Information

  • Site

  • Conducted on

  • Prepared by

  • Location
  • Concrete Contractor

  • Check site cut (R.L) and floor level (R.L) as per site plan?

  • Has the substrate been left ready by the drainers and filled and levelled by the concretor prior to placing plastic and pods.<br>This ensures concrete is not wasted.

  • Confirm set out has been carried out as per site plan and concretor has followed pegs.

  • Is the founding material as per the soil report?

  • Was depth or number of bored piers altered due to site conditions?<br>Measure and record all piers below.

  • Has Engineer inspected slab

  • Was rock encountered during excavations?

  • Is excavated spoil to be stockpiled or removed?

  • Does the site require sub-surface drainage during construction?

  • Has Termite protection been installed?

  • Ensure any step downs are as per plan

  • Check Kitchen island bench plumbing/electrical conduit pipe

  • Check Meter Box is located as per plan

  • Check position of drainage pipes

  • Check steel for cover to formwork and ground.

  • Check steel install to ensure as per detail, including laps at joins.

  • Check footing size, location and depth to match design.

  • Check for Footpath damage

  • Check for plumbing sticker to pies and photograph.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.