Title Page
-
Conducted on
-
Prepared by
-
Location
-
Client
-
Job Ref
-
Description of section handed over:
-
Method of Tying:
-
Have the ties been tested?
-
The Scaffolding as described has now been completed in accordance with client requirements. It is structurally sound and should only be used and loaded in accordance with this Handover Certificate
-
Loading to be how many working lifts
-
Loaded at how many Kn/m2
-
Number of other working Lifts
-
Loaded at Kn/m2
-
Inside boards load Kn/m2
-
Have the detailed requirements of the Working at Height Regulations 2005 and any other relevant legislation been complied with
-
Has the scaffold been designed to take sheeting/ debris netting (or other windsails)
-
Signature on behalf of the Scaffold Contractor:
-
Signature or receipt on behalf of the client/contractor:
-
Has Email been sent
-
Email address handover has been sent to
-
Email address handover needs to be sent to
Photos:
-
Photos of job
-
Photos of Scafftag
-
Design/Drawing