Information
-
Address or Subdivision & Stage
-
DA Number
-
Prepared by
- Nathan McBriarty
- Phil Thompson
- Bernie Boland
- Ron Brear
- Joel Harris
- Luke Preston
- Bryce Short
APPLICATION & PROPERTY LOCATION DETAILS
-
Development Application No.
-
Development Proposal
-
Lot
-
DP
-
Property Address
-
Assessment Officer
- Nathan McBriarty
- Phil Thompson
- Bernie Boland
- Ron Brear
- Joel Harris
- Luke Preston
- Bryce Short
-
Assessment Date
-
Signing Officer
- Nathan McBriarty
- Phil Thompson
- Bernie Boland
- Ron Brear
- Joel Harris
- Luke Preston
- Bryce Short
1. APPLICATION
-
1.1 Subdivision Certificate Application received and satisfactory?
2. FEES/BONDS
-
2.1 Application fees paid?
-
2.2 Landscape bonds and fees paid?
-
2.3 S94 contribution bonds paid?
-
2.4 Have other required fees been paid?
3. CERTIFICATES
-
3.1 Have the following certificates been submitted?
-
3.1.1 Occupation Certificate
-
3.1.2 Endeavour <br>
-
3.1.3 Communications
-
3.1.4 Water (S73 certificate)
-
3.1.5 Gas
4. PLANS
-
4.1 Have Works as Executed Plans been lodged?<br>
-
4.2 Have appropriate plans been submitted?<br>4x final approved plan
-
4.3 Is there a place for Council to sign?
-
4.4 Do the plans agree with the conditions of consent?
5. 88B INSTRUMENT
-
5.1 Has an 88B been submitted?<br>3x copies
-
5.2 Does the 88B agree with the linen plan?
-
5.3 Is there a place for Council to sign?
6. SITE INSPECTION DETAILS
-
6.1 Is Council reserve left in satisfactory condition?
-
6.2 Is drainage infrastructure as per Works as Executed plan and aligned with initial conditions of consent?
-
6.3 Are components of the development located within the property boundary?
-
6.4 Do driveway grades comply?
-
6.5 Other Site Comments?
-
Site Photos
-
Date inspected
7. CONDITIONS OF CONSENT
-
7.1 Have all conditions of consent been met?<br><br>Note: items to be checked onsite, check correct Works As Executed plan is in compliance with consent.
8. DEFECTS LIABILITY
-
Defects Liability Periods
Defect Liability
-
Type of defect liability
-
Period
-
End date
-
Have you set an outlook reminder to follow up 6 weeks prior to end of period?
Signature
-
Add signature
-
Date finalised