Information
-
Audit no.
-
Work group
-
On-site leader
-
Task Description
-
Work Site
-
Location
-
Conducted on
-
Prepared by
General
Worksite Hazard and Risk Assessment (WHRA)
-
Auditor(s) inducted to the worksite
-
Worksite Coordinator name
-
Job description, date,location information etc. adequate
-
Safe Work Method Statements (SWMS) applicable to the work noted and available on site
-
All foreseeable hazards identified and appropriate control measures in place
-
All workers on site are signed on to a WHRA
-
Workers on site can identify the appointed Worksite Coordinator
-
Other work groups on site are identified on the WHRA
-
Take a picture of the front of the WHRA
-
Take a picture of the back of the WHRA
-
WHRA comments
Authorisations
-
Workers on site have a current Network Access Authorisation card
-
Workers have appropriate Authorisations for work being carried out (Functions and Company)
Personal Protective Equipment (PPE)
-
All workers wearing minimum PPE required by ESR, covering neck to wrist to ankle
Plant
-
Daily inspection completed
-
Insulated plant within electrical inspection date
-
Plant / vehicles in good condition
Electrical Task Requirements
-
High Voltage switching being undertaken
-
Disconnection & Reconnection (D&R) instruction on site
-
D&R number
-
Switching Officer Authorised for apparatus to be operated
-
Switching Officer name / NAAS ID
-
HV apparatus tested and proved de-energised
-
Tester proven before & after use
-
Isolation points secured with danger tags
-
HV apparatus earthed & short circuited immediately after being proven de-energised
-
Portable earthing apparatus in good condition and within test date
-
Earthing visible from the work site
-
Access Authority (AA) completed correctly and as per D&R
-
Take picture of the front of the AA
-
Take picture of the back of the AA
-
Switching Folder completed correctly
-
Take picture of the front of the Switching Folder
-
Take picture of the back of the Switching Folder
-
AA safe area correctly demarcated with yellow tape
-
De-energised High Voltage work being undertaken
-
Disconnection & Reconnection (D&R) instruction on site
-
D&R number
-
Isolation points secured with danger tags
-
Portable earthing apparatus in good condition and within test date
-
HV apparatus tested and proved de-energised, earthed & short circuited
-
Earthing visible from the work site
-
Access Authority (AA) completed correctly and as per D&R
-
AA holder appointed
-
AA Holder name / NAAS ID
-
All workers signed on to AA
-
Workers can identify the AA holder
-
Workers can identify:<br>- location of the isolation points<br>- location of the earths<br>- worksite extremities
-
Take picture of the front of the AA
-
Take picture of the back of the AA
-
Switching Folder completed correctly
-
Take picture of the front of the Switching Folder
-
Take picture of the back of the Switching Folder
-
AA safe area correctly demarcated with yellow tape
-
De-energised Low Voltage work being carried out
-
LV apparatus effectively isolated
-
LV apparatus proved de-energised correctly
-
Isolation points secured and danger tagged
-
LV personal protective bonds fitted to all circuits connected to customers
-
Inadvertent contact with energised adjacent apparatus being controlled
-
ATW completed correctly
-
All workers signed on to ATW
-
Take picture of the front of the ATW
-
Take picture of the back of the ATW
-
Live Low Voltage work being carried out
-
Insulated glove visual and air leak checks completed before use
-
Rescue kit checked and deployed
-
Insulated gloves and approved leather outer protective gloves being worn
-
Temporary insulating covers applied correctly and secured
-
Safety Observer appointed and keeping watch
-
Plant maintaining Safe Approach Distance and Safety Observer appointed
Other Requirements
-
Work at Height and Attached Climbing being undertaken
-
Pre-climbing pole / structure inspection completed
-
Height safety equipment inspected before use and in good condition
-
Pole top rescue kit checked and deployed
-
Ladder(s) correctly positioned, and secured top & bottom
-
All workers aloft wearing harness, and lanyard / pole strap connected at all times
-
Underground work being undertaken
-
Dial Before You Dig (DBYD) search plans on site
-
All known underground services located
-
Excavation near live cables carried out correctly by authorised operator and observer