Title Page

  • Audit Title inc House and Street Names

  • Inspection Address

Section 1

Survey Details

  • Survey Completed by

  • Client

  • Property Address
  • Date of Survey

Details/Condition of the property

  • Property Type:

  • Description

  • Attachment

  • Number of elevations to be treated

  • Property Construction:

  • Please describe construction.

  • No of Storeys of building

  • No of Storeys in individual unit

  • Number of Bedrooms:

  • Agrees with Retro fit Assessment and Design

  • Approximate Year of Construction:

  • Conservation area status Established:

  • Planning permission status Established:

  • Building control status Established:

  • Does the wall have cavity insulation?

  • If no, has the cavity been sealed at the perimeter?

  • Need for fire separation of the compartments/Boundaries defined:

  • EEM Design: Accounts for the Building Regulation requirements for fire:

EEM DESIGN:

  • design accounts for building exposure:

  • Design accounts for loading in service e.g Impact:

  • Comments

  • Design eliminates thermal bridging:

  • Design minimises thermal bridging

Section 2

Existing Finishes: External/Internal

  • Agrees with Retro fit Assessment and Design

  • External Finishes

  • Please state other type of finish.

  • Internal: Colours & Textures

  • Other internal finishes please specify:

  • Comments:

Through Wall Construction

  • Internal to external surface layers

  • Overall Wall Thickness

  • Photo of wall thickness

  • Layer 1

  • Layer 2

  • Layer 3

  • Layer 4

  • Layer 5

  • Layer 6

  • Layer 7

  • Has a second through wall construction been identified ?

  • Overall Wall Thickness

  • Photo of wall thickness

  • Layer 1

  • Layer 2

  • Layer 3

  • Layer 4

  • Layer 5

  • Layer 6

  • Layer 7

  • Has a third through wall construction been identified ?

  • Overall Wall Thickness

  • Photo of wall thickness

  • Layer 1

  • Layer 2

  • Layer 3

  • Layer 4

  • Layer 5

  • Layer 6

  • Layer 7

Property Elevation Photos

  • Which Elevations exist on this property

  • Photos

Property Measurements:

  • Property Sketch Photos with Measures

Section 3

Enabling

  • Satellite Dish works (qty)

  • TV Ariel (qty)

  • External Lights (qty)

  • Alarms (qty)

  • CCTV (qty)

  • Electric Cables (description and lm)

  • Satellite Cables (lm)

  • Electric Box (Type and qty)

  • BT Box (qty)

  • Gas Box (Type and qty)

  • Gas Flue (position and qty)

  • Gas Pipework (lm)

  • Condense Pipework (lm)

  • PRV (qty)

  • Overflow (qty)

  • External Tap (qty)

  • Downpipes (Number of downpipes and lm)

  • Soil and Vent Pipe (connections and lm)

  • Vent Pipe (lm)

  • Through soffit (Y/N)

  • Gates (Material and qty)

  • Fence panels (material and qty)

  • Fence posts (material and qty)

  • Walls (construction type and description)

  • Canopy/Porch (material and qty)

  • Vegetation (day work estimation)

  • Handrail (material and lm/brackets)

  • Grab rails (material and qty)

  • Scaffolding Bridge (qty)

  • Window Cills (over or under)

  • Insulated Plinth Detail (lm)

Section 4

STRUCTURAL DEFECTS (E.g. Cracking, subsidence,weak or cored components):

  • Is there any evidence of structural defects ?

  • What are the Details?

  • Requires Competent Person e.g. Structural Engineer

  • Photos of Structural Defects

  • EEM Design:

  • Structural repairs included in the design before works start

  • Structural repair to be carried out by others before works start

  • Site pull-out tests undertaken for mechanical fixings

  • System fixing design calculated for all loading conditions ( wind,system weight etc.)

  • Design eliminates thermal bridging

  • Design minimises thermal bridging

  • Interface design details( weather seals etc.) comply with requirements of PAS 2030 2019

EXISTING RENDER:

  • Comments:

  • Comments on apparent defects

  • Agrees with Retrofit Assessment/Design

  • Photo(s)

  • EEM Design:

  • Requires removal, partial removal, repair

  • Render repair included in the design

  • Render repair measure to be carried out by others prior to works.

PRESENCE OF DAMP (RISING, PENETRATING OR CONDENSATION):

  • Comments

  • Comments on damp

  • Photo(s)

  • EEM Design:

  • Damp treatment included in the design

  • Damp treatment measure to be carried out by others prior to works starting.

FROST DAMAGE:

  • Comments

  • Photo(s)

  • EEM Design:

  • Frost repair included in the design

  • Frost repair measure to be carried out before

DETAIL/LOCATION OF MOVEMENT JOINTS:

  • Are there Movement Joints

  • Comments of movement joints

  • Photo(s)

  • EEM Design:

  • Included in the design

  • Design eliminates Thermal bridging

  • Design minimises Thermal bridging

  • Interface design details (weather seals etc.) comply with the requirements of PAS 2030 2019

MOSS/LICHEN/MOULD/IVY or EFFLORESCENCE

  • Is MOSS/LICHEN/MOULD/IVY or EFFLORESCENCE present

  • Comments of growth

  • Photo(s)

  • EEM Design:

  • Remediation included in the design

  • Design eliminates cold bridging

  • Design minimises cold bridging

  • Interface design details (weather seals etc.) comply with requirements of PAS 2030 2017

Section 5

HEATING SYSTEM - EXTERNAL PIPEWORK/FLUES/METER BOXES etc:

  • Detail type(s) and location(s) of the heating system(s) in the comments below

  • Photos of Heating System

  • Photo of Boiler With Flue location

  • GC Number or Boiler Identification

  • Outside view of flue

  • PRV and Condense

EXISTING VENTILATION:

  • Has the Ventilation strategy been completed?

  • Photo(s)

  • EEM Design:

  • Included in the design

  • Safety of the design (compliance with "Specification for the installation of external wall insulation ensuring the safety and operation of the fuel burning appliances ")

  • Design eliminates Thermal bridging

  • Design minimises Thermal bridging

  • Interface design details (weather seals etc,) comply with the requirements of PAS 2030 2019

  • Comments:

  • Photo(s)

  • Will current roof vents be adequate after EWI has been installed?

  • Is there adequate ventilation in the subfloor?

  • Are there room ventilators / extractors where necessary? (E.G Bathroom/kitchen/utility)

  • Please take pictures of fans and fan flow rates.

  • Are the combustion ventilators adequate for the heating system(s)?

  • If any of the above are no are there provisions to be put in place for new ventilation?

  • If yes please give details

  • EEM Design:

  • Design eliminates Thermal bridging

  • Design minimises Thermal bridging

  • Interface design details (weather seals etc.) comply with requirements of PAS 2030 2019

  • Comments

WINDOWS/DOOR MATERIAL:(Timber/PVC/Other):

  • Photo(s):

  • Window material type

  • Window Renewal

  • Door material type

  • External Door Renewal

  • EEM Design:

  • Design eliminates Thermal bridging

  • Design minimises Thermal bridging

  • Interface design details (weather seals around cill, window frame etc.) comply with requirements of PAS 2030/2019

  • Comments:

EXTERNAL SERVICES/ATTACHMENTS TO THE WALLS e.g (Satellite dish, lights):

  • Photo(s)

  • EEM Design:

  • Design eliminates Thermal bridging

  • Design minimises Thermal bridging

  • Interface design details (weather seals around cill, window frame etc) comply with requirements of PAS 2030/2019

  • Comments:

EXTERNAL ELECTRICAL CABLES/EQUIPMENT:

  • Photo(s)

  • EEM Design:

  • Design eliminates Thermal bridging

  • Design minimises Thermal bridging

  • Design details (Penetration,fixings, weather seals etc.) comply with requirements of PAS 2030 2019

  • Comments:

Section 6

EWI ABUTMENT TO EAVES & ROOFS:

  • Photo(s)

  • EEM Design:

  • Design eliminates Thermal bridging (full continuity between wall and the roof insulation)

  • Design minimises Thermal bridging (partial continuity between wall and roof insulation)

  • Interface design details (weather seals etc.) comply with the requirements of PAS 2030/2019

  • Comments:

EWI ABUTMENT TO OTHER STRUCTURES (Conservatories extensions, garden walls, gate posts etc):

  • Photo(s)

  • EEM Design:

  • Design eliminates Thermal bridging

  • Design minimises Thermal bridging

  • Interface design details (weather seals etc.) comply with requirements of PAS 2030/2019

  • Comments:

RAIN WATER AND DRAINAGE PIPES:

  • Photo(s):

  • EEM Design:

  • Can existing Pipework be moved ?

  • Design eliminates Thermal bridging

  • Design minimises Thermal bridging

  • Design details (Penetrations, fixings, weather seals, mounting blocks etc.) comply with the requirements of PAS 2030/2019

  • Comments:

DAMP PROOF COURSE(DPC) PROVISION AND LOCATION:

  • Photo(s)

  • EEM Design:

  • Design eliminates Thermal bridging

  • Design minimises Thermal bridging

  • Design details (E.g Insulated plinth below DPC) complies with requirements of PAS 2030/2019

  • Comments (including any insulated plinth detail and location)

ARCHITECTURAL FEATURES (e.g. protruding stone work, tile sills, soldier courses):

  • Photo(s)

  • EEM Design:

  • Design eliminates Thermal bridging

  • Design minimises Thermal bridging

  • Design details (Penetrations, fixings, weather seals,etc.) comply with requirements of PAS 2030 2019

  • Comments:

Section 7

Additional information

  • Is a Gas meter present ?

  • Photo of Gas Meter

  • Is an Electric meter present ?

  • Photo of Electric Meter & Consumer Unit with Earthing.

  • Is there a loft space ?

  • Is the loft accessible ?

  • Photos of insulation (inc depth)

  • Photos of party and external walls (if visible)

Sign Off

  • Is the building suitable for EWI, adhering to guidelines as set out in the Building Regulations and requirements of PAS 2030/2019

  • Company

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.