Information
-
Document number
-
Facade Type
-
Level
-
Elevation
-
Conducted on
-
Prepared by- Lider
CONTROL/CHECK
-
Are glass panes compliant with manufacturers specifications?
-
Manufacturer's stamp in the correct position?
-
Damaged glass?
-
Are glass panes installed within the specified tolerances?
-
All toggles/pressure plates engaged?
-
Even distribution of glass over glazing shoes/glazing bead?
-
Are glass panes fixed and secure as per drawings provided ?
-
Mastic works completed?
-
Spandrel area: glass panel engaged in all brackets?
-
Spandrel area: black strip between glass panes installed?
-
Spandrel area: glass panel brackets secured with screws?
-
Spandrel area: all gaps even?
-
After installation of Kerafix, are there visible gaps between glass panes?
-
Has the area been cleaned and waste including COSHH materials removed to allocated bins?
Comments
-
undefined
Inspected by
-
Lider
-
Witnessed by
-
Mace