Report
-
Conducted on
-
Conducted by
-
Location
-
Address
Item Check List
-
1. Dust Sheet & Floor Protection
-
2. Existing Frames Removed Carefully
-
3. Frame Installed Square and Level
-
4. Fixing Positions Correct
-
5. Frame and Glass Cleaned
-
6. DG Units Correct
-
7. Security Packers Fitted
-
8. Screw and All Cover Caps Fitted
-
9. Final Fixing Screw
-
10. Bay Poles & Kits Fitted Correctly
-
11. Drainage
-
12. Mastic Finish
-
13. End Caps On
-
14. Gasket free from Damage
-
15. Night Vent Operation
-
16. Overall Appearance of the Windows
-
17. Operation of Windows, Doors and Vents
-
18. Work Area Cleaned
-
19. Maintenance Handbook with Resident
-
20. Resident Shown Window Operation
-
21. Remakes Identifiable
-
REPORT ON ALL ITEMS REQUIRING ATTENTION
-
ACTION TAKEN
Signed off
-
Inspection completed by:
-
Signed
-
Select date