Title Page
-
Audit Title
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre-work checks and inspections
-
Photographic evidence of identity.
-
Did the candidate select the correct PPE and confirm its condition suitable for use?
-
Did the candidate select the correct tools for the assessment?
Meter board installation
-
Was the meter board secured level and secure?
-
Was the cut-out secured to the meter board within the dimensions given?
Single phase cut-out termination PME.
-
Service cable stripped to correct length?
-
We're all terminations tightened sufficiently and the conductor terminated correctly?
-
Was the neutral arranged neatly to allow correct seating of the cut-out chamber and terminated correctly?
-
Was the service termination PME link fitted?
-
Photo of completed cut-out
-
Photo of non compliance.
3 Phase cut-termination non PME
-
3 phase Service cable stripped to correct length?
-
Live core stripped to correct length of 30mm?
-
We're all terminations tightened sufficiently and the conductor terminated correctly?
-
Was the neutral arranged neatly to allow correct seating of the cut-out chamber and terminated correctly?
-
Was the earth arranged neatly to allow correct seating of the cut-out chamber and terminated correctly?
-
Was the service termination PME link omitted?
-
Photo of completed cut-out
-
Photo of non compliance.
Audit completion
-
Auditors signature
-
Auditors comments
-
Candidates signature.
-
Candidates comments.
-
Photograph of installed meter board