Title Page

  • Contract Number

  • Contractor Name

  • Project Name

  • Conducted on

  • Prepared by

  • Pour Location

Pre-Pour Checklist

  • Is the building weather-tight?

  • Are there any openings/Glass with direct sunlight or wind on to slab?

  • Has a sub base survey been completed?

  • Is the correct membrane being used?

  • Is the isolation full depth and sealed?

  • Is the slab depth known?

  • Has the correct mesh been used?

  • Are the reinforcement overlaps correct?

  • Are Crack control chairs made and ready for fixing

  • Does the mesh have the correct cover?

  • Are correct spacers been used?

  • Is wall protection required?

  • Has the wall protection been placed?

  • Are the joint details correct?

  • Are the dowel sizes correct?

  • Has all mesh and rebar been tied

  • Has a wash out area been made available

  • Has the pump location and traffic route been confirmed

  • Fortel Signature

  • Client Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.