Information

  • Site

  • Inspection Area

  • Conducted on

  • Inspection Team

Discharge Outlet & Extent

Environmental Management

  • Have area inspections been compelted by area owner?

  • Have all actions from previous environmental contact inspections been closed?

  • Does the work area adequately manage potentially contaminated stormwater from leaving the work area?

  • Does the work area have sufficient stocked spill kits?

  • Does the work area segregate and store waste correctly for final disposal?

Environmental Monitoring

  • Environmental Monitoring

  • Has water quality monitoring been completed as per relevant approvals?

  • Were there any exceedences in the last sample?

  • Was notification made and a resample taken if required?

  • Has monthly discharge flow been recorded as per relevant approvals?

Discharge Outlet

  • Discharge Outlet

Discharge Structure

  • Is water flowing?

  • Is there erosion in the channel as a result of discharge?

  • Is there recent evidence of non-native animals in the area eg cattle?

  • Are there weeds present?

Camera

  • Is the camera fully operational?

  • Have pictures been distributed for the previous 3 days?

  • Are the pictures free from obstructions (vegetation, rain)?

Discharge Extent

  • Discharge Extent

  • Has it rained in the previous 48 hours?

  • What are the coordinates of the discharge extent?

  • Include photos of discharge extent area

  • Is there recent evidence of non-native animals in the area?

  • Has the discharge model been revised in the last year?

  • Does the discharge model match the current discharge extent footprint?

Dewatering Network

  • Dewatering Network

  • Are generators bunded to prevent spills?

  • Is thre evidence of spills or leaks?

  • Are pipes free from obstruction with no obvious water scouring which may pose a risk to operations?

Facility Compliance

  • Was the facility operating as designed?

  • Required Actions

  • Required Actions

  • Action

Sign off

  • Area owner sign off

  • Environmental representative sign off

Dewatering Network

Environmental Management

  • Have all actions from the previous work area inspection been closed?

  • Have area inspections been completed?

  • Does the work area adequately manage stormwater?

  • Does the area have bunding?

  • Is the bunding in good condition, with the bund valve closed and locked?

  • Does the work area have sufficient, stocked spill kits?

  • Does the work area segregate and store waste correctly for final disposal?

Compliance Monitoring

  • Compliance Monitoring

  • Has water quality monitoring been completed as per relevant approvals?

  • Were there any exceedences in the last sample?

  • Was notification made and a resample taken if required?

Dewatering Network

Dewatering Network

  • Dewatering Network

  • Are pumps bunded to prevent spills?

  • Is the area free from spills or leaks?

  • Are pipes free from obstructions (vegetation, rubbish)?

  • Dewatering Network

  • Are pumps bunded to prevent spills?

  • Is the area free from spills or leaks?

  • Are pipes free from obstructions (vegetation, rubbish)?

Compliance

  • Is the area considered compliant with relevant approvals and regulations?

  • Are actions required to rectify issues in this audit?

  • Required Actions

  • Action
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.