Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Earthworks
-
Check correct site No.
-
Identified correct datum
-
Platform is at correct height
-
Retaining wall cuts correct
-
Batters correctly done
-
Compaction approved / cert
-
Position of remaining topsoil is okay
-
Any damage to road / path
-
Temp access satisfactory
-
Silt control in place
-
Checked orders / plans for non standard items
House Keeping
-
Bin in place
-
Site left in a safe manner
-
G.J sign and danger sign up
-
Job left clean, rubbish in bin.
Are any rectification works required?
-
Works required
-
Date to be completed
-
Signature of person conducting the Audit