Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Building Permit Number

  • The following site inspection report visual verfies to the best abilty at the time of inspection compliance with the plans and specifications that have be reference in this report..

  • Setback measurements taken from and to the best capabilities at time of inspection?<br>Note: If boundaries are not clearly identified (e.g survey pegs), a Registered Surveyor Certificate will be required.

  • Comments

  • Photos

  • Site conditions / preparation in accordance with soil classification report or noted to dwgs?

  • Photos

  • Excavation dimensions (with and depth) correct and free from organic matter , loose material and voids?

  • Building compaction certificate provided or would visual appear to be compacted?

  • Has the vapour barrier been installed correctly?

  • Has the vapour barrier been tapped around penetrations?

  • Photos

  • Reinforcement type correct, adequately lapped, tied, supported and concrete cover archived?

  • Slab concrete depth maintained where waste water / soil pipe penetrations proposed?

  • Proposed finished floor level would appear to be correct at stage of construction?

  • Comments

  • Photos

  • Additions / discussed held on site :

  • Building surveyor signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.