Title Page

  • Document No.

  • Principal Contractor

  • Client / Worksite Address
  • Authorised Officer / Reviewer

  • Conducted on

  • Client / Site

Administration Requirements / Documentation

  • Project Notification board displaying contact details in place

  • Contractor's Safety coordination arrangements are clearly established and well communicated

  • Copy of contractor's project Safety, Environmental Management Plan on site and accessible to all

  • Evidence of Site Diary

  • Contractor OH&S representative on site

  • Proof of Client Contractor Induction Pass available (check recent arrivals to site from site register, 'Site Labour Checklist')

  • Site specific induction completed (sample some new arrivals to the project)

  • Does the site induction inform new arrivals to the project site of known hazards

  • Workers on site have proof of construction industry induction (Sample some workers on site from site register, 'Site Labour Checklist' and verify by sighting records)

  • Is a copy of the Asbestos / Hazmat Register on site and accessible to all

  • SWMS used by contractors working on site now, readily available and accessible for review

Consultation & Issue Resolution

  • Records of toolbox talks

  • Records of daily pre-start walk-through completed

  • Elected HSR on site?

  • Records of consultation with HSR on OHS matters

  • Records of resolving OHS issues on site

First Aid Requirements

  • First Aid signage visible, names of First Aider(s) displayed with their contact numbers

  • Evidence of first aid training

  • First Aid kit in place (check contents expiry date)

Incident Management

  • Records of injuries (and treatment received) kept and available

  • Evidence of Accident / Incident Response Procedures on file

  • WorkSafe 'If you are injured at work' poster displayed

Emergency Procedures

  • Emergency procedures / plans in place and practiced

  • Emergency telephone numbers displayed clearly

  • Emergency exit signs displayed with all exits clear and un-obstructed

  • Evidence of Sign-in/out Register (to be used for roll call)

  • Fire extinguishers tested and tagged in the last 6 months and readily available

Public Safety

  • Site secured with permanent hoarding / temporary fencing to provide adequate separation between worksite and public

  • Is the public protected from dust, debris and danger

  • Noise controls adequate

  • Dust controls adequate

Amenities & Facilities

  • Sheltered area for meals maintained in a clean, tidy and serviceable condition

  • Portable (drinking) water available

  • Toilets and washing facilities available and maintained in a clean, tidy and serviceable condition

Housekeeping

  • Evidence of Housekeeping Reports

  • Access to and around site including stairwells to be clear and adequate width at all times

  • All sharp and protruding edges of any type is covered or capped

  • Adequate lighting whether natural or powered

  • Penetrations controlled by covering and / or barricading

  • Waste materials stored orderly and removed daily

Personal Protective Equipment

  • High visibility clothing

  • Safety boots or safety shoes

  • Hard hats

  • Hearing protection appropriate to the task

  • Eye protection appropriate to the task

  • Respiratory protection appropriate to the task

Plant, Machinery and Hand Power Tools

  • Effectively maintained in accordance with manufacturers specifications (check maintenance records incl. calibrations)

  • Daily pre-start log book completed

  • Operated by licensed and competent person(s)

  • Emergency stop devices fitted and used

  • Audible beepers and flashing lights working

  • Portable hand tools and machinery to have effective guards in place (where "designed-in")

  • Any defective plant and equipment reports, if applicable

  • Evidence of Site Plant Register

Electrical

  • Plug-in power tools and extension leads tested and tagged in last 3 months

  • Temporary power boards with a lockable cover over RCDs. RCDs tested monthly

  • Power leads off the ground and positioned to avoid being damaged

  • PSOA (Portable socket outlet assemblies) with RCD protection used to supply power tools at work location/s

  • Lock Out, Tag Out (LOTO) to be used on live switchboards

  • Power lines "No Go Zone" observed

  • Underground services "No Go Zone" observed

Manual Handling

  • Mechanical lifting and handling aids available where required

  • Work tasks set in manner to reduce/eliminate manual lifting and handling

  • Manual handling procedure corrrect

Hazardous Substances and Dangerous Goods

  • Does Asbestos Register indicate site is "free" of asbestos

  • If no, is there a plan for adequately identifying locations of known asbestos containing materials and informing project team members

  • Hazardous Substances Register in place

  • SDS's (Safety Data Sheets) available

  • Hazardous materials clearly labeled

  • Placarding / Signage displayed

  • SWMS and PPE for use with Hazardous Materials available

  • Spill kit available if required

  • Emergency evacuation procedures in place

  • MDF and Silica dust controls in place

Working at Heights

  • SWMS available for work at heights

  • Is WorkSafe guide 'Prevention of Falls-Ladders' displayed

  • Fall protection in place for falls over 2 metres

  • Lanyards / Harnesses tested and tagged and in good condition

  • Rescue procedures in place for harness work

  • Scaffold tagged and tested along with scaffold inspection records available

  • Ladders in good condition, secured and properly used and are rated Industrial strength at 120kgs

Hot Works

  • Hot Works Permit signed by Client Authorised Officer and in possession of persons involved in works

  • Hot Works SWMS sighted

  • Trained / competent operator

  • Fire / explosion control measures in place

  • Gas bottles secured and flashback arrester / non return valves in place

  • Area properly ventilated

  • Welding / spark screens in place if required

Sign Off to conclude Safety Audit

  • Principal Contractor acknowledges safety issues identified and documented on Safety Audit, are their responsibility

  • Safety issues documented in this Safety Audit remain open until the Principal Contractor confirms in writing they have been rectified

  • Principal Contractor's representative involved in Safety Audit

  • Principal Contractor's Authorised Officer conducting Safety Audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.