Title Page

  • Site Address -
  • Conducted on

  • Prepared by

Site Inspection

  • Temporary fencing installed around site?

  • Construction site sign legible and displayed<br>on front fence?

  • Toilet on site clean and in good working<br>order?

  • Site office installed and setup?

  • Cool drinking water available?

  • Site induction training completed for all new trades on<br>site?

  • Construction Induction training completed?<br>(Red card or equivalent)

  • SWMS's completed for medium/high risk trades on site?

Excavation

  • Is site adequately protected from public access?

  • Is site benched to correct level?<br>

  • Has land surveyor pegged the site?

  • Has the base been passed by the building surveyor?

  • Has the concreter used the surveyors set out pegs?<br>

Building surveyor inspections

  • Have the piers been approved?<br>

  • Has the base inspection been approved?

  • Has steel inspection been approved?

  • Has building surveyor approved slab for pouring?

  • Has sewer/stormwater services been checked by camera pre pour?

Preslab

  • Are all porches and columns included in set out?

  • Are slab elevations all as per drawings?

  • Are all edge beams at correct depth?

  • Are all edge beams as per engineers design?

  • Are deepened rebates as per engineers design?

  • Are step downs per engineers design?

  • Are garage step downs as per plans and engineers design?

  • Are trenches clear of debris?

  • Are internal beams located as per engineers design?

  • Are all plumbing waste pipes as per working drawings?

  • Are upper level stack pipes as per working drawings?

  • Are all waste pipes sewer grade pipes? (Eg 100mm)

  • Are all sewer pipes and breather pipes located as per working drawings?

  • Does all pipe work have adequate concrete coverage?

  • Does all pipe work have adequate lagging?

  • Is service conduit installed for kitchen sewer?

  • Are shower recesses boxed out in the correct location?

  • Is all plastic membrane laid and adequately tapped and joined? (200mm lap)

  • Is plastic membrane adequately tapped and joined around sewer pipes?

  • Is trench mesh as per engineers drawings?

  • Is trench mesh adequately overlapped and tied at joins?

  • Is all reinforcement fabric adequately overlapped and tied?

  • Is all reinforcement fabric adequately tied to corner bars as designed by engineers?

  • Is all reinforcement fabric installed on correct bar chairs?<br>

  • Is all additional reinforcement for load points installed as per engineers design?

  • Has the under slab termite treatment been installed

Post pour

  • Have all boxing / stakes etc been removed?

  • Finish of the completed slab?

  • Check slab for flatness with 2m level and mark up as required.

Construction foreman sign off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.