Title Page
-
Date
-
Job Number:
-
Job Name:
-
Location of Pour
1. Preparation
-
1a. Have own set of current approved drawings (Structural, Post-Tensioning tendon placement drawings & Rebar placement drawings)
-
Corrective Action Taken:
-
Date of drawings (Structural, PT, & Rebar):
-
1b. Have consulted with Engineer over critical inspection needs for this slab
-
Corrective Action Taken:
-
Name of Engineer
-
Engr. Tel.#
2. Formwork
-
2a. Geometry of drop caps, drop panels, beams, soffit slopes, slab thicknesses, etc.
-
Corrective Action Taken:
-
Slab thickness:
-
2b. Tight, clean & free of puddles
-
Corrective Action Taken:
-
2c. Reshoring in place if required
-
Corrective Action Taken:
-
2d. Correct slab edge geometry
-
Corrective Action Taken:
-
Slab edge installed per drawing:
-
Dated:
-
Slab edge anticipated to shorten __" after stressing.
3. Mild Steel Reinforcing
-
3a. Reinforcing at walls and columns (sizes, lengths, spacing & staggers)
-
Corrective Action Taken:
-
3b. Bottom mat (size & spacing)
-
Corrective Action Taken:
-
3c. Beams (top bars, bottom bars, bar cutoff points, stirrups & spacings)
-
Corrective Action Taken:
-
3d. Additional special locations shown on plans (corners, etc.)
-
Corrective Action Taken:
-
3e. Cover:
-
Corrective Action Taken:
-
Cover required at top:
-
Cover required at bottom:
-
3f. Clean
-
Corrective Action Taken:
-
3g. Lap splice lengths (bottom mat, beams, etc.)
-
Corrective Action Taken:
-
3h. Slab/wall dowels cast into walls & at position within slab
-
Corrective Action Taken:
-
3i. Reinforcing & chairs securely tied
-
Corrective Action Taken:
-
3j. Proper tools used for field bends
-
Corrective Action Taken:
-
3k. Proper grade reinforcement
-
Corrective Action Taken:
4. Post-Tensioning
-
Is there post-tensioning on this slab?
-
4a. Tendon condition (sheathing intact, no kinks, no tears, etc.)
-
Corrective Action Taken:
-
4b. Number and location of tendons
-
Corrective Action Taken:
-
4c. Tendon profiles (all high points and low points checked)
-
Corrective Action Taken:
-
Tolerance per drawings:
-
4d. Smooth curvature of tendons (horizontally and vertically)
-
Corrective Action Taken:
-
4e. Sweep of tendons around blockouts & openings (smooth curvature & radius per drawings)
-
Corrective Action Taken:
-
4f. Column cap details (precedence of tendon layers, etc.)
-
Corrective Action Taken:
-
4g. Watertight corrosion protection details
-
Corrective Action Taken:
-
4h. Tendons, support bars and chairs securely tied at all support locations
-
Corrective Action Taken:
-
4i. Tendons locations marked on forms for future reference
-
Corrective Action Taken:
-
4j. Anchorages
-
Corrective Action Taken:
-
4j-1. Special reinforcing details
-
Corrective Action Taken:
-
4j-2. Live ends secured tightly to formwork
-
Corrective Action Taken:
-
4j-3. Dead ends chaired to appropriate profile
-
Corrective Action Taken:
-
4j-4. Anchors to bear against solid concrete (not near conduit, etc.)
-
Corrective Action Taken:
-
4j-5. Spacing, stagger, & orientation of anchors
-
Corrective Action Taken:
-
4j-6. Tendon straight into anchor (per placement drawings)
-
Corrective Action Taken:
-
4j-7. Adequate tails for stressing
-
Corrective Action Taken:
-
4j-8. Adequate clearance for stressing equipment
-
Corrective Action Taken:
-
4k. Sweep bars installed per Structural drawings (detail 24/S-408 states: required for cable sweeps tighter than 1" in 12", clear distance between cables = 2", and #4 U-bars installed 12" on center over length of curved section for each bundle)
-
Corrective Action Taken:
-
4l. Backup bars installed at groups of 6 or more cables
-
Corrective Action Taken:
-
Backup bar to be placed 3/8 of the slab thickness away from the anchors (ex: 3" for 8" slab, 3.75" for 10" slab, 4.5" for 12" slabs)
-
4m. Backup bars installed at dead ends at beams
-
Corrective Action Taken:
-
Backup bar to be placed 3/8 of the slab thickness away from the anchors (ex: 3" for 8" slab, 3.75" for 10" slab, 4.5" for 12" slabs)
-
4n. When tendons are placed through the column, do at least two tendons in both directions pass through the column vertical reinforcement?
-
Corrective Action Taken:
5. Embedments
-
5a. Embedments near anchorages approved by engineer
-
Corrective Action Taken:
5b. Conduit
-
5b-1. Engineer approval (if not shown on engineer-approved plans)
-
Corrective Action Taken:
-
5b-2. Maximum approved size
-
5b-3. Approved material
-
5b-4. Locations and congestion
-
Corrective Action Taken:
-
5b-5. Special reinforcing details
-
Corrective Action Taken:
5c. Plumbing and other blockouts:
-
5c-1. Engineer approval (if not shown on engineer-approved plans)
-
Corrective Action Taken:
-
5c-2. Maximum approved size
-
5c-3. Locations (specific engineer approval if in drop caps or highly reinforced areas)
-
Corrective Action Taken:
-
5c-4. Special reinforcing details
-
Corrective Action Taken:
-
5d. Anchor bolts and Hand-Downs secured in place
-
Corrective Action Taken:
-
5e. Embeds Installed:
- Stair
- Garage Door
- Window
- Formwork
- Hoist
- Crash Barriers
- Cable Rails
- Chain Link Fence
- Elevator
- Scoop Wall Anchor Bolts
- Canopy Anchor Bolts/Embeds
- Masonry
-
Drawing #s and Dates of embed drawings used:
6. Blockouts & Closure Strips
-
6a. Geometry and location
-
Corrective Action Taken:
-
6b. Special reinforcing details
-
Corrective Action Taken:
-
6c. Special shear key details (if required)
-
Corrective Action Taken:
-
6d. Adequate clearance for stressing equipment (if required)
-
Corrective Action Taken:
7. Other
-
7a. All details shown on drawings (Structural, Post-Tensioning tendons & Rebar) applied appropriately
-
Corrective Action Taken:
-
7b. Typical details applied appropriately
-
Corrective Action Taken:
-
7c. Projections of walls & columns into slab within tolerance
-
Corrective Action Taken:
-
7d. Special release/slip details applied appropriately
-
Corrective Action Taken:
-
7e. Engineer notified of any conflicts that required modifications
-
Corrective Action Taken:
-
7f. Engineer notified of pour date and of any changes to pour date
-
Corrective Action Taken:
-
7g. Stud rails installed correctly (straight, correct cover, etc.)
-
Corrective Action Taken:
-
Completed by: McHugh Concrete Team
-
Date Completed: