Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Water meter
-
Flow Rating of plumbing fixtures (toilets, shower, heads, faucets, urinals)
-
CFC/HCFC in chillers/condensing/air conditioners/refrigerators, etc.
-
Window glazing type.
-
Green Roof
-
Electrical Panel Spare Capacity
-
Number of Parking Spots in Surface and Underground
-
Description of end-of-trip facilities (lockers, bike storage, showers, #of bike parking)
-
Variable frequency drives on motors.
-
Master building automation systems in use? (Description/brand)
-
Energy Efficient Lighting (T12 or T8 fluorescent, incandescent or CFL, LED)
-
Lighting presence of sensor controls
-
Connection to Direct Energy System /Central heat or infrastructure in place to connect to Direct Energy System?