Title Page
-
Site Address
-
Conducted on
-
Engineer
-
Location
Installation Details
-
Boiler position
-
Flue type
-
Number of radiators installed
-
Bypass radiator position
-
Gas meter position
-
Equipotential bonding present at meter
-
Condensate termination position
-
Type of Heating controls installed
-
PRV Termination position
-
Magnetic filter position
-
What type of scale reducer was used on cold water pipework
Commisioning
-
What system cleaner was used
-
What Inhibitor was used
-
Gas rate Central heating (M3/hr)
-
Operating pressure Central heating (Mbar)
-
Heating flow temp ('C)
-
Heating return temp ('C)
-
Gas rate Hot water (M3/hr)
-
Operating pressure Hot water (Mbar)
-
Cold water inlet temperature ('C)
-
Hot water Temperature at all outlets ('C)
-
Hot water flow rate (L/min)
-
Analyser readings - High (Ratio)
-
Analyser readings - Low (Ratio)
Photographic evidence
-
Mid Installation Pictures (Minimum of 5)
-
Boiler completed
-
Pipework under boiler
-
Filter and scale reducer
-
Flue (Internal)
-
Flue (External)
-
Analyser in port
-
Gas guage on boiler
-
Thermostat
-
Fuse spur
-
Condensate termination
-
Boiler data plate
-
Benchmark Complete
-
Gas Safety record Complete
-
Bypass Radiator 1
-
Radiator 2
-
Radiator 3
-
Radiator 4
-
Radiator 5
-
Radiator 6
-
Radiator 6
-
Radiator 7
-
Radiator 8
-
Radiator 9
-
Radiator 10
-
Radiator 11
-
Radiator 12
Customer satisfaction
-
All components and controls explained to customer
-
All waste materials removed from site
-
Is Customer satisfied with the installation
-
Customer Signiture
-
Engineer Signiture