Information
-
Document No.
-
Audit Title
-
Client / Site
-
Site Contact
-
Conducted on
-
Previous Inspection Date
-
Prepared by
-
Location
-
Personnel
-
Company division
- Goody Demolition
- Truecut
- Datum
- P&G Scaffolding
- Horizon
Excutive Summary
Report Summary
-
Non conformance summary
-
Category of non conformance
- 1st aid
- displayed info
- paperwork
- welfare
- COSHH
- fire
- signage
- work @ height
- excavations
- plant and machinery
- lifting equipment
- crane
- edge protection
- temporary works
- hot works
- isolations
- portable tools
- hoist
- MEWPS
- hoarding and fencing
- traffic routes
- access / egress
- PPE
- housekeeping
- environmental
- health hazards
- public interface
- site security
Previous Inspection
-
Have items from previous inspection report been actioned?
-
If No, state what actions have not been completed and the reasons why?
First Aid
-
Have all accidents been recorded in the site accident book?
-
Have there been any non-injury incidents?
-
Have there been any near miss incidents?
-
Details of any reported incidents.
-
Images relating to this category.
-
Are suitable first aid kits present and the items contained within in date?
-
Is suitable first aid cover provided and first aider details displayed onsite?
-
Recommended 1st aider ratio:
1 EFAW or FAW person per 50 persons or part thereof
Displayed Information
-
Is an in date and signed Health And Safety Policy displayed?<br>
-
Safety Plan (a)<br>Is the site fire plan on display?
-
Safety Plan (b)<br>Is information for the nearest Accident and Emergency Department displayed?
-
Are the company insurance certificates on display?
-
Is the project F10 on display
-
Is the company EA registration on display?
-
Is the company environmental policy displayed?
-
Are company ISO certificates on display?
-
Is the project Asbestos notification (ASB5) on display?
-
Is there provision for the display of relevant Health and Safety information?
Project paperwork
-
Have all personnel received an induction
-
Are there Method Statements present to cover all works?
-
Have method statements been briefed out?
-
Have suitable and sufficient risk assessments been identified for each task?
-
Are training records available for all personnel currently on site?
-
Is there an Asbestos survey present onsite which has been briefed out to all personnel?
-
Are subcontractors RAMS suitable and sufficient to cover the extent of their works?
Site Welfare
-
Is there a suitable number of toilets onsite?
-
Men only (mains water toilets)
1-15 = 1 toilet and 1 urinal
16-30 = 2 toilet and 1 urinal
31- 45 = 2 toilet and 2 urinal
46-60 = 3 toilet and 2 urinal
For chemical toilets double the provision -
Is warm water supplied for washing?
-
Are supplies of soap etc. adequate?
-
Are suitable canteen facilities present (including microwave, fridge, drinking water and kettle)?
-
Is there a drying room present?
-
Are all areas adequately heated and lit?
-
Are welfare facilities clean and in good condition?
COSHH
-
Have relevant COSHH Assessments been identified?
-
Are all COSHH items suitably stored?
Fire Precautions
-
Has a fire risk assessment completed?
-
Is there a suitable assembly point present and demarcated by signage?
-
Is the means of raising fire alarm adequate (can be heard over site noise)?
-
Are responsible persons nominated and suitably trained?
-
Has a fire drill been completed?
-
Are fire routes clearly defined with signage in place?
-
Are fire extinguishers present on exit routes?
-
Are fire extinguishers present to relevant areas? (welfare area, refueling area, flammable store etc.)
-
Are fire extinguishers in date and seals in place?
-
Is emergency lighting present and tested?
Safety Signage
-
Is the site compound suitably signed
-
Are site access points clearly identified?
-
Is signage displayed at work areas identifying the inherent risks (i.e. no access, high noise areas etc.)?
Work at Height
-
Are ladders being used by GDL personnel, If so are they suitable (class 1) and free from defect and have risk assessment / permit for the task?
-
Are ladders being used by sub contractors, If so are they suitable (class 1) and free from defect and have risk assessment / permit for the task?
-
Have podiums been inspected and are suitable for use?
-
Have all towers been inspected and are suitable for use?
-
Have towers been erected by PASMA trained staff?
-
Is all fixed scaffold suitable for use ?
-
Toe boards fitted (150mm),
Intermediate rail (no more than 470mm above toe board),
Top rail (950mm),
all ladders secured -
Are Haki stairs suitable (no gaps in handrail - see note above)?
-
Have scaffold inspections been completed and recorded?
-
Is there evidence that the scaffold is overloaded?
-
Are any works on fragile surfaces being completed?
-
If yes, have suitable fall protection means been established? (access equipment, safety nets, etc.)
-
Do current site works involve harness use?
-
Are relevant personnel suitably trained in harness use?
-
Is the correct lanyard being used?
-
Are anchor points suitable?
-
Is all fall mitigation equipment in use free from defect and inspection records available?
-
Are tethered tools being used where work at height is being undertaken?
Excavations
-
Is there permit to dig in place and in date?
-
Are excavation sides suitably supported?
-
Is method of access/egress to excavations secured (fixed ladder)?
-
Is there evidence of materials being stockpiled within 2 metres of excavations?
-
Are daily checks on excavations being completed and recorded?
-
Is there suitable excavation edge protection in place (where non-fixed edge protection is used it MUST be sited at a minimum distance of 2 metres away from any leading edge)?
-
Is there suitable safety signage in place warning of excavations?
Plant and machinery
-
Are operators completing and recording daily pre-start checks?
-
Are relevant inspections (LOLER/PUWER) being completed and recorded weekly?
-
Are all plant operators suitably trained?
-
Is all plant in good working order (mirrors, beacons etc. present)?
-
Are quick hitch safety pins present (not replaced with re-bar)?
-
Is there a banksman present?
-
Images relating to this category.
Lifting equipment and accessories
-
Does all equipment have a valid certificate of thorough examination?
-
Is all equipment in use free from defect?
-
Is the SWL of all equipment known and readily available?
Crane
-
Is there a lifting plan onsite?
-
Are there competent persons onsite to oversee the lift (Appointed person, lift supervisor, slinger signaller)?
-
Are all persons involved in the lifting operation suitably trained?
-
Are piling mat inspections completed and recorded (weekly)?
-
Does the site emergency plan cover crane operations?
Edge Protection
-
Is there fixed edge protection in place where required?
-
Is all edge protection securely fixed and positioned? (where non-fixed edge protection is used it MUST be sited at a minimum distance of 2 metres away from any leading edge)
Temporary works
-
Are all temporary works recorded on the temporary works register?
-
Have all temporary works been inspected?
-
Are temporary works drawings and calculations available for review onsite?
Hot works
-
Is there a valid permit to undertake hot works in place?
-
Is gas cylinder storage suitable (lockable cage, signed, away from ignition sources and site boundary)?
-
Are all hoses free from damage / no temporary repairs?
-
Are gas cylinders secured on a trolley when in use?
-
Are burning operatives wearing suitable PPE?
-
Is the area suitably ventilated?
-
Are burning operatives suitably trained and face fitted for the type of RPE being used?
Isolations
-
Are electrical isolation certificates present?
-
Has water isolation been completed?
-
Are gas isolation certificates present?
-
Are data services isolated?
-
Are M&E services isolated?
-
Are all services suitably marked onsite?
Portable tools and Equipment
-
Do all portable tools, leads etc. have a valid PAT certificate?
-
Are tools and leads free from defect?
-
Is suitable storage for tools and equipment provided?
-
Are all tools fitted with appropriate guards?
-
Is HAVS monitoring being undertaken and recorded?
-
Are all leads suitably managed to prevent hazards?
Hoist
-
Is there a commissioning certificate present for hoist equipment?
-
Have statutory inspections of equipment been completed and recorded (6 monthly)?
-
Are personnel trained in the correct operation of the hoist?
MEWPS
-
Do all MEWPS have a valid certificate of thorough examination?
-
Are pre-use checks being completed and recorded?
-
Are operatives suitably trained (IPAF)?
-
Are harnesses being worn correctly (where required)?
-
Are works being completed safely?
-
Has the emergency set down procedure been recorded and available for review?
Hoarding and fencing
-
Is the site secured through fixed hoarding (if yes continue below)?
-
Is the hoarding sufficient to prevent unauthorised site access?
-
Is the hoarding in good order (no damage, protruding nails etc.)?
-
Are hoarding inspections being undertaken and recorded weekly, as per temporary works requirements?
-
Is all Heras fencing suitably supported and double clipped?
Traffic Routes
-
Is the site traffic plan on display?
-
Are vehicle routes clearly segregated and signed?
-
Do vehicles have a separate entrance into site?
-
Are suitable locations defined for loading and unloading?
-
Has a site speed limit been established and being adhered to?
-
Are vehicle routes suitable?
-
Is site car parking adequately controlled?
Access and Egress
-
Is there a separate pedestrian access point into site?
-
Are pedestrian access routes established and demarcated?
-
Do all access routes have suitable flooring?
-
Are access routes kept free from obstruction?
-
Do all areas have sufficient lighting?
PPE
-
Have site PPE rules been established and displayed?
-
Are PPE rules being adhered to onsite?
-
Is spare PPE available for use by visitors?
Housekeeping
-
Are designated areas for waste storage provided?
-
Are access routes clear of debris?
-
Are all areas suitably cleared of waste?
Environmental
-
Is fuel present in suitably bunded containers?
-
Are spill kits present onsite?
-
Are drip trays/plant nappies in place beneath static/stationary plant and at refuelling areas?
-
Is there any evidence of spills on site?
-
Is there any evidence of tank leaching?
-
Is suitable storage provided for hazardous waste items?
-
Is waste segregated by type?
-
Are waste skips clearly labeled?
-
Are waste collection tickets being retained?
-
Has an ecological survey been completed?
-
Is there any evidence of invasive species?
-
Is there any evidence of nesting birds?
-
Is there any evidence of nearby watercourses?
-
Have suitable watercourse protection measures been implemented?
Health hazards
-
Weils disease risk onsite (if yes continue below)?
-
Risk assessment and control measures implemented?
-
Pigeon guano risk onsite (if yes continue below)?
-
Risk assessment and control measures implemented?
-
Sharps risk onsite (if yes continue below)?
-
Risk assessment and control measures implemented?
-
Foul water risk onsite ( if yes continue below)?
-
Risk assessment and control measures implemented?
-
Legionella risk onsite ( if yes continue below)?
-
Risk assessment and control measures implemented?
-
Carbon Monoxide risk onsite ( if yes continue below)?
-
Risk assessment and control measures implemented?
Public Interface
-
Is dust monitoring being undertaken and recorded?
-
Is noise monitoring being undertaken and recorded?
-
Is vibration monitoring being undertaken and recorded?
-
Have any complaints from neighbours been received?
-
Is there evidence of debris outside of the site boundary?
Site security
-
Is the site suitably secured to prevent trespass out of hours?
-
Are access points to scaffold suitably protected to prevent unauthorised access?
General Observations
-
General non-conformance observed?
-
General non-conformance observed?
-
Positive health and safety action observed?
-
Positive health and safety action observed?
Audit acceptance
-
Audit issued to (name):
Recipients Comments
Close Out Actions
-
24 hour close out
Item
-
Audit finding
-
Add media
-
Root causality
- Lack of training
- Behavioural failing
- Lack of resources
- Sub-contractor failing
- Supply chain failure
- System failure
- Supervisory failing
- Principal contractor issue
-
Close out action
-
Completed by (sign and date)
-
3 day close out
Item
-
Audit finding
-
Add media
-
Root causality
- Lack of training
- Behavioural failing
- Lack of resources
- Sub-contractor failing
- Supply chain failure
- System failure
- Supervisory failing
- Principal contractor issue
-
Close out action
-
Completed by (sign and date)
-
7 day close out
Item
-
Audit finding
-
Add media
-
Root causality
- Lack of training
- Behavioural failing
- Lack of resources
- Sub-contractor failing
- Supply chain failure
- System failure
- Supervisory failing
- Principal contractor issue
-
Close out action
-
Completed by (sign and date)