Information
-
Client
-
Audit Title
-
Site Name
-
Conducted on
-
Prepared by
-
Location
-
Site manager
-
Project manager Responsible.
Site office
-
Has the Site Manager been fully briefed on the project by the Project Manager?
-
Has the Site Manager received the Site Manager pack from the PM or PC?
-
Is the noticeboard complete and all documentation in date?<br>
-
Is the project notifiable and, if so, the F10 displayed (answer n/a if the project is not notifiable)?
-
Is the programme displayed?<br>
-
Is there a suitably developed fire plan in place?
-
Is the Health & Safety Law poster displayed?
-
Is there a copy of the client's procedures on site?<br>
-
Is there an accident book on site?
-
Is there a fully stocked first aid kit and eye wash station?
-
Is there a kettle & microwave?
-
Are there sufficient cleaning materials for floors & surfaces?
-
Does the site office/canteen have hot and cold running water?<br>
-
Have paper towels & soap been supplied?
-
Is the site office/canteen clean and tidy?
-
Does the welfare unit have both electric and water supply?
-
Has the Temporary Installation Electrical Certificate been issued for the site welfare?
-
Has drinking water been supplied in the event that mains water is not connected?
Health & Safety files & site paperwork
-
If pre-2000 build is there an R&D Asbestos report on site?<br>
-
If applicable, have the contractors been instructed where the asbestos is located and has it been clearly identified?<br>
-
Are all contractors & visitors to site signing in and out?
-
Has everyone been inducted (including the site manager)?
-
Are the induction sheets completed correctly including CSCS card numbers.<br>
-
Are all contractor insurance certificates in date?<br>
-
Have the individual RAMS sign-off sheets been signed by all parties?
-
Are the RAMS in the site file for the contractors who are currently working on site and have they been signed by all operatives?<br>
-
Has the Day 1 Checklist been completed by the site manager?
-
Have all hazardous substances and materials eg solvents/paints etc been identified and stored correctly by the contractor with safety data sheets supplied?
-
Are there suitable arrangements in place for communicating with non-English speaking personnel? <br>
-
Have the site files and their contents been explained to the Site Manager?
-
Are all relevant permits in place?
-
Has the Site Manager confirmed with the teams that the electrical & build drawings are correct?
-
Is the datum point clearly marked on the GA and have all contractors been made aware of its position?
Site-specific hazards
-
Are there any planned lifting works and, if so, is there a lifting plan in place (please mark n/a if there are no lifting works) ?<br>
-
Are there any roof/high level works which require site specific working at height risk assessments?<br>
Toilets
-
Is there hot & cold running water?
-
Have paper towels, soap, toilet paper & barrier cream been supplied?
-
Are the toilets clean & tidy?
Working site area
-
Is the heras fencing double clipped and does it encompass the working area with no gaps?<br>
-
Are pedestrians & site traffic segregated?
-
Is there suitable and sufficient access/egress to the site? <br>
-
Is there a padlock in place for pedestrian & vehicle gates?
-
Is smoking banned on site except in a designated smoking area?<br>
-
Is the correct signage in place? eg muster point, no entry, client specific signage & RI Site Entrance sign
Working at height
-
Has the scaffold / tower scaffold been erected by a PASMA trained operative?<br>
-
Is there valid inspection documentation available for the scaffold?<br>
-
Is the access equipment/MEWP/cherry picker suitable for the task?<br>
-
If harnesses are being used are they the correct type and being used correctly?<br>
-
Do the operators have the correct ticket for the equipment they are using?
-
Are the MEWPs/Cherrypickers isolated when not in use (key in site hut and not left in machine)?
-
Are the MEWPs/Cherrypickers in serviceable condition?
-
Are all stepladders Class 1 and issued with permit & tag?
Unit
-
Are there a suitable number of fire points located within the the work area and are they compliant?
-
Are all emergency routes clear & free of obstructions?
-
Is there sufficient fire exit signage in place?
-
Is the site clean and tidy and clear of rubbish?<br>
-
Slips, trips & falls - any concerns?
-
Are all contractors wearing required PPE?<br>
-
Are all contractors wearing RI branded hi-vis vest?
-
Is the main electrical incomer safely segregated and temporary supply in place for works?
-
If a temporary supply is in place in the unit, has the Electrical Installation Certificate been issued?
Noise, vibration & hot works
-
Is exposure to noise and vibration being kept to minimum?<br>
-
Is suitable PPE being worn? eg ear defenders, eye protection, gloves
-
Hot works - is the area segregated and fire extinguisher in place?
-
Are pressurised gases being used correctly within the premises?
-
Where used, are heaters safe and set up in a clear area? (good ventilation, segregation from combustible materials)
Miscellaneous items
-
Are excavations being carried out under Permit to Work system, barriered off and covered?<br>
-
Are good manual handling practices being used?
-
Is appropriate lifting equipment provided where necessary?
-
Are all portable appliances fit for purpose and PAT tested?
-
Any additional comments on the build/site?
-
Recommendations/action points for the Site Manager
-
Additional photos