Details
-
Document No.
-
Audit Title
-
Personnel
-
Client / Site
-
Work Type (Install, Service, Breakdown)
-
Audit Type (Post Complete, Work in Progress)
-
Prepared by
-
Location
-
Conducted on
Quality Control Inspection
Gas Installation
-
Meter Installation correct
-
Point of entry Main Equipotential Bonding installed
-
Pipework installed to appropriate standards ( Size, Support, Sleeving, Protection)
-
Tightness Test carried out / Installation sound
Appliance Inspection
-
Add Appliances
Appliance
-
Make
-
Model
-
Location
-
Flue Type (Room Sealed, Open Flues, Flue-less)
-
Appliance installed to appropriate standards and manufacturers instructions
-
Electrical tests carried out
-
Electricity supply correctly isolated before work carried out
-
Fuse rating correct
-
Correct operation of controls / Safety devices
-
Burner Pressure / Gas Rate
-
Combustion Analysis
-
Flame Picture
-
Flue installed to appropriate standards ( Including Flues in voids)
-
Flue Flow test
-
Spillage Test
-
Ventilation adequate and installed to appropriate standards
-
Heat exchanger, Burner, Injectors cleaned
Completion
-
Customer instructed in use of Equipment / System, Manufacturers Instructions left on site
-
Controls reset to customers requirements
-
Paperwork completed correctly
Safety
-
Safe working practices employed
-
Personnel Protective Equipment ( Available / good condition / worn )
-
Equipment ( Electrical, Ladders, Combustion analysis, Tools ) Calibrated and in good order
Additional Information
-
Underpinning Knowledge
Question
-
Question
-
Response
Defects
-
Defects found
Defect
-
Defect
-
Corrective Action
Signatures
-
Auditor
-
Operative