Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Untitled Page

  • Client

  • Principal Contractor / Contractor

  • Auditor

  • Audit Scope and Purpose

  • The audit scope is an assessment of construction activities and associated risk controls within a designated CDM area, to establish performance and compliance with Client and Legislative health and safety standards. The scope of this audit could align to both notifiable and non-notifiable works under The Construction (Design and Management) Regulations 2015

  • The audit comprises a workplace inspection, interview of site personnel (including sub-contract and Agency staff)

  • Site Activities Taking Place

  • Site Environment / Conditions at Time of Audit

Documentation

  • Health and Safety Induction

  • Individual competence

  • Construction Phase Plan

  • Risk Assessments and Method Statements

  • Permit to Work System

Hazardous Substances and Controls

  • COSHH Assessments

  • Safe storage and containment

Site operative competence

  • Observational review

  • Name and role

Signage

  • Statutory signage (Site Office)

  • Statutory signage (CDM Area)

Office and Welfare building

  • Fire provision, Extinguishers in date, assembly point

  • Health and Welfare facilities

  • Temporary Electrics and Portable Appliances

  • Fixed wiring

  • Waste Storage SWMP

High Risk Activities

  • Excavations

  • Below Ground Penetrations

  • Work At Height

  • Risk of Falling

  • Site Services And Infrastructure

  • Electrical / DSEAR

  • Confined Space Working

  • Work On Or Near Water

Site Management

  • Traffic Management

  • Implementation (setting out and control)

  • Documentation

  • Safe Access and Egress

  • Safe Place of Work

PPE and Safety Equipment

  • PPE worn (when mandatory) and in good condition

  • Safety Equipment Available (GDU, CAT & Genny, Fire extinguisher etc)

  • Fit for use and up to date with statutory examinations

Work Equipment and Plant

  • Sample Plant - Condition and Statutory inspection

  • Sample Work Equipment - Condition statutory inspection

LOLER

  • Lifting Operations suitably planned

  • Lifting Plant and Equipment

Manual Handling

  • Assessment and Control

Arrangements - Emergency and supervision

  • Supervision and Monitoring

  • Organisational Factors and Control

Working Environment

  • DSEAR

  • Noise and Vibration

  • Environmental Conditions ‘Moment in Time’

  • Weather / Visibility

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.