Title Page

  • Conducted on

  • Prepared by

  • Location

  • Client

  • Job Ref

  • Description of section handed over:

  • Method of Tying:

  • Have the ties been tested?

  • The Scaffolding as described has now been completed in accordance with client requirements. It is structurally sound and should only be used and loaded in accordance with this Handover Certificate

  • Loading to be how many working lifts

  • Loaded at how many Kn/m2

  • Number of other working Lifts

  • Loaded at Kn/m2

  • Inside boards load Kn/m2

  • Have the detailed requirements of the Working at Height Regulations 2005 and any other relevant legislation been complied with

  • Has the scaffold been designed to take sheeting/ debris netting (or other windsails)

  • Signature on behalf of the Scaffold Contractor:

  • Signature or receipt on behalf of the client/contractor:

  • Has Email been sent

  • Email address handover has been sent to

  • Email address handover needs to be sent to

Photos:

  • Photos of job

  • Photos of Scafftag

  • Design/Drawing

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.