Title Page

  • Job Number

  • Inspection Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location/Room

Commissioning Report

  • This document records testing and QA results of the audio visual system recorded by the technician at the time of assessment detailed on the cover page.

  • Audio Visual System audit preparation information and documentation

  • Confirm a copy of the "For Construction" Schematic drawing set is available to complete this report.

  • Confirm required test equipment is available to complete the system audit.

  • Select test equipment used to conduct the system audit.

  • Confirm access to required project information to complete commissioning. (System Config Worksheet) This should include I/P address and network information, client contact information, client account information, etc.

Visual Record of Installed System

  • Photographs recording the Audio Visual installation as a clear visual record of key components. Room location identifiers should also be photographed.

  • Visual Displays including Flat Panels, Projectors, LED Walls etc

  • AV Equipment including user interfaces, microphones, speakers and equipment racks

  • Connection points including wallplates, floor boxes and patch panels

  • Wireless AV Equipment

  • Other

AV Equipment

  • Confirm power to all AV equipment

  • Confirm network connection of all AV equipment

  • Confirm suitable and adequate ventilation of equipment

  • Confirm all terminations correct and secure

  • Confirm equipment free of dust and marks

  • Does the AV system have an equipment rack/s or equipment at a central location?

  • Confirm all rack equipment securely mounted

  • Confirm suitability of rack servicability

  • Confirm feet / casters locking / levelling

  • Confirm cabling secure using cable ties and / or valcro

  • Confirm suitable cable management and suitable use of lacing bars

  • Does the AV system have connection wallplates?

  • Select wallplate location/s

  • Photo of wallplate/s

  • Confirm installed wallplate/s are secure, level and operable

  • Wallplates tested with

  • Does the AV System include Cable Looms?

  • Cable loom/loom's have been installed and tested with

Audio

  • Does the project include Audio systems?

  • Does the AV System have a FOH (Front Of House) Speaker system?

  • Confirm FOH speaker operation and level threshold

  • Confirm FOH speaker installation and mounting is safe and level

  • Confirm FOH impedience and polarity / phase

  • Confirm FOH audio source switching

  • Confirm FOH audio reproduced is free from distortion

  • Confirm correct DSP operation

  • Does the AV system use microphones

  • Confirm wired mic phantom power, gain structure and operation performance

  • Confirm Wireless Microphone operation (Lapel & Handheld)

  • Confirm correct DSP operation

  • Does the system have Hearing Augmentation assistance systems

  • Confirm hearing assistance system is operational and passing audio

  • Select hearing augmentation system type

  • Does the AV System have a Ceiling Speaker system

  • Confirm ceiling speaker operation and threshold

  • Confirm ceiling speaker installation and mounting is safe

  • Confirm ceiling speaker impedience

  • Confirm audio source switching to ceiling speaker system

  • Confirm ceiling audio reproduced is free from distortion

  • Confirm correct DSP operation

  • Does the AV system include EWIS FIP connectivity

  • Confirm audio mute and return program via I/O high and low state

  • undefined

Room Booking Panels

  • Does the room include a Room Booking Panel (RBP)?

  • RBP powered?

  • Correct IP settings (DHCP or Static)?

  • Correct time settings?

  • Correct app used (Teams, Crestron, etc.)?

  • RBP has been mounted correctly?

  • RBP signed in?

  • RBP is able to display room bookings

  • Has the Teams LED settings been set?

  • Has the Teams Meeting room release time been set?

  • RBP correctly displaying room and calendar details?

  • Does the RBP display the correct occupancy status? (e.g. Green for available)

  • On line in cloud portal (e.g. XiO)?

  • Has Firmware been updated (Recorded at QA and verified at Commissioning)

  • Has MAC addresses been updated (Recorded at QA and verified at Commissioning)

  • Photo of RBP

Video

  • Does the project include Display Components?

  • Does the AV System include Flat Panel Displays (FPD)?

  • Confirm images passed to FPD is correct aspect ratio and free of jitter or artifacting

  • Does the FPD include integrated audio reproduction via local speakers

  • Confirm Audio reproduced correctly via

  • Confirm FPD edid management

  • Confirm FPD HDCP operation for all sources

  • Confirm FPD image resolution is native to the panel

  • Confirm FPD brightness, contrast and colour settings

  • Confirm FPD MATV operation and performance

  • Confirm local input wallplate connection on all display

  • Photo of FPD displaying native image

  • Does the AV System include Data Projection Technology?

  • Confirm images passed to projector are correct aspect ratio and free of jitter or artifacting

  • Confirm projector EDID management

  • Confirm projector HDCP operation for all sources

  • Confirm projector image resolution is native to the unit

  • Confirm projector brightness, contrast and colour settings

  • Confirm local input wallplate connection on the Projector

  • Photo of Projector displaying native image

  • Confirm Foxtel operation on all required displays

  • Does the AV system use wireless presenter Technology

  • Confirm pairing of transmitter/s

  • Confirm Audio and Video transmission is clear and free of distortion or dropouts

  • Does the AV system include stand-alone Cameras or webcams

  • Confirm all camera images are stable, free of jitter and correct colour balance

  • Photo of display showing Camera operation

Video Conferencing

  • Does the AV System include Video Conferencing?

  • Confirm all camera images are stable, free of jitter and correct colour balance

  • Confirm Video received from far end

  • Include photo showing camera image

  • Confirm near end camera control

  • Confirm Audio received from far end

  • Confirm Dialling and codec control

  • Confirm codec control via

  • Confirm Video sent to far end

  • Confirm content received from far end

  • Confirm Audio sent to far end

  • Confirm content sent to far end

  • Confirm quality of conferencing performance

Control

  • Does the Room have a control system?

  • Select the means of controlling the AV system

  • Confirm power and connectivity of touch panel/s in the AV system

  • Confirm touchpanel user interface, page flips and selection button operation

  • Confirm power and connectivity of keypad/s in the AV system

  • Confirm keypad button labelling and selection

  • Confirm control of all AV devices in the system

  • Confirm operation of external devices (lights, blinds, lifts, screens)

  • Confirm room linking operation tested - if appliciable

  • Confirm PIR operation

  • Confirm system power switching devices correctly

  • 240v System power cycle performed

  • undefined

Digital Signage

  • Does the room have Digital Signage?

  • Is the LCD/s powered?

  • Does the screen auto power on after power loss?

  • Do they auto wake with system?

  • Do they wake with control system?

  • Is screen connected to network (if required)?

  • Correct IP settings (DHCP or Static)?

  • Correct time settings?

  • Are all on-screen messages turned off?

  • Content being displayed correctly?

  • Sleep Timer set (if applicable)

  • Has Firmware been updated (Recorded at QA and verified at Commissioning)?

  • Has MAC addresses been updated (Recorded at QA and verified at Commissioning)?

  • Signage app installed and connecting to source (e.g. Cloud server)

  • Is there connection to a control system?

  • Is control working correctly?

Defects

  • Does the system have any defects to record

  • Please record any defects below. Include visual record

  • Add media

  • Has all areas in which work AV works performed been left clean and tidy

  • Has all equipment packaging and rubbish been removed from site

  • Is the system ready for client / user training

  • Has the AV drawing set been marked up to submit "As Built"

System sign off

  • We agree of the site attendance and testing performed in this audit.

  • Date of audit sign off

  • Signed by Generation-e representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.