Information

  • Audit no.

  • Work group

  • On-site leader

  • Task Description

  • Work Site

  • Location
  • Conducted on

  • Prepared by

General

Worksite Hazard and Risk Assessment (WHRA)

  • Auditor(s) inducted to the worksite

  • Worksite Coordinator name

  • Job description, date,location information etc. adequate

  • Safe Work Method Statements (SWMS) applicable to the work noted and available on site

  • All foreseeable hazards identified and appropriate control measures in place

  • All workers on site are signed on to a WHRA

  • Workers on site can identify the appointed Worksite Coordinator

  • Other work groups on site are identified on the WHRA

  • Take a picture of the front of the WHRA

  • Take a picture of the back of the WHRA

  • WHRA comments

  • Take a picture(s) of the worksite (if required)

Authorisations

  • Workers on site have a current Network Access Authorisation card

  • Workers have appropriate Authorisations for work being carried out (Functions and Company)

Personal Protective Equipment (PPE)

  • All workers wearing minimum PPE required by ESR, covering neck to wrist to ankle

Plant

  • Daily inspection completed

  • Insulated plant within electrical inspection date

  • Plant / vehicles in good condition

Electrical Task Requirements

  • High Voltage switching being undertaken

  • Disconnection & Reconnection (D&R) instruction on site

  • D&R number

  • Switching Officer Authorised for apparatus to be operated

  • Switching Officer name / NAAS ID

  • HV apparatus tested and proved de-energised

  • Tester proven before & after use

  • Isolation points secured with danger tags

  • HV apparatus earthed & short circuited immediately after being proven de-energised

  • Portable earthing apparatus in good condition and within test date

  • Earthing visible from the work site

  • Access Authority (AA) completed correctly and as per D&R

  • Take picture of the front of the AA

  • Take picture of the back of the AA

  • Switching Folder completed correctly

  • Take picture of the front of the Switching Folder

  • Take picture of the back of the Switching Folder

  • AA safe area correctly demarcated with yellow tape

  • Low Voltage switching being undertaken

  • Disconnection & Reconnection (D&R) / switching instruction on site

  • D&R number

  • Switching Officer Authorised for apparatus to be operated

  • Switching Officer name / NAAS ID

  • LV apparatus tested and proved de-energised

  • Tester proven before & after use

  • Isolation points secured with danger tags

  • LV Protective Bonds applied to circuits with customers connected

  • Approval To Work (ATW) completed correctly

  • Take picture of the front of the ATW

  • Take picture of the back of the ATW

  • System Operator informed of any paralleling activities

  • Voltage levels recorded / monitored throughout the day

  • De-energised High Voltage work being undertaken

  • Disconnection & Reconnection (D&R) instruction on site

  • D&R number

  • Isolation points secured with danger tags

  • Portable earthing apparatus in good condition and within test date

  • HV apparatus tested and proved de-energised, earthed & short circuited

  • Earthing visible from the work site

  • Access Authority (AA) completed correctly and as per D&R

  • AA holder appointed

  • AA Holder name / NAAS ID

  • All workers signed on to AA

  • Workers can identify the AA holder

  • Workers can identify:<br>- location of the isolation points<br>- location of the earths<br>- worksite extremities

  • Take picture of the front of the AA

  • Take picture of the back of the AA

  • Switching Folder completed correctly

  • Take picture of the front of the Switching Folder

  • Take picture of the back of the Switching Folder

  • AA safe area correctly demarcated with yellow tape

  • De-energised Low Voltage work being carried out

  • LV apparatus effectively isolated

  • LV apparatus proved de-energised correctly

  • Isolation points secured and danger tagged

  • LV personal protective bonds fitted to all circuits connected to customers

  • Inadvertent contact with energised adjacent apparatus being controlled

  • ATW completed correctly

  • All workers signed on to ATW

  • Take picture of the front of the ATW

  • Take picture of the back of the ATW

  • Work being carried out under Disconnected Apparatus conditions

  • Disconnection points visible and secure, adequate minimum clearance established

  • Disconnection points Warning Tagged

  • Mains Disconnection points short-circuited & earthed

  • Declaration of Disconnected Apparatus completed correctly & available on site

  • Declaration of Disconnected Apparatus issued by Authorised AA Holder

  • Live Low Voltage work being carried out

  • Insulated glove visual and air leak checks completed before use

  • Rescue kit checked and deployed

  • Insulated gloves and approved leather outer protective gloves being worn

  • Temporary insulating covers applied correctly and secured

  • Safety Observer appointed and keeping watch

  • Plant maintaining Safe Approach Distance and Safety Observer appointed

  • Service Polarity testing being carried out

  • Insulated gloves and approved leather outer protective gloves being worn

  • Test carried out for hazardous voltage on switchboard surround

  • Service fuse removed

  • MEN connection removed

  • Neutral identified using electrical test

  • Polarity confirmed using electrical test

  • Neutral integrity test completed (neutral link voltage check)

  • Test carried out for hazardous voltage on switchboard surround / installation metal components

Other Requirements

  • Work at Height and Attached Climbing being undertaken

  • Pre-climbing pole / structure inspection completed

  • Height safety equipment inspected before use and in good condition

  • Pole top rescue kit checked and deployed

  • Ladder(s) correctly positioned, level, and secured top & bottom (or footed)

  • All workers aloft wearing harness, and lanyard / pole strap connected at all times

  • Underground work being undertaken

  • Dial Before You Dig (DBYD) search plans on site

  • All known underground services located

  • Excavation near live cables carried out correctly by authorised operator and observer

  • Adequate control of earthing hazards, transferred earth potentials, etc.

  • Gas detector on site and used correctly

  • Trench battered or shored if required

  • Apprentices on site

  • Nominated supervisor identified

  • Apprentices identified with alternative coloured hard hat

  • Appropriate level of supervision understood for all apprentices on site, by supervisor(s) and apprentice(s)

Audit completion & rating

Follow up actions

  • Do any items need to be followed up as a result of this audit

  • Action

  • Action item
  • Responsible person

  • Follow up action

Audit rating

  • Overall rating of the audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.