Title Page

  • Conducted on

  • Units Plan Number

  • Units Plan Name

  • Prepared by

Checklist

  • After completing each fire door checklist, Click "Add Fire Door" to add the next door. Ensure all doors are inspected

  • Add Fire Door
  • Location

  • Fire Contractor Asset ID Number

  • Certification Tag is installed on door

  • Certification Tag is installed on Frame

Operational test

  • The Door opens freely

  • The door self closes completely without delay

  • The door does not slam shut

  • The door is free of damage

  • Overall condition of door

Completion

  • Once report is completed, it is to be published as a PDF and saved to the Units plan Folder on the server under Service Reports

  • Full name and signature of inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.