Title Page
-
Company Name:
-
Customer Name:
-
Job / Project Name:
-
Date Performed:
-
Technician Name:
-
Job Site Address:
SOLAR (PV) INSTALL INSPECTION
-
Visually inspected each solar module
- Yes
- No
- N/A
-
Wash solar array thoroughly
- Yes
- No
- N/A
-
Check mounting hardware is still secure
- Yes
- No
- N/A
-
Check external wiring supports
- Yes
- No
- N/A
-
Check the integrity of the earthing system
- Yes
- No
- N/A
-
Check DC isolators for water ingress
- Yes
- No
- N/A
-
Check DC isolators for correct operation
- Yes
- No
- N/A
-
Check all connectors are engaged correctly
- Yes
- No
- N/A
-
Check labeling is still legible and correct
- Yes
- No
- N/A
GROUND LEVEL INSPECTION
-
Inverter has been cleaned
- Yes
- No
- N/A
-
Inverter screen is still legible
- Yes
- No
- N/A
-
Check electrical wiring supports are still secure and intact
- Yes
- No
- N/A
-
Check operation of DC isolators
- Yes
- No
- N/A
-
Check connectors are engaged properly
- Yes
- No
- N/A
ANTI ISLANDING TEST
-
How long does the Inverter take to disconnect ( < 2sec)
-
How long does the Inverter take to reconnect ( > 60sec)
-
Does the system pass the Anti Islanding test
SYSTEM TEST
-
String Test Results
String
-
String polarity
-
Irradiance at time of testing
-
String measured Voc
-
String measured Isc
-
String 1 Vmp
-
String 1 Imp
-
Inverters Yearly Production Output
-
Inverters Lifetime Output
REPORT ANALYSIS
-
Repairs urgently needed
-
Repairs suggested
-
Overall comments on system service
-
Technician signature