Information
-
Site 9 - Post Handover inspection check-list
-
BUILDING ID
-
Conducted on
-
Prepared by
-
Location
-
Personnel
LIVING ADVENTURE - POST HANDOVER AUDIT CHECK-LIST
-
STANDARDS
LIVING ROOM
-
Switch off the power socket the WiFi Router
-
Adjust the AC to +24C and leave it on
-
Check all the sockets and make sure nothing has been left switched on
-
Check the floor & ceiling for any damages
-
Close the windows & balconies hermetically to prevent any dust or dirt coming in and close curtains
-
Check the upholstery of the soft furniture for any damages or stains
-
Check the other furniture for any damages
-
Check the toilet and make sure that hand bidet /shataf tap closed
-
Open the tap and run the hot and cold water for few minutes only
-
Check the toilet floor & ceiling for any damages
-
Switch off the al the lights including balcony lights and close<br>the curtains
KITCHEN
-
Keep the fridge on and running
-
Switch off the power socket all the small kitchen appliances e.g. kettle, toaster, microwave etc
-
Keep the main switch on Hot Water
-
Open the tap and run the hot and cold water for few minutes only
-
Check the kitchen floor & ceiling for any damages
-
Switch the lights off in the kitchen
Bedroom 1 & Toilet 1
-
Switch off the power socket of TV and IP TV
-
Switch off the power socket the Lamps
-
Switch off the power socket the WiFi Router
-
Adjust the AC to +24C and leave it on
-
Check all the sockets and make sure nothing has been left switched on
-
Check the floor & ceiling for any damages
-
Close the windows & balconies hermetically to prevent any dust or dirt coming in and close curtains
-
Check the other furniture for any damages
-
Check the mattress and the soft furniture for any damages or stains
-
Check the toilet and make sure that hand bidet /shataf tap closed
-
Open the tap and run the hot and cold water for few minutes only
-
Check the bathroom floor & cieling for any damages
-
Check the soap/shower gel/shampoo dispensers against any leakage
-
Flush the toilet to refresh the water in the water tank
-
Switch the lights off
-
Keep the Hot Water for the bathroom switched on
BEDROOM 2 & TOILET 2
-
Switch off the power socket of TV and IP TV
-
Switch off the power socket the Lamps
-
Switch off the power socket the WiFi Router
-
Adjust the AC to +24C and leave it on
-
Check all the sockets and make sure nothing has been left switched on
-
Check the floor & ceiling for any damages
-
Close the windows & balconies hermetically to prevent any dust or dirt coming in and close curtains
-
Check the other furniture for any damages
-
Check the other furniture for any damages
-
Check the mattress and the soft furniture for any damages or stains
-
Check the toilet and make sure that hand bidet /shataf tap closed
-
Open the tap and run the hot and cold water for few minutes only
-
Check the bathroom floor & cieling for any damages
-
Check the soap/shower gel/shampoo dispensers against any leakage
-
Flush the toilet to refresh the water in the water tank
-
Switch the lights off
-
Keep the Hot Water for the bathroom switched on