Information
-
Estate Name
-
Stage
-
Development Application No. SEngXXXXX/XX
-
Address
-
Surveillance Officer
- Mark Price
- James Gleeson
- Barry Kuriata
- Dinuka Pitipana
- Andrew Cashin
- Stan Brzezowski
- Brian McNamara
-
Consultant
-
Contractor
CONSTRUCTION PLANS
-
Insert Approved Engineering Plans
-
Insert Approved EMP
-
Notes regarding the subdivision
COMMENCEMENT OF WORKS ON SITE
-
1. Pre-Construction Meeting
-
Nominated Contractor Site Supervisor & Contact Number
-
Date inspected
-
2. Commencement of Earthworks
-
Approved Environmental Management Plan implements and to satisfaction?
-
Date Inspected
EARTHWORKS
-
3. Placing of Fill on Roads and/or Lots
-
Inspection/Test results to be submitted prior to approval to proceed to next activity
-
Stripped areas inspected & to satisfaction?
-
Date inspected
DRAINAGE
-
9. Subsoil Drainage
-
Bedding - 7mm or 10mm single sized aggregate filter material 300mm of depth
Note: in wet areas single coarse 10mm aggregate used to drain easily
Subsoil line Inspection
-
Is the pipe enclosed in a seamless tubular geotextile filter fabric?
-
Flush points provided?<br>At max intervals of 80m
-
Backfill trench to subgrade level?
-
Satisfactory?
-
Date inspected
-
10. Drainage Pits
Drainage Pit Inspection
-
Location of pits consistent with approved plans?
-
No poor joints, damage, unsealed lifting holes?
-
Are floors rendered and self flushing?
-
Are subsurface drains present?
-
Satisfactory?
-
Date inspected
-
11. Stormwater Pipelines
-
Bedding - 7mm Quarry blend, 100mm thick, compaction 70
Note: in wet areas single coarse 10mm aggregate used to drain easily
Pipeline Inspection
-
Pipeline trench widths comply?
-
Location of pipeline consistent with approved plans?
-
Adequate trench wall clearance from pipe to wall?<br>minimum 150mm
-
No poor joints, damage, unsealed lifting holes?
-
Backfill to finished Subgrade level?
-
Satisfactory?
-
Date inspected
ROAD CONSTRUCTION
-
Stabilisation Required?
- Yes
- No
- N/A
-
Treatment Required?
-
4. Road Subgrade
-
Subgrade replacement - to be approved.
Road Subgrade Inspection
-
Compaction Density Geotechnical test result submitted?<br>100% standard 95% modified
-
Proof roll - no sign of deflections?<br>Single axle loaded water truck or similar (min 8 tonne loaded over the rear axle)
-
Date inspected
-
Satisfactory?
-
Material that has become degraded, segregated or otherwise reduced in quality by reworking shall be rejected. Clayey and soft areas to rejected. Rejected material shall be removed, disposed of and replaced with fresh material approved by Council. Subgrade replacement - Granular material max 50mm aggregate
-
5. Road Subbase
Road Subbase Inspection
-
Compaction density & material grading geotechnical test result submitted?<br>100% standard 95% modified
-
Proof roll - no sign of deflections?<br>Single axle loaded water truck or similar (min 8 tonne loaded over the rear axle)
-
Thickness checked
-
Date inspected
-
Satisfactory?
-
Material that has become degraded, segregated or otherwise reduced in quality by reworking shall be rejected. Rejected material shall be removed, disposed of and replaced with fresh material approved by Council.
-
6. Kerb & Gutter
-
Concrete to be minimum 20 MPA
Kerb & Gutter Inspection
-
Does Subbase extend 150mm behind kerb or as specified on plans?
-
Is there adequate fall to inlet pits?<br>min 0.5% grade
-
Are services conduit locations adequately stamped and marked on the kerb?
-
Satisfactory?
-
Date inspected
-
7. Base
Base Inspection
-
Proof roll - no sign of deflections?<br>Single axle loaded water truck or similar (min 8 tonne loaded over the rear axle)
-
Compaction density & material grading geotechnical test result submitted?<br>98% Modified
-
Thickness checked?
-
Date inspected
-
Satisfactory?
-
Material that has become degraded, segregated or otherwise reduced in quality by reworking shall be rejected. Rejected material shall be removed, disposed of and replaced with fresh material approved by Council.
-
8. Asphalt Layers
-
Check approved plans for thickness
Asphalt layer Inspection
-
Which Asphalt Layer?
-
Has the base at this location been approved?
-
Has tack coat gone down?
-
Satisfactory?
-
Date inspected
MISCELLANEOUS ADHOC INSPECTION
-
15. Miscellaneous Inspection
Miscellaneous Inspection
-
EMP Controls Satisfactory?
-
TMP Controls Satisfactory?
-
Inspection notes
-
Inspection Photos
-
Satisfactory?
-
Enter corrective action to be taken
-
Inspection Conducted by?
- Mark Price
- James Gleeson
- Barry Kuriata
- Dinuka Pitipana
- Andrew Cashin
- Stan Brzezowski
- Brian McNamara
-
Date inspected
PRACTICAL COMPLETION INSPECTION
-
16. Practical Completion Construction Inspections
-
Construction complies with approved plans?
-
Shape and Grade in accordance with approved plans?
-
Are all roads and kerb & gutter in satisfactory condition?
-
CCTV of all stormwater pipelines satisfactory?
-
All drainage infrastructure in satisfactory condition?
-
All areas levelled and stabilised?
-
Lot Pegs Installed?
-
Surplus Material and Rubbish Removed?
-
Signage Installed
-
Linemarking Installed
-
Council Infrastructure left in satisfactory condition?
-
Satisfactory?
-
Please issue Practical Completion certificate.
-
Inspection Attended by?
- Mark Price
- James Gleeson
- Barry Kuriata
- Dinuka Pitipana
- Andrew Cashin
- Stan Brzezowski
- Brian McNamara
-
Date inspection
DEFECTS LIABILTY
-
17. Defects Liability periods
-
Details to be added
Defect Liability
-
Period
-
Have you set an outlook reminder to follow up 3 weeks prior to end of period
Signature
-
Add signature
-
Date completed