Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Site Safety

  • Sign-in Register has legible names

  • All contractors have been inducted

  • Contractors have completed qualification paperwork

  • Hazardous Substances Register and MSDS sheets at entrance

  • Hazard Board has current work hazards entered

  • Hazardous substances labelled and stored in appropriate cabinets

  • Work area is clean, safe and tidy while work is in progress (housekeeping)

  • Physical hazards have been fenced off<br>

  • Permit area is managed

  • Site is secure, doors to restricted areas are locked or under constant supervision

  • Appropriate PPE equipment is being used as and where required

  • Portable equipment is tested and tagged for current period

  • Emergency equipment is in place (fire extinguishers etc.)

Job Documentation

  • Contractors are adhering to their Safety Plan

  • Log Book has been filled in correctly if isolations are in place

  • Access/Test Permit has been completed correctly

  • Hot Work/Confined Space Permit has been completed correctly

  • All work party members have signed the Tailgate (or similar) and risks identified have been controlled

  • Permit Holder / Staff Competency certificates are valid

  • Job plan / instructions are on site relating to the specified maintenance / project

General comments and or observations

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.