Title Page
-
Project:
- Coventry
- Birmingham
- Leicester
- Leamington Spa
- Warwick
- Stratford
- Northampton
- London
- Wembley
- Portsmouth
- Bournemouth
- Manchester
- Liverpool
- Leeds
- Edinbruh
- Glasgow
- Newcastle
- Bath
-
Conducted on
-
Contractor:
-
Prepared by
-
Location
-
Type of Work Being performed:
Retro Quality Audit
-
Are all boxes left clean and out of sharps?
-
Is there any rubbish left on site?
-
Are all the cables supported on a flat bar or A-Frame?
-
Is there a macrobend or kink on the cables?
-
Is(Are) the joint(s) left in good condition in the box?
-
Is(Are) the joint(s) strapped to a flat bar or A-Frame?
-
Correct glands used in the joint?
-
Glands tighten up?
-
Is yellow tape used every 6 inches (15cm) on kopex?
-
Has kopex been used to protect the cable?
-
Is the cable coil in excess of the allowed 4.3m in the box?
-
Has the coil been left on the wall of the box?
-
Has the cable been pulled through loops of existing cables?
-
Has the cable been twisted around other cables?
Box and surrounding damages
-
Has the lid of the box been damaged due to work commenced ?
-
Does the lid of the box requires replacing due to damage?
-
Are there any visible damage markings around the box due to not using roller bar?
-
Are there any damages on the inside of the box?
-
Are there any damages to utilities caused by the damages on the box?
Signatures
-
Glide Auditor