Information
-
Site
-
Inspection Area
-
Conducted on
-
Inspection Team
Discharge Outlet & Extent
Environmental Management
-
Have area inspections been compelted by area owner?
-
Have all actions from previous environmental contact inspections been closed?
-
Does the work area adequately manage potentially contaminated stormwater from leaving the work area?
-
Does the work area have sufficient stocked spill kits?
-
Does the work area segregate and store waste correctly for final disposal?
Environmental Monitoring
-
Environmental Monitoring
-
Has water quality monitoring been completed as per relevant approvals?
-
Were there any exceedences in the last sample?
-
Was notification made and a resample taken if required?
-
Has monthly discharge flow been recorded as per relevant approvals?
Discharge Outlet
-
Discharge Outlet
Discharge Structure
-
Is water flowing?
-
Is there erosion in the channel as a result of discharge?
-
Is there recent evidence of non-native animals in the area eg cattle?
-
Are there weeds present?
Camera
-
Is the camera fully operational?
-
Have pictures been distributed for the previous 3 days?
-
Are the pictures free from obstructions (vegetation, rain)?
Discharge Extent
-
Discharge Extent
-
Has it rained in the previous 48 hours?
-
What are the coordinates of the discharge extent?
-
Include photos of discharge extent area
-
Is there recent evidence of non-native animals in the area?
-
Has the discharge model been revised in the last year?
-
Does the discharge model match the current discharge extent footprint?
Dewatering Network
-
Dewatering Network
-
Are generators bunded to prevent spills?
-
Is thre evidence of spills or leaks?
-
Are pipes free from obstruction with no obvious water scouring which may pose a risk to operations?
Facility Compliance
-
Was the facility operating as designed?
-
Required Actions
-
Required Actions
Action
Sign off
-
Area owner sign off
-
Environmental representative sign off
Dewatering Network
Environmental Management
-
Have all actions from the previous work area inspection been closed?
-
Have area inspections been completed?
-
Does the work area adequately manage stormwater?
-
Does the area have bunding?
-
Is the bunding in good condition, with the bund valve closed and locked?
-
Does the work area have sufficient, stocked spill kits?
-
Does the work area segregate and store waste correctly for final disposal?
Compliance Monitoring
-
Compliance Monitoring
-
Has water quality monitoring been completed as per relevant approvals?
-
Were there any exceedences in the last sample?
-
Was notification made and a resample taken if required?
Dewatering Network
Dewatering Network
-
Dewatering Network
-
Are pumps bunded to prevent spills?
-
Is the area free from spills or leaks?
-
Are pipes free from obstructions (vegetation, rubbish)?
-
Dewatering Network
-
Are pumps bunded to prevent spills?
-
Is the area free from spills or leaks?
-
Are pipes free from obstructions (vegetation, rubbish)?
Compliance
-
Is the area considered compliant with relevant approvals and regulations?
-
Are actions required to rectify issues in this audit?
-
Required Actions
Action