Title Page
-
Project Reference
-
Inspection date
-
Contractor
-
Project Client
-
Prepared by
-
Signed
-
Location
-
Site Manager
Inspection Analysis
Site Documentation
-
RAMS in place and cover all works
-
CPHSP in place, relevant and up to date
-
Permits to work in place and adhered to
-
F10 notified to the HSE and accurate
-
Workforce consultation
-
Visitors book maintained
-
H&S site rules relevant and displayed
-
EL Liability on display
Training
-
Skills cards
-
CPCS for plant operators
-
SHE inductions
-
Toolbox talks conducted
-
Other
Welfare & First Aid
-
Adequate toilets, clean and tidy with amenities
-
Areas of rest adequate, clean and tidy
-
Drying room and areas to change clothes
-
Access to drinking water and hot water for cleanliness
-
Means of heating food and boiling water
Hazardous Substances
-
Are COSHH assessments available
-
Are substances kept in original containers and clearly labelled
-
Are substances bunded where necessary
Excavations
-
Trench supports / stable and secure
-
Any nearby structures or materials which may dislodge and adjacent ground clear as to not overload
-
Prevention of workers or vehicles encroaching excavations
-
Vehicle stop blocks
-
Access / egress
-
Excavation inspections carried out
-
Cat scanner used
-
Service plan available and services marked out
Welfare
-
Adequate toilets, clean and tidy with amenities
-
Areas of rest adequate, clean and tidy
-
Drying room and areas to change clothes
-
Access to drinking water and hot water for cleanliness
-
Means of heating food and boiling water
PPE
-
Are operatives wearing the correct PPE
-
Is PPE in good condition
-
Is there areas for PPE to be stored
Traffic Management
-
Traffic management plan available and displayed
-
Vehicles and pedestrians separate
-
Crossings signed
-
Adequate parking arrangements
-
Elimination of reversing where possible
Plant & Machinery
-
ROPS / seat belts fitted and used
-
Mirrors and horns working
-
Flashing beacons and reversing sirens
-
Quick hitch on excavators
-
< 1 tonne lifting marked with SWL
-
Controls marked
-
360 visibility available
-
PPM arrangements in place
Public Security
-
Secure site via fencing and signage etc
-
Access to site secure
-
Protection from falling objects
-
Secure storage
-
Adequate warning signs
Lifting Operations
-
Lifting plan in place
-
Lift Supervisor
-
Trained banksman / slinger
-
6 & 12 month thorough examination inspections
-
General documentation
Work at Height - General
-
Stepladders justified / used correctly
-
Work at height avoided where possible
-
Fall arrest system
-
Working at height safely
-
Falling objects
Scaffolding Compliance
-
Edge protection in place
-
Guardrails / toeboards / brickguards
-
Scaffolding platforms
-
Bracing / ties
-
Scaffolding access
-
Loading platforms
-
Trestles used correctly
-
Tower scaffoldings used correctly
-
Handover & Inspections up to date
-
Scaff tag up to date
Excavator & Dumpers
-
Quick hitch
-
Mirrors
-
<1 tonne lifting within marked SWL
-
>1 tonne - ASLI & Lock valves
-
Controls marked
-
CPCS / equivalent competencies
-
FOPS used correctly
-
Flashing beacons
Fire Arrangements
-
Fire plan in place
-
Fire extinguishers in place
-
Escape routes marked
-
Training / fire procedures for fire awareness
-
Method of raising the alarm
-
Storage of flammables
-
Fire risk assessment relevant and available
-
Management of flammable waste
Noise Arrangements
-
Reduced at source
-
>80dbA - noise assessments
-
>85dbA - hearing protection mandatory
-
Hearing protection adhered to
Vibration Arrangements
-
Vibration levels identified for machines and equipment
-
Control measures identified and implemented
-
Exposure times logged
Electricity
-
Inspection and test records
-
110v used where possible
-
Distribution units closed / locked
-
Cables routes safely & marked
Confined Space Works
-
Permit to work
-
Suitable RAMS and procedures
-
Adequate and relevant training
-
Developed rescue plan and available equipment
MEWPs & Telehandlers
-
Operating areas firm and level
-
Seatbelts / harness used correctly
-
SWL exceeded
-
6 monthly thorough examination
-
Outriggers used on MEWPs where available
Demolition
-
Asbestos survey
-
Services disconnected
-
Drains inlet protected
-
Dust reduced
Housekeeping
-
Trip hazards / trailing cables
-
Floor openings
-
Manhole covers
-
Lighting - task / general
-
General tidying by operatives
Roadworks
-
Traffic management as Chapter 8
-
Safety zones correct & defined
-
Traffic management materials secured
-
Flashing beacons
-
Traffic lights - stop/go
-
Open highways permit
-
New road & street works supervisor
Manual Handling
-
Manual handling aids available
-
Manual handling assessments
-
Training
Temporary Works
-
Design and TW Register
-
Temporary works coordinator appointed
-
Inspections
-
Permits in place
-
Policy and procedures in place and adhered to
Asbestos Removal
-
Survey report available
-
Training and competencies relevant to removal works
-
Airtight enclosure / smoke test
-
Welfare facilities
-
Clearance certificate
Services (U/G & O/H)
-
Service plans displayed
-
Services marked on ground where identified
-
CAT scan / trial holes
-
Permit to dig
-
GS6 & HSG47 precautions
Miscellaneous
-
Weils disease
-
Precautions for working near water
-
Specific client rules / precautions
-
RPE - face fit tests
Waste Management
-
Waste segregation
-
Waste carriers license checked
-
Consignment notes collected and recorded
-
Hazardous substances identified
-
Site waste management
Environmental Water & Land
-
All fuel / chemical containers bunded
-
Drip trays available for re-fuelling
-
Spill kits available
-
Materials stored away from water courses
-
Washout areas for vehicles suitable
Miscellaneous
-
Dust suppression
-
Noise levels at perimeter
-
Working hours monitored
-
Mud on road
-
Environmental risk assessment
-
Protection of trees
-
Consents