  • 03.07. Is the scaffolding generally erected in accordance with AS 1576, AS 4576? <br>

  • 06.01. Is all excavation and trenching work associated with the site undertaken in accordance with the relevant legislation and/or applicable SWMS supplied by the PCBU involved? <br>

07.00 Demolition

  • 07.01. Has a competent person with the relevant qualifications and experience been appointed to supervise all the demolition work on site? <br>

  • 07.02. Is work being undertaken in accordance with submitted Demolition Safety Plan and SWMSs? <br>

  • 07.03. If a Structural Engineer has provided written advice to the demolition subcontractor on proposed demolition sequence and procedures, does the S/C hold a copy of this advice? <br>

  • 07.04. Are the "as constructed" or original design drawings for the structure being demolished and the Asbestos register held by the demolition PCBU? <br>

  • 07.05. Have all required written permits, approvals, and authorities been obtained? <br>

  • 07.06. Are control measures in place to ensure all existing services are disconnected? <br>

  • 07.07. Is all mobile plant fitted with Falling Objects Protective Structures (FOPS)? <br>

  • 07.08. Has an Engineer approved the use of mobile plant on any suspended slabs and other structures being demolished? <br>

  • 07.09. Has an inspection been carried out by a competent person to ensure all hazardous substances that are present are identified, e.g. asbestos, PCBs in capacitors etc. <br>

  • 07.10. If a hazardous substance has been found are control measures implemented? <br>

  • 07.11. Are appropriate warning signs in place? <br>

  • 07.12. Where structural supports are required have they been approved and documented by a competent person? <br>

  • 07.13. Are all required gantries, hoarding, fences, barricades in place? <br>

  • 07.14. Is adequate fire fighting mediums available on or reasonably near the site? <br>

08.00 Confined Space Work

  • 08.01. Has an assessment been carried out to identify all confined spaces on site and are they clearly marked at all entrances? <br>

  • 08.02. Has a written risk assessment been carried out for all work carried out in each confined space including review of alternative means of doing the work outside of the confined space? <br>

  • 08.03. Has a SWMS compliant with AS 2865 been developed for the work being carried out and has the SWMS been communicated to all persons involved in the confined space work? <br>

  • 08.04. Are all required control measures in place e.g., permit system, atmospheric monitoring, 1st aid, emergency procedures, training, PPE, stand by person, ventilation, communication system. <br>

09.00 Electrical Equipment and Wiring

  • 09.01. Is all portable electrical equipment connected to a Residual Current Device? <br>

  • 09.02. Is all electrical equipment inspected display a current electrical test tag? <br>

  • 09.03. Is the condition of the electrical equipment inspected acceptable? <br>

  • 09.04. Are any double adaptors or piggy backs systems being used on site? <br>

  • 09.05. Are electrical leads protected from physical damage and prevented from damage by liquids? <br>

  • 09.06. Are extension leads less than 25~30 metres in length? <br>

  • 09.07. Are sufficient temporary power boards available to prevent over extension of leads? <br>

  • 09.08. Were temporary boards constructed and used in accordance with AS 3012? <br>

  • 09.09. Are leads elevated where required to provide safe access? <br>

  • 09.10. Is all temporary wiring identified with yellow temporary construction wiring tape @ 5m centres or less? <br>

10.00 Tilt up and Precast Concrete Erection

  • 10.01. Is the MATRIX Tilt up checklist Form 15 being completed as required? <br>

  • 10.02. Are pre-pour inspection checklists completed and signed by tilt up PCBU foreman? <br>

  • 10.03. Are shop drawings done by a competent person provided for all panels and precast concrete? <br>

  • 10.04. Are documents on site specifying panel bracing, lifting insert, ferrules and connection fixings? <br>

  • 10.05. Are temporary bracing and/or propping installed as per design drawings or engineers requirements for panels and structure? <br>

  • 10.06. Are concrete test results available on site for erected panels & deadmen? <br>

  • 10.07. Is barricading erected to create an exclusion zone around the erected support systems? <br>

  • 10.08. Has an engineer's inspection certificate been issued prior to removal of temporary supports? <br>

  • 10.09. Are weekly monitoring checklists of support system & barriers completed by the PCBU? <br>

  • 10.10. Has a design been drawn for the deadman/screw anchors/rock anchors by an engineer? <br>

  • 10.11. Have the deadman/screw anchors/rock anchors been installed as per design drawings? <br>

  • 10.12. Has a detailed SWMS been provided by the PCBU for the erection process? <br>

  • 10.13. Has an exclusion zone been created to protect workers and members of the public? <br>

  • 10.14. Does panel erection crew have a suitably qualified Foreman? <br>

11.00 Plant and Equipment

  • 11.01. Is the plant used on site fit for the purpose that it is being used for? <br>

  • 11.02. Do all plant items have their required operator and maintenance logs present and are the logs completed correctly, at the required intervals and all issues raised controlled/closed out? <br>

  • 11.03. Are guards fitted to equipment where required and used properly? <br>

  • 11.04. Does heavy machinery and earth moving equipment have appropriate roll over protection? <br>

  • 11.05. Is permanent site based plant fitted with a flashing light where risk identifies the need? <br>

  • 11.06. Are motion alarms/reversing beepers fitted to mobile plant where risk identifies the need? <br>

  • 11.07. Are noise levels below acceptable standards? Has a Noise Map been generated to confirm this? <br>

  • 11.08. Is the safe working load and self weight displayed on lifting devices? <br>

  • 11.09. Are the appropriate slings used for lifting on site? <br>

  • 11.10. Are the slings in an acceptable condition and tagged with current test dates? <br>

  • 11.11. Are loads being slung correctly? <br>

12.00 Housekeeping

  • 12.01. Are bins located in suitable locations? Are they emptied regularly? <br>

  • 12.02. Is the area in front of water coolers, Power distribution boards, egress exits and fire extinguishers clear and unencumbered? <br>

  • 12.03. Are access ways kept clear of materials and debris? <br>

  • 12.04. Are manual handling issues adequately controlled when empting bins and barrows etc? <br>

  • 12.05. Are site sheds and amenities maintained in a clean condition? <br>

13.00 Manual Tasks

  • 13.01. Are materials stored/stacked appropriately? <br>

  • 13.02. Is access to stored materials acceptable? <br>

  • 13.03. Are mechanical lifting aids used where possible? <br>

  • 13.04. Are proper manual handling techniques being used, is the weight of items known? <br>

  • 13.05. Where possible is the work height designed to suit the task? <br>

  • 13.06. Is adequate work space available? <br>

14.00 Ladders

  • 14.01. Are ladders in an acceptable condition? <br>

  • 14.02. Is the SWL of 120kg or more displayed on the ladder, with an "INDUSTRIAL" rating clearly displayed? <br>

  • 14.03. Are ladders below maximum lengths specified in the relevant legislation? <br>

  • 14.04. Are 3 points of contact used for work from straight ladders? <br>

  • 14.05. Are ladders secured top or bottom with 1 metre projection above the landing? <br>

  • 14.06. Are ladders set up at an angle 4-1 ratio? <br>

  • 14.07. Are ladders set up on a firm level surface? <br>

  • 14.08. Are workers working below the 3rd top rung on a step ladder? <br>

15.00 Explosive Powered Tools

  • 15.01. Are EPT's piston activated only? <br>

  • 15.02. Is a logbook on site showing maintenance for EPT'S? <br>

  • 15.03. Have EPT operators undertaken training in EPT use & have relevant licence?<br>

16.00 Fire Fighting Equipment

  • 16.01. Is fire fighting equipment easily identified and located near fire escape exit locations throughout site? <br>

  • 16.02. Is access to fire fighting equipment clear and unobstructed? <br>

17.00 Temporary Barricading

  • 17.01. Is barricade erected where temporary restriction of access is required & is signage in place? <br>

18.00 Personnel Protective Equipment

  • 18.01. Are personnel wearing PPE as required? <br>

  • 18.02. Are standard items of PPE readily available and used? <br>

  • 18.03. Is the use of PPE enforced by management and supervision? <br>

  • 18.04. Is instruction in the need for PPE included in induction? <br>

19.00 Lighting

  • 19.01. Are general lighting levels acceptable on site? <br>

  • 19.02. Do temporary exit lights in access ways and fire stairs have battery back-up? <br>

  • 19.03. Do PCBUs have adequate task lighting to perform their scope of works? <br>

  • 19.04. Do portable lights have mechanical guards fitted? <br>

  • 19.05. Are emergency lights provided above all power boards? <br>

20.00 Public Protection and Falling Objects

  • 20.01. Are control measures in place for protection of the public and are they effective? <br>

  • 20.02. Are footpaths clean and unobstructed, fences/hoardings erected without gaps and handrails installed where required? <br>

  • 20.03. Are gantries are in place, are there gates, flashing lights and alarms installed and are they effectively used?<br>

  • 20.04. Is material stored below handrail height on gantries and loading bays? <br>

  • 20.05. Do site sheds have adequate protection over roofs where cranes are lifting materials overhead? <br>

  • 20.06. Are gaps in perimeter screens and scaffolding brick guards adjacent to public areas 25 mm or less (50 mm with shade cloth)? <br>

  • 20.07. Are exclusion zones being maintained where required? <br>

21.00 Hazardous Chemicals Use/Controls

  • 21.01. Are controls being implemented as per Site Risk Assessments and SWMS? <br>

  • 21.02. Are containers designed for chemical use? <br>

  • 21.03. Are containers adequately labeled? <br>

  • 21.04. Are storage, handling and training requirements being met? <br>

22.00 Hot Work Procedures

  • 22.01. Are flashback arrestors fitted to oxygen & acetylene equipment? <br>

  • 22.02. Are oxygen & acetylene bottles secured in an upright position? <br>

  • 22.03. Are service isolation procedures and permits in place where WHSMP/SWMS identifies the need? <br>

  • 22.03. Are appropriate fire fighting mediums nearby? <br>

  • 22.04 Where identified in SWMS or WHSMP's are hot work permits being used and maintained as per requirements? <br>

  • 22.05. Are screens in place, and control measures as per hot work requirements for welding? <br>

23.00 Service Identification and Isolation Procedures

  • 23.01. Have all underground services been identified and relevant PCBU's been advised of their location? <br>

  • 23.02. Is an Excavation Permit system in use for excavation work or any other work which may damage or otherwise interfere with existing underground services? <br>

24.00 Lasers

  • 24.01. Are the classes of lasers used on site less than a 3 B rating, i.e. class 1, 2 and 3A lasers? <br>

  • 24.02. If lasers class 2 or greater are used on site, has a laser safety officer been appointed? <br>

25.00 Traffic Control/Management (TMP)

  • 25.01. Is there a Traffic Management Plan in place where required? <br>

  • 25.02. Has the TMP been prepared in accordance with Manual for Uniform Traffic Control Devices & Code Of Practice for Traffic Management? <br>

  • 25.03. Is traffic control undertaken where required for work in public places? <br>

  • 25.04. Where a gantry is installed, are Traffic Controllers placed at either end to direct pedestrians if lifting operations are undertaken? <br>

  • 25.05. Do all Traffic Controllers used on site have the relevant qualification and kitted with the appropriate PPE? <br>

26.00 Noise Management

  • 26.01. Have control measures been implemented where noise over 85dBA is identified? [80dBA is recomended] <br>

27.00 Amenities

  • 27.01. Are there sufficient amenities for workers on site? <br>

  • 27.02. Dining accommodation supplied and clean? <br>

  • 27.03. Dressing accommodation supplied and clean? <br>

  • 27.04. Sanitary and washing facilities supplied and clean? <br>

  • 27.05. Cool drinking water available? <br>

28.00 UV Protection

  • 28.01. Are all Solar radiation/UV-exposed workers wearing shirts? <br>

  • 28.02. Is there an adequate supply of sunscreen readily available on site? <br>

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.