Title Page
-
Pre site inspection report Site Address
-
Conducted on
-
Prepared by
-
Location
-
Please take Min 6x photos
-
Has the site been cleared
-
Does the site need rubbish removal
-
Does the site need to be mowed
-
Do you have the preliminary plans with you
-
What's the Water meter reading if applicable
-
Are there any overhead power lines
-
Will there be a requirement for retaining walls after site cut
-
Please mark up the services on the site plans eg. water meter, Green boy, Pits etc.
-
Is there any Fire Ants present on Site
-
Is there any Footpath damage
-
Is there any Kerb damage in front of the Lot
Next door Lots
-
Is there an existing neighbour retaining wall
-
What's the condition of the fences
-
Will this Job require Traffic control
-
Is there good site access
-
Is there a playground or school across the road or nearby