SUBDIVISION LOCATION DETAILS

  • Development Application No.

  • Development Proposal

  • Lot

  • DP

  • Assessment Officer

  • Assessment Date

  • Signing Officer

1. PRELIMINARY

  • DA approval

  • Date of Approval

  • Are there any S96 amendments?

  • Part

  • Part approval date

  • 1.1 Check Construction Certificate (CC) fees paid and correct

  • 1.2 Check hard copy plans (Engineering plans in A1) and any other required documents are provided

  • 1.3 Check electronic copy of "DRAINS" drainage design is provided

  • 1.4 Check all application documents and fees paid are registered in ECM & Authority

  • 1.5 Check if there are any other current DA's that relate to same site

  • 1.6 Access relevant Council Development Control Plan (DCP) that the DA must comply with

  • 1.7 Review hard copy of DA (including plans) & identify all items in DA relevant to CC application

2. LAYOUT PLANS

  • 2.1 Layout and boundaries of road reserves, pathways, public reserves, lots and easements

  • 2.2 Existing contours and final surface contours to be shown

  • 2.3 Extent and depth of cut and fill to comply with DA approved plan

  • 2.4 Grade, batters and cuts to be provided & to comply with DA approved plan

  • 2.5 Details of retaining walls to be provided & comply with DA approved plan

  • 2.6 Existing natural features such as cliffs, watercourses, swamps, dams, clusters of trees with diameter of 0.2 or greater

  • 2.7 Any environmental, historical or sites of aboriginal significance to be shown on plan

  • 2.8 Any improvements on the land

  • 2.9 Limit of works including cuts and fills

  • 2.10 Road chainages and widths of footpath & carriageway, control points, bench marks, datum & ties to existing boundaries

  • 2.11 Kerb & Gutter alignment, profile, footpath & pedestrian ramp locations

  • 2.12 Location of subsoil drains

  • 2.13 Existing and proposed drainage lines and structures suitably identified & diameter indicated

  • 2.14 Notation regarding provision of guide posts and guard rails

  • 2.15 Road centreline bearings, centreline, kerb return & cul-de-sac radii

  • 2.16 Tangent points to horizontal curves & kerb returns

  • 2.17 Large vehicle turning paths in critical areas

  • 2.18 Location of existing & proposed service mains

  • 2.19 Pavement details & design including structural design for flexible pavement, concrete pavement & segmental pavement

  • 2.20 Earthworks, Batters, Cuts & Retaining Walls. Detailed plans and sections may be required

  • 2.21 Sediment & Erosion Control Plan

  • 2.22 Street furniture, street names signs, traffic management plan

  • 2.23 Scale not less than 1:500

3. ROAD LONGITUDINAL SECTIONS

  • 3.1 Longitudinal sections are required on all new roads & on existing roads where part width construction is required

  • 3.2 New road longsections shall extend 45 metres into existing roads

  • 3.3 Road centreline chainage

  • 3.4 Tangent points, kerb return tangent points & intersection points

  • 3.5 Existing & finished surface

  • 3.6 Existing & finished levels including footpaths in cul-d-sac

  • 3.7 Existing culverts, sewer, water, gas, electricity

  • 3.8 Grades, vertical curves, high points & low points

  • 3.9 Limit of work to be shown on plans

  • 3.10 Scales shall not be less than 1:500 H & 1:100 V

4. ROAD CROSS SECTIONS

  • 4.1 Cross sections shall be provided at a maximum of 15 metre intervals, tangent points and other critical locations.

  • 4.2 Cross section shall extend a minimum of 5 metres beyond road reserve boundaries

  • 4.3 Cross section scale shall be not less than 1:200

  • 4.4 Details to be shown on cross sections:<br>• Chainage & offsets<br>• Existing & finished surface <br>• Existing Finished surface levels<br>• Cross sections at Kerb Return TP's, half width sections at IPs shall be shown<br>

5. KERB RETURN DETAIL PLANS

  • 5.1 Kerb return detail plans shall be provided for all intersections & cul-de-sac

  • 5.2 Plans shall be at a scale of not less than 1:200

  • 5.3 Details to be shown on kerb return plan:<br>• kerb return layout plan<br>• Finished pavement surface contours<br>• Drainage details<br>• Lot numbers of adjacent lots<br>

6. KERB RETURN LONGITUDINAL SECTIONS

  • 6.1 Shall be provided for all intersections & cul-de-sacs

  • 6.2 Low point shall be beyond the TP of the kerb return

  • 6.3 Long section shall extend minimum of 5m beyond TP's

  • 6.4 Sections shall be presented at a scale of 1:200 H & 1:50 V

  • 6.5 Details to be shown on KR longsection:<br>• Kerb chainage<br>• Finished surface<br>• Finished levels<br>• Low Point<br>• High points<br>• Vertical curve details<br>

7. DRAINAGE LONGITUDINAL SECTIONS

  • 7.1 Shall be provided for all drainage lines including interalotment lines

  • 7.2 Scale shall be 1:500 H & 1: 100 V

  • 7.3 The following details required:<br>• Chainage<br>• Existing & finished levels<br>• Existing & finished surface levels at each pit/headwall & at 15m max intervals<br>• Pipe invert at each pit/headwall<br>• Drainage structures<br>• Pipe grade, design discharge, velocities, pipe class & pipe bedding details<br>• Hydraulic Grade Line<br>• Service locations<br>

8. CATCHMENT PLAN

  • 8.1 Scale not less than 1:1000

  • 8.2 The following details required:<br>• Layout & boundaries of road reserves, pathways, public reserves, lots & easements<br>• Existing & proposed drainage lines, both major & minor routes including interalotment drainage lines<br>• Catchment & subcatchment limits with contributing area in hectares.<br>• Final surface contours<br>• Crests & Sags in roads<br>• Existing watercourses<br>• Adjacent contributing catchments with contributing area in hectares<br>• Limit of inundation by the 1 in 100 year Average Recurrence Interval Flood<br>

9. Erosion & Sediment Control Plan

  • 9.1 Scale not less than 1:1000

  • 9.2 Plan shall be approved by DECCW prior to being lodged with council

  • 9.3 The following details required:<br>• Layout & boundaries of road reserves, pathways, public reserves, lots & easements<br>• Existing contours & final surface contours<br>• Location of existing vegetation & proposed vegetated buffer strips<br>• Location of critical areas (vegetated buffer strips, drainage lines, water bodies, unstable slopes, flood plains & seasonal wet areas)<br>• Diversion of uncontaminated runoff around areas to be disturbed <br>• The nature & extent of proposed earthworks, including areas of cut & fill.<br>• Location of erosion & sediment control structures. Specification for maintenance of control works<br>• Details for disposal of intercepted sediment<br>• Rehabilitation proposals<br>• Dust control measures<br>

10. ROAD DESIGN CONTROLS

  • 10.1 Footpath Crossfalls<br>• Standard 4%<br>• Maximum 6%<br>• Minimum 2%<br>• Overland Flow -1%<br>

  • 10.2 Road Pavement Crossfall<br>• Standard 3%.<br>• Maximum 6%.<br>• Minimum 2%<br>

  • 10.3 Max Grade for 6m & 11m roads shall be 16%. Grades up to 20% can be considered

  • 10.4 Max Grade for > 11m roads shall be 10%

  • 10.5 Min Grade for any road 0.5%

  • 10.6 Lengths of roads at limiting grades to be kept at minimum

  • 10.7 Cul-de-sac crossfall min 1.5% max 8%

  • 10.8 Maximum batter slope not to exceed 4%

  • 10.9 Minimum Kerb Return radius 7.5m

  • 10.10 Minimum cul-de-sac radius 10.5m

  • 10.11 Minimum centreline radius 30m

  • 10.12 Sight distance at intersections to comply with AUSTROADS "Guide to Road Design"

  • 10.13 Lengths of vertical curves shall be determined AUSTROADS "Guide to Road Design"

  • 10.14 Minimum length of vertical curve at intersection of minor road with the through road shall be 8m

  • 10.15 Minimum angle of intersections shall be 70 degrees

  • 10.16 At intersections the minor road shall be graded to conform with the levels of the gutterline of the through road

11. DRAINAGE

  • 11.1 Estimation of discharge shall be by a method detailed in "Australian Rainfall & Runoff"

  • 11.2 "Drains" program to be used for modelling

  • 11.3 Design average recurrence:-<br><br>Roadway, accessway <br>Minor - 1 in 10<br>Major - 1 on 100<br>Relief of low point through private property. Allow for blockages<br>Minor - 1 in 100<br>Major - 1 in 100<br>Relief of low point through public open space<br>Minor - 1 in 10<br>Major - 1 in 100<br>Dual use Floodway (passive open space)<br>Minor - 25% of 1 year flow<br>Major - 1 in 100<br>Detention basins (passive open space)<br>Minor - 25% of 1 year flow<br>Major - 1 in 100<br>Spillway to allow for PMF<br>Dual use Detention Basins (Active open space)<br>Minor - 1 in 1<br>Major - 1 in 100<br>Spillway to allow for PMF<br>Subsoil drainage to be installed<br>

12. DRAINAGE DESIGN CONSTRAINTS

  • 12.1 Maximum width of flow in gutter is 2.45m

  • 12.2 Depth in gutter not to exceed 200mm for 1 in 100 event

  • 12.3 Bypass flow at pit not to exceed 20%

  • 12.4 Minimum pipe size draining public areas 375mm diameter

  • 12.5 Min Inter-allotment drainage line is 150mm diameter, 400mm deep

  • 12.6 Maximum water level in pit shall be 150mm below gutter invert

  • 12.7 Maximum spacing of pits is 100m

  • 12.8 Minimum velocity 0.6m/s Max velocity is 8m/s

  • 12.9 Velocity of flow outside of pipelines & designated floodways is 0.4m/s. Roadways.

  • 12.10 Ilsax model parameters <br>Soil type 3<br>AMC 3<br>Paved area depression storge 1mm<br>Pervious area depression storage 5mm<br>

  • 12.11 Impervious areas<br>Residential 45%<br>Road reserve 70%<br>Medium Density Res 80%<br>Commercial 100%<br>Industrial 100%<br>Public Rec 25%<br>

  • 12.12 Inlet lengths<br>Nominal 1.8<br>2.4 & 3.00 acceptable <br>

  • 12.13 Pipes & culverts to be designed using Hydraulic grade line method

  • 12.14 Pipe Friction Losses<br>Spun concrete 0.3<br>Fibre reinforced cement 0.06<br>uPVC 0.06<br>

  • 12.15 Pit Head Losses<br>As per recommendations in Code<br>

13. TRUNK DRAINAGE SYSTEM

  • 13.1 Velocity depth product shall not exceed 1m/s

  • 13.2 Max velocity in grass lined channels not to exceed 2m/s

  • 13.3 Max velocity in hard lined channels 6m/s

  • 13.4 Max batter slopes in channels 1 in 6

  • 13.4 Floodways signposted

  • 13.5 Fencing

  • 13.6 Indentify GPT requirements

14. ROADWORKS

  • 14.1 Discharge not to exceed pre-developed discharge

  • 14.2 No increase in flooding downstream

  • 14.3 Embankment have freeboard 500mm above 1 in 100

  • 14.4 Spillway to safely pass the PMF

  • 14.5 Batters not to exceed 1 in 6

  • 14.6 Outlet requirements to be discussed with council

  • 14.7 Floor to be free flowing & not waterlog

  • 14.8 If pond fits into dam category it will need NSW Dam Safety approval

15. ROADWORKS

  • 15.1 Pavement to be designed by geotech & be based on road hierarchy

  • 15.2 Subgrade or subgrade replacement shall be compacted to 100% standard or 95% modified

  • 15.3 Subsoil drains to be placed on topside of carriageway or elsewhere as required. Obvert of subsoil to be 150mm below finished subgrade level

  • 15.4 Subbase to extend 150mm outside back of kerb & be compacted to 95% modified

  • 15.5 Basecourse to be compacted to 98% modified

  • 15.6 Wearing surface to be either 2 X 20mm AC7 or 1 x 40mm AC10.<br>Roundabout to be special polybuilt roundabout mix <br>

16. KERB & GUTTER

  • 16.1 Kerb to be either Roll Kerb or Barrier Kerb depending on DA consent

  • 16.2 Concrete for K & G be 20Mpa special mix

  • 16.3 Metal kerb outlet for each lot where lot drains to street

  • 16.4 Expansion joint every 9m tool joint every 3m

17 STORMWATER STRUCTURES

  • 17.1 Pipes to be either reinforced concrete or fibre reinforced cement with rubber ring joints. Class of pipe determined by cover

  • 17.2 Inter-alotment drainage can be Sewer grade uPVC pipes

  • 17.3 All stormwater mains to be CCTV at completion

  • 17.4 "Bird mouth" pit entries not permitted

  • 17.5 Pits > 0.9 to have steps

  • 17.6 Pits > 1.8 deep require reinforcing designed by structural engineer

  • 17.7 Pits to be rendered and self flushing

  • 17.8 Lintel inlets only at sag or low spots

18. GRASSING

  • 18.1 Areas to be grassed or turfed to be ripped along the contour then 100mm topsoil placed the grassed or turfed

  • 18.2 Developer to maintain grassed areas during defects liability period

19. MANDATORY NOTES

  • 19.1 Service conduits to be installed prior to any pavement material

  • 19.2 Inspections to be arranged in accordance with code

  • 19.3 Bonds/Guarantees can be arranged for incomplete work eg asphalt, footpaths, landscaping, minor corrections

  • 19.4 Developer to maintain site during defects Liability period which is for 6 months or until developer satisfactorily completes all work

20. APPROVAL

  • Satisfactory?

  • Signature

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.