Information

  • Document No.

  • Audit Title (location of sign off)

  • Client / Site

  • Conducted on

  • Prepared by

Checks

  • The installation is in accordance with the specification and drawings?

  • The installation is correctly aligned?

  • The installation is securely fixed and supported at correct intervals?

  • The connecting joints are securely fixed and all screws fitted (so as not to damage cables)?

  • The electrical continuity links are fitted?

  • All tray cuts are painted?

  • The bends and sets are satisfactorily installed?

  • The tray installation has been satisfactorily cleaned?

  • The equipotenential bonding links of the correct size are fitted and connected with the necessary labels?

  • The loop impedance tests have been carried out to confirm the earth bonding (ensure there are no disjointed sections)?

General Comments

GBE Representative

  • Select date

  • Add signature

SES Reprsentative

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.