Title Page
-
Site addess
-
Installation engineer
-
Installation date
-
Type of installation
-
Post inspection date
-
Inspection carried out by
Gas installation
-
Gas carcass supported and protected
-
Correct size Pipework to appliance
-
Meter installation correct
-
Equipotential Earth bonding correct at meter
-
Add media
Appliance installation
-
Appliance location correct
-
Add media
-
Flue installation correct
-
Add media
-
Ventilation correct
-
Has condense pipe been installed correctly and lagged
-
Add media
-
Has PRV been installed correctly
-
System set at correct pressure
-
Has a system filter been installed
-
Add media
-
Has a bypass been fitted
Electrical
-
Electrical isolation has correct fuse rating
-
H/R flex used to boiler and ancillaries with sufficient length
-
Add media
-
Correctly supported and protected cabling
-
Controls installed in appropriate position
Radiators and valves
-
If fitted have radiators been installed correctly
-
All radiators heating up correctly
-
Thermostatic valves fitted correctly
-
Add media
-
Lock shield valves fitted correctly
-
System balanced correctly
-
Filling loop installed correctly
-
Add media
-
Pipework is neat and tidy
General
-
System free from water leaks
-
Redundant services capped safely
-
Redundant equipment disconnected and safe
-
All building work completed
-
Add media
-
Floorboards and carpets replaced correctly
-
Installation compliant with building regs part L
-
All documents completed and left on site
-
Residents fully understand how new heating system works
Customer response
-
Was everything explained prior to work starting
-
Work started on agreed dates
-
Protection of fixtures and fittings undertaken
-
All rubbish removed rom site
-
Where you satisfied with the overall conduct of installers and staff
-
Customer signature