Information
-
Document No.
-
Audit Title (location of sign off)
-
Client / Site
-
Block
-
Level
-
Area
-
Conducted on
-
Prepared by
Checks
-
Does the cabling meet the clients specifications and the relevant standards?
-
Correct sizes used for equipment being supplied?
-
Adequate mechanical protection, cables installed in trunking/conduit/copex/basket?
-
Are cables contained within the confines of the containment bends?
-
Are cables installed into the correct basket/tray e.g. FA, ELV, LV?
-
Have metal tie wraps been used and spaced correctly?
-
Are loops neatly coiled and out of the way of public, operatives and machinery?
-
Are stripped ends protected as not to cause risk of injury?
-
Has the fire compartment been rplaced where removed?
-
Are cables free from visible damage?
-
Have test results been recorded for the FA loops?
Photo's & Comments
-
Add media
GBE Representative
-
Select date
-
Add signature