Information
-
Site
-
Inspection Area
-
Conducted on
-
Inspection Team
Landfill
Environmental Management
-
Have all actions from the previous work area inspection been closed?
-
Have area inspections been completed by area owner?
-
Does the work area adequately manage clean stormwater within the work area?
-
Does the work area adequately manage potentially contaminated stormwater from leaving the work area?
-
Des the work area have sufficent, stocked spill kits?
-
Does the work area segregate and store waste correctly for final disposal?
DER licence
-
Compliance
-
Is the landfill located more than 100m from a creek and is the groundwater lower than 3m below the surface?
-
Is the tipping area less than 30m in length and no more than 2m above ground?
-
Has waste been placed in the trenches?
-
Are there any prohibited wastes in the putrescible landfill trench? eg steel, rubber, batteries, wood, oily rags, filters.
-
Are there any prohibited wastes in the inert or fibrous trench/waste dump landfill? eg putrescible waste, steel, rubber, batteries, oily rags, filters.
-
Has the waste been covered within the last week?
-
Has the waste in the tipping area been covered with at least 200mm of inert material?
-
Has all waste been covered so that there is no visible waste exposed?
-
Is the area free from windblown rubbish inside (inside and outside the facility)?
Housekeeping
-
If no one was present at the landfill before you arrived, were the entry gates secured?
-
Are the information signs visible and easy to read?
-
Is the perimeter fencing and gates in good condition?
-
Is the landfill register filled out correctly?
-
Is housekeeping in the area adequate?
-
Are visible dust level satisfactory
Facility Compliance
-
Is the facility operating as designed with no actions required?
-
Required Actions
-
Actions required
Action
Landfarm
Environmental Management
-
Have all actions from the previous work area inspection been closed?
-
Have regular area inspections been completed by area owner?
-
Does the work area adequately manage clean stormwater within the work area?
-
Does the work area adequately manage potentially contaminated stormwater from leaving the work area?
-
Des the work area have sufficent, stocked spill kits?
-
Does the work area segregate and store waste correctly for final disposal?
Treatment Area
-
Treatment Area
-
Are all cells in use free of rubbish or rock fragments?
-
Is material evenly spread in the open and closed cells?
-
Is material in the closed cells undergoing treatment no more than 300mm thick?
-
Are closed cells undergoing treatment tilled regularly?
-
Are closed cells undergoing treatment irrigated regularly and all sprinklers working?
-
Are all cells graded to retain stormwater?
-
Have the closed cells undergoing treatment been regularly sampled?
-
Is there detectable odour present?
-
Is there any evidence of spills, leaks, overfills or erosion within the containment area, liner or bunds?
-
Are sumps in good condition with no visible cracks, defects or containment issues?
Housekeeping
-
Housekeeping
-
If no one was present at the landfill before you arrived, were the entry gates secured?
-
Is the perimeter fencing and gates in good condition?
-
Are all signs are clean and visible?
-
Are signs directing people to the correct ‘open’ cells for dumping contaminated soil?
-
Are 'closed’ signs in place for cells undergoing treatment?
-
Has the register has been completed correctly?
-
Is housekeeping in the area good?
Facility Compliance
-
Is the area considered compliant with relevant approvals and regulations?
-
Are actions required?
-
Actions Required
Action