Title Page
-
Document No.
-
Principal Contractor
-
Client / Worksite Address
-
Authorised Officer / Reviewer
-
Conducted on
-
Client / Site
Administration Requirements / Documentation
-
Project Notification board displaying contact details in place
-
Contractor's Safety coordination arrangements are clearly established and well communicated
-
Copy of contractor's project Safety, Environmental Management Plan on site and accessible to all
-
Evidence of Site Diary
-
Contractor OH&S representative on site
-
Proof of Client Contractor Induction Pass available (check recent arrivals to site from site register, 'Site Labour Checklist')
-
Site specific induction completed (sample some new arrivals to the project)
-
Does the site induction inform new arrivals to the project site of known hazards
-
Workers on site have proof of construction industry induction (Sample some workers on site from site register, 'Site Labour Checklist' and verify by sighting records)
-
Is a copy of the Asbestos / Hazmat Register on site and accessible to all
-
SWMS used by contractors working on site now, readily available and accessible for review
Consultation & Issue Resolution
-
Records of toolbox talks
-
Records of daily pre-start walk-through completed
-
Elected HSR on site?
-
Records of consultation with HSR on OHS matters
-
Records of resolving OHS issues on site
First Aid Requirements
-
First Aid signage visible, names of First Aider(s) displayed with their contact numbers
-
Evidence of first aid training
-
First Aid kit in place (check contents expiry date)
Incident Management
-
Records of injuries (and treatment received) kept and available
-
Evidence of Accident / Incident Response Procedures on file
-
WorkSafe 'If you are injured at work' poster displayed
Emergency Procedures
-
Emergency procedures / plans in place and practiced
-
Emergency telephone numbers displayed clearly
-
Emergency exit signs displayed with all exits clear and un-obstructed
-
Evidence of Sign-in/out Register (to be used for roll call)
-
Fire extinguishers tested and tagged in the last 6 months and readily available
Public Safety
-
Site secured with permanent hoarding / temporary fencing to provide adequate separation between worksite and public
-
Is the public protected from dust, debris and danger
-
Noise controls adequate
-
Dust controls adequate
Amenities & Facilities
-
Sheltered area for meals maintained in a clean, tidy and serviceable condition
-
Portable (drinking) water available
-
Toilets and washing facilities available and maintained in a clean, tidy and serviceable condition
Housekeeping
-
Evidence of Housekeeping Reports
-
Access to and around site including stairwells to be clear and adequate width at all times
-
All sharp and protruding edges of any type is covered or capped
-
Adequate lighting whether natural or powered
-
Penetrations controlled by covering and / or barricading
-
Waste materials stored orderly and removed daily
Personal Protective Equipment
-
High visibility clothing
-
Safety boots or safety shoes
-
Hard hats
-
Hearing protection appropriate to the task
-
Eye protection appropriate to the task
-
Respiratory protection appropriate to the task
Plant, Machinery and Hand Power Tools
-
Effectively maintained in accordance with manufacturers specifications (check maintenance records incl. calibrations)
-
Daily pre-start log book completed
-
Operated by licensed and competent person(s)
-
Emergency stop devices fitted and used
-
Audible beepers and flashing lights working
-
Portable hand tools and machinery to have effective guards in place (where "designed-in")
-
Any defective plant and equipment reports, if applicable
-
Evidence of Site Plant Register
Electrical
-
Plug-in power tools and extension leads tested and tagged in last 3 months
-
Temporary power boards with a lockable cover over RCDs. RCDs tested monthly
-
Power leads off the ground and positioned to avoid being damaged
-
PSOA (Portable socket outlet assemblies) with RCD protection used to supply power tools at work location/s
-
Lock Out, Tag Out (LOTO) to be used on live switchboards
-
Power lines "No Go Zone" observed
-
Underground services "No Go Zone" observed
Manual Handling
-
Mechanical lifting and handling aids available where required
-
Work tasks set in manner to reduce/eliminate manual lifting and handling
-
Manual handling procedure corrrect
Hazardous Substances and Dangerous Goods
-
Does Asbestos Register indicate site is "free" of asbestos
-
If no, is there a plan for adequately identifying locations of known asbestos containing materials and informing project team members
-
Hazardous Substances Register in place
-
SDS's (Safety Data Sheets) available
-
Hazardous materials clearly labeled
-
Placarding / Signage displayed
-
SWMS and PPE for use with Hazardous Materials available
-
Spill kit available if required
-
Emergency evacuation procedures in place
-
MDF and Silica dust controls in place
Working at Heights
-
SWMS available for work at heights
-
Is WorkSafe guide 'Prevention of Falls-Ladders' displayed
-
Fall protection in place for falls over 2 metres
-
Lanyards / Harnesses tested and tagged and in good condition
-
Rescue procedures in place for harness work
-
Scaffold tagged and tested along with scaffold inspection records available
-
Ladders in good condition, secured and properly used and are rated Industrial strength at 120kgs
Hot Works
-
Hot Works Permit signed by Client Authorised Officer and in possession of persons involved in works
-
Hot Works SWMS sighted
-
Trained / competent operator
-
Fire / explosion control measures in place
-
Gas bottles secured and flashback arrester / non return valves in place
-
Area properly ventilated
-
Welding / spark screens in place if required
Sign Off to conclude Safety Audit
-
Principal Contractor acknowledges safety issues identified and documented on Safety Audit, are their responsibility
-
Safety issues documented in this Safety Audit remain open until the Principal Contractor confirms in writing they have been rectified
-
Principal Contractor's representative involved in Safety Audit
-
Principal Contractor's Authorised Officer conducting Safety Audit