Title Page

  • Site conducted

  • Conducted on

  • Region

  • Country

  • Project

  • Project Name

  • Project

  • Project

  • Project Name

Job Details

Requestor details

  • Company requesting permit

  • Name of person requesting permit

  • Location of works to be undertaken - (e.g Rig 49)

Permit details

  • Description of the work to be undertaken

  • Time and Date permit becomes active

  • Time and Date permit will become deactivated

  • Permit issued to

  • Special tools / Equipment required

  • Can the work be conducted at ground level

Training and Competency

  • Is the worker a trained and qualified dogman / rigger / crane operator?

  • Worker/s have completed a Verification of Competency (VoC) to undertake the task as a dogman / rigger / crane operator?

  • Worker/s hold current High Risk Work Licence (HRWL)?

PRIMARY HAZARDS

Risk Management

  • Is there a Lifting Procedure available?

  • Has a JSEA been completed?

  • Has the lifting zone been barricaded and sign posted to prevent unauthorised entry?

  • Wind conditions are safe and monitored during the lift?

  • Is there a designated spotter for the lifting activity?

  • Is there safe clearance between overhead structures/powerlines?

  • Prestart inspections completed for Cranes / Lifting Equipment?

  • Cranes and lifting equipment are fit for purpose?

  • All non-essential workers have been removed from lift area?

Lifting Equipment

  • Is rigging in good condition including shackles?

  • Is rigging and lifting equipment tagged within current tagging schedule?

  • Select appropriate tag colour

  • Slings are protected from sharp edges?

  • Has pre-lift study been undertaken?

  • Is a tag line in use?

  • Do ground conditions appear to be acceptable for crane set up?

  • Are outriggers fully extended?

AUTHORISATION & ACCEPTANCE - I confirm that I have verified the above information and ensured that the necessary precautions have been taken. It is safe to carry out the works as defined above and the permit has been explained to all workers involved. I accept responsibility for this work.

  • Person in Charge of Works

  • Company

  • Newcrest Representative

Permit Closure

  • Newcrest Representative

  • Date and Time Permit Closed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.