Information
-
Document No.
-
Audit Title
-
Personnel
-
Client / Site
-
Prepared by
-
Location
-
Conducted on
Work Preparation & Customer Care
-
Customer Liaison
-
Gas Safe card / I'd card available
-
Visual / written risk assessment completed
-
Customer care / work area preparation
-
Hot work permit obtained / fire extinguisher.
-
Reference material / Technical bulletins.
Installation gas pipework & valves
-
Initial tightness test completed correctly
-
ECV correctly positioned labelled and operable
-
Gas line diagram installed and up to date Gas pipework correctly identified
-
Gas pipework material of correct type size support & route correct
-
Gas pipework sleeved & sleeves sealed
-
AECV / s correctly positioned labeled & operable
-
Gas isolation valve type fit for purpose and in correct position
-
Point of entry Main equipotential bonding installed
-
Ducts and voids ventilated correctly
-
Final tightness test completed correctly
-
All disturbed joints tested
-
Purging completed correctly
Appliances / Ancillary Plant / Systems
-
Workmanship / visual appearance suitable
-
Installed to manufacturers instructions
-
Ancillary plant installed correctly
-
Ductwork & canopies installed correctly
-
Systems configured correctly
-
Pressure relief pipework / termination correct
-
Condensate pipework / termination correct
Electrical Tests
-
Fuse rating checked and appropriate
-
Electrical isolation check completed correctly
-
Electrical tests identified & completed correctly
Appliance Safety Checks
-
Appliance / associated controls operating correctly
-
Appliance internal components / ignition examined / cleaned
-
Flue size construction route termination and support visually examined and correct
-
Ventilation size and route checked and correct
-
Flue flow continuity check completed correctly
-
Spillage / case seals inspected
-
Operating pressure and / or gas rate checked
-
Safety devices operation checked
Commissioning
-
Combustion analysis completed
-
Commissioned to manufacturers instructions
Safe Working Practices
-
Safe working practices employed
-
Electrical equipment safety and calibration
Underpinning Knowledge
-
Question 1
-
Question 2
Completion
-
Customer instructed in use and instructions left / controls reset
-
Documentation completed correctly
Signatures
-
Auditor
-
Operative