Title Page
-
Audit Title
-
Conducted on
-
Prepared by
-
Location
Live line task and site conditions
-
Live Line task to be carried out.
-
Site conditions
-
Weather conditions and forecast?
-
Have all risks been identified and controlled?
-
Access and egress
-
Record lightning risk.
Instructions and Plans
-
Is there a current copy of the ENWL DSR's on site and available?
-
Are the relevant codes of practice on site and available?
-
Are adequate plans onsite and available?
-
Is the job instruction correct and available on site?
-
Is the extent of the work clear to all members of the team?
-
Has the control engineer been notified prior to the job commencing?
-
Has a switching schedule been prepared and adhered to?
-
Has the auto-reclose function been set to non-auto?
-
Has the job plan and sequence been agreed and signed by all team members?
Personel
Team members
-
Name
-
Authorisation to perform HV Live Line work in date
-
Date authorisation expires?
-
Team role?
-
Correct PPE available and worn?
-
Gloves and sleeves checked for correct class ,condition and in test date
-
Gloves and sleeves in test until?
-
Harness and safety lanyard checked in good condition and in date?
-
Next inspection due?
IAD
IAD inspections and setup
-
Is the IAD within test with certificate available?
-
Date of IAD Voltage withstand test?
-
Do the operators hold a current MEWP certification?
-
Was the IAD setup correctly and the vehicle check sheet completed?
-
Was the IAD earthed effectively?
-
MEWP rescue kit available in date and in good condition?
INSULATION
-
Are all line hoses of the correct class,clean, in test date and stored correctly?
-
Are all insulating blankets of the correct class,clean,in test date and stored correctly?
-
Test date for blankets and line hoses?
-
Are by-pass jumpers clean ,in good condition and within test date?
-
By-pass jumper test date?
-
Are all FRP rods clean stored correctly and in test date?
-
FRP rods test date?
Hydraulic hoses and tools
-
All hydraulic tools clean and in good condition?
-
All hydraulic hoses clean and in good condition?
-
Operator familiar with the equipment?
Task sequence and procedures
Task method and completion
-
Task carried out as agreed on the onsite job plan?
-
Adjacent structures checked?
-
Any changes to job plan agreed and changed as applicable?
-
Communication between team members
-
All secondary points of contact insulated sufficiently ?
Job completion
-
Job completed as per job instruction and ENWL codes of practice?
-
Control engineer informed job has been completed?
-
Switching schedule to be carried out and circuit set to auto?
Auditor comments
Post job site conditions
-
Finished task
AUDITOR AND TEAM COMMENTS
-
Auditor comments
-
Auditor signature.
-
Live line team agrees or disagrees with audit findings?
-
Live line team member name
-
Live Line team member signature