Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Carpenter Framer
-
Frames erected plumb & straight
-
Building parallel & check square
-
Kitchen frames square & straight
-
Bathrooms square & straight
-
All partitions & corners nailed off straight
-
Tie downs done
-
Sheet braces in place and nailed correctly
-
Hold down bolts in correct positions/tight
-
Ridge line tied together, trusses nailed plumb
-
Shower position correct
-
Road left clean
-
Strap bracing as per plan & tensioned
-
Triple grips and cyclone ties on
-
Extra eave nogging for larger eave areas
-
Top plates straight & nailed off
-
Joist hangers as shown on pre-cut plan
-
Valley/Hips/Gables straight
-
Frame treatment as per spec
-
Termite treatment in place
-
Site left in safe manner
-
G.J. signs & danger signs up
-
Job left clean, rubbish in bin