Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Carpenter Framer

  • Frames erected plumb & straight

  • Building parallel & check square

  • Kitchen frames square & straight

  • Bathrooms square & straight

  • All partitions & corners nailed off straight

  • Tie downs done

  • Sheet braces in place and nailed correctly

  • Hold down bolts in correct positions/tight

  • Ridge line tied together, trusses nailed plumb

  • Shower position correct

  • Road left clean

  • Strap bracing as per plan & tensioned

  • Triple grips and cyclone ties on

  • Extra eave nogging for larger eave areas

  • Top plates straight & nailed off

  • Joist hangers as shown on pre-cut plan

  • Valley/Hips/Gables straight

  • Frame treatment as per spec

  • Termite treatment in place

  • Site left in safe manner

  • G.J. signs & danger signs up

  • Job left clean, rubbish in bin

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.