purposes installed in accordance with the requirements

  • Labelling as per the requirements laid out in the standards

Test Results

  • Continuity of bonding (PV panels, conductive frames ETC.)

  • Resistance of earth continuity conductor at all points of consumption.

  • Open Circuit Voltage of Storage System (V)

  • Charging voltage of storage system (V)

  • Neutral loop impedance test: at main or local switch to SSEG (Ohm)

  • Prospective short-circuit current at main or local switch (PSCC) to SSEG (kA)

  • Elevated voltage between incoming neutral and external earth (ground) (V)

  • Insulation resistance of AC conductors (M Ohm)

  • Insulation resistance of DC conductors

  • Voltage at distribution board (alternative supply) with NO load for each phase to neutral

  • Red Phase (V)

  • White Phase (V)

  • Blue Phase (V)

  • Voltage at distribution board (alternative supply) with load (as calculated for full load) for each phase to neutral

  • Red Phase (V)

  • White Phase (V)

  • Blue Phase (V)

  • Open Circuit voltage of PV strings (V)

  • On-Load voltage of PV Strings (V)

  • Prospective short-circuit current (PSCC) of Battery banks (kA)

  • Polarity of DC Cables

  • All switching devices, make-and-break circuits

  • Grid connect/disconnect requirements are complied with. Does point of source isolation operate as required as per 5.3.4

Comments:

  • Comments on parts of the installation covered by this report

  • Comments on parts of the installation NOT covered by this report

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.