Information

  • Project Name

  • Date and time site induction conducted

  • Location
  • Inductor's Name / Position

Inductee details

  • Employer Name

  • Employer Phone No.

  • Employee Name

  • Position of Employment

  • General Induction Card Date

  • General Induction Card Number

  • General Induction Card photo

  • I have attended a WMS/Safety Plan/Risk Assessment induction by my employer

  • Other Certificates of Competency/Permits (cert number/class)

My signature below confirms that I have been instructed in and understand the following:

  • 1. Site specific induction carried out by Kerdic Homes

  • 2. My employer's site specific health & safety plan or work method statements

  • 3. Worker's obligations under the Workplace Health & Safety Act

  • 4. Who to contact if there is an emergency, incident or hazard, who is the designated first aid officer and where to access the first aid kit

  • 5. Report any OH&S event to the Safety Advisor if not available to the Site Supervisor

  • 6. I am aware of Kerdic Homes' Safety Policy and that it is included in the Project Safety Plan

  • 7. I have been advised where I can access all relevant legislation, codes of practice and standards at Kerdic Homes (refer to ME:06 Legislation & Other Information if contractor requires detailed information)

  • 8. I have been advised about the Dispute Resolution Process and understand that if I am not in agreement with the OH&S Dispute Resolution process, that I can request a new Dispute Resolution Process and this process is to be raised and resolved at project induction, this new agreed process will be entered into the Project Safety Plan

  • 9. I am aware that the National Code of Construction 2015 applies to this project

  • 10. I have been informed of all common plant and details about how it is to be used

  • If supplying plant and equipment: I have completed and forwarded the Plant & Equipment Checklist App-ME:13M and confirm that there have been no changes to the checklist provided.

  • I hold the appropriate licenses and qualifications for the work I will undertake on this project.

  • I will also follow health and safety instructions as directed by Kerdic Homes and understand I may be denied access to the project if I fail to follow health and safety provisions on site.

  • Worker Signature

  • I agree with the Dispute Resolution Process (if new process is advised refer to ME:05 item 24)

  • In an emergency, please contact:

  • Phone No.

  • Medical Conditions/Allergies

KERDIC HOMES USE ONLY

  • I have sighted the abovementioned General Safety Induction Evidence and licenses and the abovementioned person has been provided with a specific induction for this project which addressed the items required for site inductions in the Project Safety Plan:

  • Grant Baillie

Induction

As a Kerdic Homes worker/subcontractor I am aware and have been given the opportunity to raise any issues with the following points:

  • I am aware that I am to wear appropriate Personal Protective Equipment relative to the task I am performing and have been given training in its use

  • I have been advised who to contact if an incident occurs

  • All safety issues should be reported to a Kerdic Homes Representative

  • I am aware all rubbish is to be placed in designated areas

  • I am aware only licensed scaffolders are to erect/dismantle scaffold over 4 meters and only licensed scaffolders may alter the scaffold.

  • If an area is barricaded I must avoid walking through the barricaded area

  • Work areas are to be kept clean and tidy at all times

  • I must carry my general Induction card (White Card) at all times on site

  • I must not be affected by drugs or alcohol anytime whilst working on site

  • I will not engage in any activities that will bring Beechwood Homes into disrepute

  • Smoking is only permitted in designated areas where there is no risk of fire or damage to house, cigarette butts must be disposed of appropriately

  • No fighting or over aggressive behavior will be tolerated

  • I will be engaging in high risk activity as stated in Work Health & Safety Regulations 2011, if yes prior to conducting work I will submit a Safe Work Method Statement to Fowler Homes and I will have read, understood and signed SWMS

  • Work involving a risk of a person falling more than 2m

  • Any work connected with an excavation or demolition

  • Work involving structural alterations or repairs

  • Work is carried out in or near a confined space

  • Work in or near a pier or trench greater than 1.5m

  • Work is carried out on or near

  • I understand that if I fail to adhere to Kerdic Homes policies and procedures as stated in the WHS management Plan, I will be required to pay costs for any non conformance. The contents of the Beechwood Homes WHS Management plan is accessible online at www.beechwoodhomes.com.au/subcontractors

  • I certify that I have undergone Kerdic Homes Subcontractor Induction Training and have been made aware of Site Rules, WHS management Plan and Code of conduct

  • Induction given by:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.