Audit Information

  • Region / FSC

  • On-site leader

  • Location
  • Work to be completed

  • Conducted on

  • Auditor

Team Details

Worksite Team Members

    Worksite Team Members
  • Name

  • Service Number

  • Worksite Team Role

  • Authorisation in date?

  • Authorisation Number

Worksite

Work group & Set up

  • Overall photograph of task to be completed (pre- job commencing)

  • Live Line Manual available on site - Hard Copy or Electronic copy

  • Appropriate HV Live Work Procedure(s) identified for the work

  • Stick Procedure(s)

  • Glove & Barrier Procedure(s)

  • All team members authorised for procedure(s)

  • WHRA discussion completed and documented

  • Photograph/screenshot from IPad front & back of WHRA

  • HV Live Work Permit Correctly Completed?

  • Photograph front & back of HVLW Permit

  • Conductor tensions calculated before commencing work

  • Screenshot of calculations from IPad

  • Telephone / communication from worksite

Equipment

  • Insulated Live Line equipment in test (hardcovers sticks etc...)

  • Test date

  • Insulating mats in test date

  • Test date

  • General condition of equipment

  • Provision for suitable equipment storage

  • Preparation of Live Line equipment

Personal Protective Equipment (PPE)

  • Arc rated clothing - long pants & long sleeves worn & in acceptable condition

  • Safety footwear worn & in acceptable condition

  • Approved eye protection worn & in acceptable condition

  • Hard hat worn, in acceptable condition and in date

Insulating gloves & sleeves

  • Inspection and inflation test performed

  • Leather protector gloves in good condition

  • Live Line gloves and sleeves in test date

  • Test date

Harnesses and Lanyards

  • In serviceable condition, clean and dry

  • Within 10 year service life from date of manufacture

EWP

  • EWP

  • Elevated Work Platform
  • Cleanliness/Condition of boom and basket

  • Excess gear removed from basket

EWP set up

  • Position of EWP relative to job

  • Photograph of EWP positioning

  • Stability of EWP

  • EWP effectively earthed & earth lead in test / inspection date

  • Next test date of earth lead

  • Quality of machine operation & control

Testing

  • Insulation within test date

  • Test date

  • Photograph EWP testing record

  • All hydraulic tool hoses in good condition, non-conductive and test sticker clearly displayed. (Note if battery tools used only)

Borer / Erector

  • Borer/Erector

  • Borer / Erector
  • Endeavour Energy lifter borer/plant

  • Name and service number

  • Authorisation number

  • Contractor - lifter borer/plant

  • Company and name of plant operator

  • Contract plant operator authorisation number.

  • Date of authorisation

Vehicle equipment

  • Overall hydraulic system (leaking?)

  • All lifting equipment in good condition?

Safety

  • Borer / erector effectively earthed & earth lead in test / inspection date

  • Next test date of earth lead

  • Position of borer / erector relative to work

  • Photograph of borer/erector position

  • Operator dressed in compliant clothing

  • Quality of machine operation and control

  • Safe work practices being utilised

  • Photographs of borer/erector operation during job

  • Quality of communication between Operator & Plant Safety Observer

HVLW application

Procedures

  • Safety observer in good position and observing correctly

  • Safe working clearances being maintained

  • Temporary insulation erected and utilised correctly

  • Safe work practices utilised?

  • Photograph(s) of work in progress

  • General worksite supervision

Worksite Conduct

  • Communication between safety observer and work face

  • Work face communication and interaction

  • Attitude towards Live Line work

  • General quality of Live Line work

Audit completion

Follow up actions

  • Do any items need to be followed up as a result of this audit - if yes then complete action(s) below

  • Action

  • Action item
  • Responsible person

  • Follow up action

Audit rating

  • Overall comments from auditor

  • Overall rating of the audit

Completion

  • Auditor confirms the findings of the audit (sign)

  • Auditee endorsement: I am a representative of the work crew

  • Auditee comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.