Information
-
Document No.
-
Site Name
-
Site Address
-
Job Reference
-
Date of Visit
-
Report by
-
Site Induction Included:
-
Personnel involved
Audit (1=Very Poor, 2=Poor, 3=Acceptable, 4=Good, 5=Excellent)
-
Access / Egress to work area
-
Documentation held on site
-
Are method statements being followed
-
Condition of hand tools
-
Condition of machinery and equipment (PAT tested? Calibrated?)
-
Housekeeping and tidiness of work area
-
Waste disposal appropriate and in accordance with Waste Management Procedure
-
Permits used correctly (permit to excavate/ hot works etc)
-
Scaffolding / working platforms tagged and in good condition
-
Working at height
-
Unloading and handling of materials
-
Materials stored safely
-
Site welfare / first aid
-
Fire safety
-
Is PPE correct and in good condition
-
Is the PPE being used correctly
-
General site behaviour
Actions
-
Actions
Sign-off
-
Site manager given a copy of the inspection report
-
Site manager signature
-
Signature of person completing inspection