Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1) Applicable modules
-
System Design Module?
Enter Design Certificate number below.
-
Date of Certificate?
-
Installation Module?
Enter Installation Certificate number below.
-
Date of Certificate?
-
Commissioning and Handover (Inc Verification)?
Enter Commissioning Certificate number below.
-
Date of Certificate?
System Design
Specific Standards applied
-
BS5839 Category of system specified
Additional Standards Specified (eg HTM05-03)
General System Design Questions
-
Is the system addressable or non-addressable?
-
Is the category of system appropriate and as specified in the contract?<br>[Annex A]
-
Is the specified standby power supply period suitable for the category of system and the level of supervision? <br>[25.4(e)]
-
Does the system design proposal include all the required information? <br>[8.2]
-
Has the system design taken into account any building regs (eg Part M) or Equality Act requirements? <br>[18]
-
Is any cause/effect on the system documented? (inc single stage/phased evac etc) <br>[40.2(a1)]
-
Are design battery capacity calculations available? <br>[25.4(e) Annex D]
-
Have the correct quiescent and alarm currents been used? <br>[25.4(e) Annex D]
Category M/L- Quiescent at least 24 hours, or 6 hours with auto start generator
Category P- Quiescent at least period of unoccupation + 24 hours up to 72 hours, or at least 24 hours if supervised (every 6 hours) or fault monitoring by ARC
-
Assumptions/variations drawn to customer's attention at design/quotation stage?<br>[7.2(a)]
-
Is the battery capacity, as designed, adequate?<br>[25.4(e) Annex D]
System Design Comments-
Documentation
General Documentation Questions-
-
Are there satisfactory commissioning records?<br>[39.2(c)]
-
Have BS 5839 Certificates for design, installation, commissioning & acceptance been issued? (as applicable)<br>[39.2(c)]
-
Is there a record of agreed variations?<br>[40.2(e)]
-
Have suitable user instructions/manuals been provided to the customer?<br>[40.2(b)]
-
Are there satisfactory "as fitted" drawings?<br>[40.2(c)]
-
Have "as fitted" drawings been provided to the customer?<br>[40.2(c)]
-
Has a logbook been provided to the customer?<br>[40.2(d)]
-
Are insulation test results available and satisfactory? (ELV wiring only)<br>[38.2(a)]
-
Are test results for circuit parameters such as loop continuity available and satisfactory?<br>[38.2(d)]
-
Have 230V supply test records been supplied by the electrical contractor/client?
Documentation Comments-
Installation
General Installation Questions-
-
Are cables of a suitable type?<br>[26.2(b)(d)]
-
Are cables with "enhanced" fire resistance used where required?<br>[26.2(c)(e)]
-
Are cables adequately protected against mechanical damage?<br>[26.2(h)(k)]
-
Are methods of cable support satisfactory?<br>[26.2(f)]
-
Is there suitable segregation from other services and other fire alarm cables, where required?<br>[26.2(l)(m)(n)]
-
Are joints in cables terminated correctly? (applies only to joints external to FA&A system components)<br>[26.2(g)]
-
Are all junction boxes suitably labelled?<br>[26.2(g)]
-
Are all fire alarm cables a single common colour?<br>[26.2(o)]
-
Red Pirelli FP200 is not UV rated. Red Eland cable is UV rated.