Information

  • Document No.

  • Audit Title

  • Client / Site

  • Site Contact

  • Conducted on

  • Previous Inspection Date

  • Prepared by

  • Location
  • Personnel

  • Company division

Excutive Summary

Report Summary

    Non conformance summary
  • Category of non conformance

  • Number of occurrences

Previous Inspection

  • Have items from previous inspection report been actioned?

  • If No, state what actions have not been completed and the reasons why?

First Aid

  • Have all accidents been recorded in the site accident book?

  • Have there been any non-injury incidents?

  • Have there been any near miss incidents?

  • Details of any reported incidents.

  • Images relating to this category.

  • Are suitable first aid kits present and the items contained within in date?

  • Is suitable first aid cover provided and first aider details displayed onsite?

  • Recommended 1st aider ratio:
    1 EFAW or FAW person per 50 persons or part thereof

Displayed Information

  • Is an in date and signed Health And Safety Policy displayed?<br>

  • Safety Plan (a)<br>Is the site fire plan on display?

  • Safety Plan (b)<br>Is information for the nearest Accident and Emergency Department displayed?

  • Are the company insurance certificates on display?

  • Is the project F10 on display

  • Is the company EA registration on display?

  • Is the company environmental policy displayed?

  • Are company ISO certificates on display?

  • Is the project Asbestos notification (ASB5) on display?

  • Is there provision for the display of relevant Health and Safety information?

Project paperwork

  • Have all personnel received an induction

  • Are there Method Statements present to cover all works?

  • Have method statements been briefed out?

  • Have suitable and sufficient risk assessments been identified for each task?

  • Are training records available for all personnel currently on site?

  • Is there an Asbestos survey present onsite which has been briefed out to all personnel?

  • Are subcontractors RAMS suitable and sufficient to cover the extent of their works?

Site Welfare

  • Is there a suitable number of toilets onsite?

  • Men only (mains water toilets)
    1-15 = 1 toilet and 1 urinal
    16-30 = 2 toilet and 1 urinal
    31- 45 = 2 toilet and 2 urinal
    46-60 = 3 toilet and 2 urinal

    For chemical toilets double the provision

  • Is warm water supplied for washing?

  • Are supplies of soap etc. adequate?

  • Are suitable canteen facilities present (including microwave, fridge, drinking water and kettle)?

  • Is there a drying room present?

  • Are all areas adequately heated and lit?

  • Are welfare facilities clean and in good condition?

COSHH

  • Have relevant COSHH Assessments been identified?

  • Are all COSHH items suitably stored?

Fire Precautions

  • Has a fire risk assessment completed?

  • Is there a suitable assembly point present and demarcated by signage?

  • Is the means of raising fire alarm adequate (can be heard over site noise)?

  • Are responsible persons nominated and suitably trained?

  • Has a fire drill been completed?

  • Are fire routes clearly defined with signage in place?

  • Are fire extinguishers present on exit routes?

  • Are fire extinguishers present to relevant areas? (welfare area, refueling area, flammable store etc.)

  • Are fire extinguishers in date and seals in place?

  • Is emergency lighting present and tested?

Safety Signage

  • Is the site compound suitably signed

  • Are site access points clearly identified?

  • Is signage displayed at work areas identifying the inherent risks (i.e. no access, high noise areas etc.)?

Work at Height

  • Are ladders being used by GDL personnel, If so are they suitable (class 1) and free from defect and have risk assessment / permit for the task?

  • Are ladders being used by sub contractors, If so are they suitable (class 1) and free from defect and have risk assessment / permit for the task?

  • Have podiums been inspected and are suitable for use?

  • Have all towers been inspected and are suitable for use?

  • Have towers been erected by PASMA trained staff?

  • Is all fixed scaffold suitable for use ?

  • Toe boards fitted (150mm),
    Intermediate rail (no more than 470mm above toe board),
    Top rail (950mm),
    all ladders secured

  • Are Haki stairs suitable (no gaps in handrail - see note above)?

  • Have scaffold inspections been completed and recorded?

  • Is there evidence that the scaffold is overloaded?

  • Are any works on fragile surfaces being completed?

  • If yes, have suitable fall protection means been established? (access equipment, safety nets, etc.)

  • Do current site works involve harness use?

  • Are relevant personnel suitably trained in harness use?

  • Is the correct lanyard being used?

  • Are anchor points suitable?

  • Is all fall mitigation equipment in use free from defect and inspection records available?

  • Are tethered tools being used where work at height is being undertaken?

Excavations

  • Is there permit to dig in place and in date?

  • Are excavation sides suitably supported?

  • Is method of access/egress to excavations secured (fixed ladder)?

  • Is there evidence of materials being stockpiled within 2 metres of excavations?

  • Are daily checks on excavations being completed and recorded?

  • Is there suitable excavation edge protection in place (where non-fixed edge protection is used it MUST be sited at a minimum distance of 2 metres away from any leading edge)?

  • Is there suitable safety signage in place warning of excavations?

Plant and machinery

  • Are operators completing and recording daily pre-start checks?

  • Are relevant inspections (LOLER/PUWER) being completed and recorded weekly?

  • Are all plant operators suitably trained?

  • Is all plant in good working order (mirrors, beacons etc. present)?

  • Are quick hitch safety pins present (not replaced with re-bar)?

  • Is there a banksman present?

  • Images relating to this category.

Lifting equipment and accessories

  • Does all equipment have a valid certificate of thorough examination?

  • Is all equipment in use free from defect?

  • Is the SWL of all equipment known and readily available?

Crane

  • Is there a lifting plan onsite?

  • Are there competent persons onsite to oversee the lift (Appointed person, lift supervisor, slinger signaller)?

  • Are all persons involved in the lifting operation suitably trained?

  • Are piling mat inspections completed and recorded (weekly)?

  • Does the site emergency plan cover crane operations?

Edge Protection

  • Is there fixed edge protection in place where required?

  • Is all edge protection securely fixed and positioned? (where non-fixed edge protection is used it MUST be sited at a minimum distance of 2 metres away from any leading edge)

Temporary works

  • Are all temporary works recorded on the temporary works register?

  • Have all temporary works been inspected?

  • Are temporary works drawings and calculations available for review onsite?

Hot works

  • Is there a valid permit to undertake hot works in place?

  • Is gas cylinder storage suitable (lockable cage, signed, away from ignition sources and site boundary)?

  • Are all hoses free from damage / no temporary repairs?

  • Are gas cylinders secured on a trolley when in use?

  • Are burning operatives wearing suitable PPE?

  • Is the area suitably ventilated?

  • Are burning operatives suitably trained and face fitted for the type of RPE being used?

Isolations

  • Are electrical isolation certificates present?

  • Has water isolation been completed?

  • Are gas isolation certificates present?

  • Are data services isolated?

  • Are M&E services isolated?

  • Are all services suitably marked onsite?

Portable tools and Equipment

  • Do all portable tools, leads etc. have a valid PAT certificate?

  • Are tools and leads free from defect?

  • Is suitable storage for tools and equipment provided?

  • Are all tools fitted with appropriate guards?

  • Is HAVS monitoring being undertaken and recorded?

  • Are all leads suitably managed to prevent hazards?

Hoist

  • Is there a commissioning certificate present for hoist equipment?

  • Have statutory inspections of equipment been completed and recorded (6 monthly)?

  • Are personnel trained in the correct operation of the hoist?

MEWPS

  • Do all MEWPS have a valid certificate of thorough examination?

  • Are pre-use checks being completed and recorded?

  • Are operatives suitably trained (IPAF)?

  • Are harnesses being worn correctly (where required)?

  • Are works being completed safely?

  • Has the emergency set down procedure been recorded and available for review?

Hoarding and fencing

  • Is the site secured through fixed hoarding (if yes continue below)?

  • Is the hoarding sufficient to prevent unauthorised site access?

  • Is the hoarding in good order (no damage, protruding nails etc.)?

  • Are hoarding inspections being undertaken and recorded weekly, as per temporary works requirements?

  • Is all Heras fencing suitably supported and double clipped?

Traffic Routes

  • Is the site traffic plan on display?

  • Are vehicle routes clearly segregated and signed?

  • Do vehicles have a separate entrance into site?

  • Are suitable locations defined for loading and unloading?

  • Has a site speed limit been established and being adhered to?

  • Are vehicle routes suitable?

  • Is site car parking adequately controlled?

Access and Egress

  • Is there a separate pedestrian access point into site?

  • Are pedestrian access routes established and demarcated?

  • Do all access routes have suitable flooring?

  • Are access routes kept free from obstruction?

  • Do all areas have sufficient lighting?

PPE

  • Have site PPE rules been established and displayed?

  • Are PPE rules being adhered to onsite?

  • Is spare PPE available for use by visitors?

Housekeeping

  • Are designated areas for waste storage provided?

  • Are access routes clear of debris?

  • Are all areas suitably cleared of waste?

Environmental

  • Is fuel present in suitably bunded containers?

  • Are spill kits present onsite?

  • Are drip trays/plant nappies in place beneath static/stationary plant and at refuelling areas?

  • Is there any evidence of spills on site?

  • Is there any evidence of tank leaching?

  • Is suitable storage provided for hazardous waste items?

  • Is waste segregated by type?

  • Are waste skips clearly labeled?

  • Are waste collection tickets being retained?

  • Has an ecological survey been completed?

  • Is there any evidence of invasive species?

  • Is there any evidence of nesting birds?

  • Is there any evidence of nearby watercourses?

  • Have suitable watercourse protection measures been implemented?

Health hazards

  • Weils disease risk onsite (if yes continue below)?

  • Risk assessment and control measures implemented?

  • Pigeon guano risk onsite (if yes continue below)?

  • Risk assessment and control measures implemented?

  • Sharps risk onsite (if yes continue below)?

  • Risk assessment and control measures implemented?

  • Foul water risk onsite ( if yes continue below)?

  • Risk assessment and control measures implemented?

  • Legionella risk onsite ( if yes continue below)?

  • Risk assessment and control measures implemented?

  • Carbon Monoxide risk onsite ( if yes continue below)?

  • Risk assessment and control measures implemented?

Public Interface

  • Is dust monitoring being undertaken and recorded?

  • Is noise monitoring being undertaken and recorded?

  • Is vibration monitoring being undertaken and recorded?

  • Have any complaints from neighbours been received?

  • Is there evidence of debris outside of the site boundary?

Site security

  • Is the site suitably secured to prevent trespass out of hours?

  • Are access points to scaffold suitably protected to prevent unauthorised access?

General Observations

  • General non-conformance observed?

  • General non-conformance observed?

  • Positive health and safety action observed?

  • Positive health and safety action observed?

Audit acceptance

  • Audit issued to (name):

Recipients Comments

Close Out Actions

  • 24 hour close out

  • Item
  • Audit finding

  • Add media

  • Root causality

  • Close out action

  • Completed by (sign and date)

  • 3 day close out

  • Item
  • Audit finding

  • Add media

  • Root causality

  • Close out action

  • Completed by (sign and date)

  • 7 day close out

  • Item
  • Audit finding

  • Add media

  • Root causality

  • Close out action

  • Completed by (sign and date)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.